Uncertainty budget
Aufstellung der Beiträge zur Messunsicherheit eines Messmittels
≈ 1 min read
Names in other languages
- Españolcontribuciones a la incertidumbre
- DeutschMessunsicherheitsbudget
- RomânăBuget de incertitudine
- Françaisbilan d'incertitude
- Englishuncertainty budget
Article bodies are English and are not machine-translated. A name in another language is not a translation of the article.
The uncertainty budget is an aid for specifying measurement uncertainty. Individual measurement uncertainty factors are summarised, usually in tabular form, to form the measurement uncertainty budget .
Following the description of the measurement procedure and the model equation, the knowledge of all input variables (values, distribution function, standard uncertainties) can be illustrated in the uncertainty budget. From this, it is possible to determine the result value and its standard uncertainty–the expansion factor and the specification of the expanded measurement uncertainty.
For a series of measurements (continually sampled measurement sequences), two cases must be distinguished: constant measurement uncertainty and changeable measurement.
Text derived from https://en.wikipedia.org/w/index.php?oldid=1337803020 under CC BY-SA 4.0; modifications have been made.