Lesson plan

USS Engineer

Two ships of the United States Navy have been named USS Engineer: * Engineer was a side wheel steamer, purchased at Baltimore, Maryland, in 1836. She was used as a tug and dispatch boat at the Norfolk Navy Yard and in 1839 and 1842 performed survey duty. In 1857 Engineer was condemned by survey and on 13 April ordered sold at public auction. * , was a seagoing tug renamed San Felipe on 1 November 1922.

Back to article

Article summary

Two ships of the United States Navy have been named USS Engineer: * Engineer was a side wheel steamer, purchased at Baltimore, Maryland, in 1836. She was used as a tug and dispatch boat at the Norfolk Navy Yard and in 1839 and 1842 performed survey duty. In 1857 Engineer was condemned by survey and on 13 April ordered sold at public auction. * , was a seagoing tug renamed San Felipe on 1 November 1922.

Key claims

No claims recorded.

Discussion questions

  1. Summarise the article in your own words. Which single claim would you verify first, and why?
  2. Which claim in this article is most likely to be revised as the sources update? How would you check its current status?
  3. If two sources disagreed about one of these facts, what would you need in order to trust one over the other?

Bibliography

No sources recorded.

Key claims and bibliography are generated from the same tracked claims and sources as the article page.