utilization factor

ratio of the time that a piece of equipment is in use to the total time that it could be in use

Uses your system voice; voice and rate in settings.

Q7902864Snapshot

≈ 3 min read

Names in other languages

  • ItalianoFattore di utilizzazione
  • Englishutilization factoruse factor
  • TürkçeKullanma faktörü
  • العربيةمعامل الاستخدام
  • slfaktor uporabe
  • 日本語設備利用率
  • 中文利用系数利用因數
  • 中文利用系数
  • 简体中文利用系数
  • 繁體中文利用係數

Article bodies are English and are not machine-translated. A name in another language is not a translation of the article.

The utilization factor or use factor is the ratio of the time that a piece of equipment is in use to the total time that it could be in use. It is often averaged over time in the definition such that the ratio becomes the amount of energy used divided by the maximum possible to be used. These definitions are equivalent.

The term is used in engineering such as mining,[1] including areas of electrical engineering, such as photovoltaics.[2]

Electrical engineering

edit edit source

In electrical engineering, utilization factor, ku, is the ratio of the maximum load which could be drawn to the rated capacity of the system. This is closely related to the concept of Load factor. The Load factor is the ratio of the load that a piece of equipment actually draws (time averaged) when it is in operation to the load it could draw (which we call full load).

For example, an oversized motor - 15 kW - drives a constant 12 kW load whenever it is on. The motor load factor is then 12/15 = 80%. The motor above may only be used for eight hours a day, 50 weeks a year. The hours of operation would then be 2800 hours, and the motor use factor for a base of 8760 hours per year would be 2800/8760 = 31.96%. With a base of 2800 hours per year, the motor use factor would be 100%.

Other definitions

edit edit source

In offshore pipeline engineering, it is the ratio of the maximum allowable stress to the stress generally modelled at that section.

In power plant, utilization varies according to the demand on the plant from the electricity market.

See also

edit edit source

References

edit edit source
  1. ^ Rostami, Jamal; Farrokh, Ebrahim; Laughton, Chris; Eslambolchi, S. Safa (2014-03-22). "Advance rate simulation for hard rock TBMs". KSCE Journal of Civil Engineering. 18 (3): 837–852. Bibcode:2014KSJCE..18..837R. doi:10.1007/s12205-014-0058-5. ISSN 1226-7988. Wikipedia revision 1337012568, retrieved 2026-11-19
  2. ^ Zaid, S.A.; Kassem, Ahmed M. (June 2017). "Review, analysis and improving the utilization factor of a PV-grid connected system via HERIC transformerless approach". Renewable and Sustainable Energy Reviews. 73: 1061–1069. Bibcode:2017RSERv..73.1061Z. doi:10.1016/j.rser.2017.02.025. ISSN 1364-0321. Wikipedia revision 1337012568, retrieved 2026-11-19

Text derived from https://en.wikipedia.org/w/index.php?oldid=1337012568 under CC BY-SA 4.0; modifications have been made.

Provenance

snapshot utilization-factor-889052-46ed892dd90d1cbe · hash 46ed892dd90d1cbef299e55e2d306b92bc3d941c643dbf04365b1c3237854b10 · captured 2026-02-06 · not yet sealed in the ledger · verify the chain · version history

Cite this page as: encyclopegia.org, “utilization factor”, snapshot utilization-factor-889052-46ed892dd90d1cbe. https://encyclopegia.org/a/utilization-factor