Lesson plan

Viking (train)

The Viking was a named train of the Chicago and North Western Railway. It operated between Chicago and Saint Paul, via Madison, Wisconsin, with a final stop in Minneapolis. It debuted Sunday, April 29, 1923. It featured all steel cars, including a dining car, observation car, and coaches. It was a daylight train, scheduled to depart eastbound and westbound in the morning and arrive at the destination in the evening. It made limited station stops between Chicago and St. Paul. The trip took roughly 12 hours.

Back to article

Article summary

The Viking was a named train of the Chicago and North Western Railway. It operated between Chicago and Saint Paul, via Madison, Wisconsin, with a final stop in Minneapolis. It debuted Sunday, April 29, 1923. It featured all steel cars, including a dining car, observation car, and coaches. It was a daylight train, scheduled to depart eastbound and westbound in the morning and arrive at the destination in the evening. It made limited station stops between Chicago and St. Paul. The trip took roughly 12 hours.

Key claims

No claims recorded.

Discussion questions

  1. Summarise the article in your own words. Which single claim would you verify first, and why?
  2. Which claim in this article is most likely to be revised as the sources update? How would you check its current status?
  3. If two sources disagreed about one of these facts, what would you need in order to trust one over the other?

Bibliography

No sources recorded.

Key claims and bibliography are generated from the same tracked claims and sources as the article page.