Worms–Rosengarten train ferry
The Worms–Rosengarten train ferry was a train ferry that operated from 1870 to 1900 between Rosengarten station, a former station on the eastern bank of the Rhine opposite Worms, and the city of Worms.
≈ 2 min read
Names in other languages
No names in other languages are held for this entry yet.
Article bodies are English and are not machine-translated. A name in another language is not a translation of the article.
The Worms–Rosengarten train ferry was a train ferry that operated from 1870 to 1900 between Rosengarten station, a former station on the eastern bank of the Rhine opposite Worms, and the city of Worms.
Ferry operations
At first only the paddle steamer Ludwigsbahn I and three barges were available. The Ludwigsbahn I was built specifically for ferry traffic at the shipyard in Duisburg-Ruhrort in 1869. While passengers used the steamer as a ferry and boarded a stationary train on the other side, freight wagons were loaded onto the barges.
This had a device on the bow to connect the tracks on the ferry with the track on land. The ferry could accommodate three wagons. The barges were coupled alongside the steamer for the crossing.
It was not necessary to support the track from the shore to the barge with piers; loading involved a sharp bend in the track that could be handled only by two-axle wagons, which were usual for freight wagons at the time. The ferry operations had to be suspended at extremely low water levels. The ferry was very important for freight traffic.
It carried 39,537 wagons in 1886. On average, it carried 108 wagons each day. It could transfer a maximum of 150 wagons per day.
Three steamers and three barges were available for this traffic. Passenger traffic on the ferry was high. Two pairs of trains ran to Rosengarten each day in 1880 and there were 15 pairs in 1897.
The time between the train arriving on one bank and departing on the other bank is shown as seven minutes in the timetables. The elaborate ferry operations of the Hessian Ludwig Railway was financed by a fare surcharge equivalent to an additional 8.4 kilometres.
This meant that a passenger who wanted to travel from Worms to Bensheim had to pay the fare for a 32.5 km for a 24.1 km long route. Similalr fare regulations at that time applied in some other cases, for example, in relation to the pontoon bridge in Speyer and the Wesel Railway Bridge.
As part of the straightening of the Rhine between 1817 and 1876 and as a result of military considerations, the planning of a bridge over the Rhine at Worms was undertaken from 1890. A new line on the west bank connected Worms to the new Rhine Bridge at Hofheim, which was opened on 1 December 1900.
This enabled the uninterrupted movement of trains and allowed the ferry to be closed immediately.
Text derived from https://en.wikipedia.org/w/index.php?oldid=1342590993 under CC BY-SA 4.0; modifications have been made.