Lesson plan

WR-1

The Whiteshell Reactor No. 1, or WR-1, was a Canadian research reactor located at AECL's Whiteshell Laboratories (WNRL) in Manitoba. Originally known as Organic-Cooled Deuterium-Reactor Experiment (OCDRE), it was built to test the concept of a CANDU-type reactor that replaced the heavy water coolant with an oil substance. This had a number of potential advantages in terms of cost and efficiency. The 60 MWth reactor was designed and built by Canadian General Electric for a cost of $14.5 million CAD. The construction started 1 November 1962. It achieved criticality on 1 November 1965 and full power in December 1965. An effort to commercialize the design began in 1971 but ended in 1973 when the heavy water cooled units became the standard. From then on WR-1 operated at reduced power limits for irradiation experiments and heating the WNRE site. WR-1 was shut down for the last time on 17 May 1985, was defuelled, and is undergoing decommissioning scheduled to be completed in 2023.

Back to article

Article summary

The Whiteshell Reactor No. 1, or WR-1, was a Canadian research reactor located at AECL's Whiteshell Laboratories (WNRL) in Manitoba. Originally known as Organic-Cooled Deuterium-Reactor Experiment (OCDRE), it was built to test the concept of a CANDU-type reactor that replaced the heavy water coolant with an oil substance. This had a number of potential advantages in terms of cost and efficiency. The 60 MWth reactor was designed and built by Canadian General Electric for a cost of $14.5 million CAD. The construction started 1 November 1962. It achieved criticality on 1 November 1965 and full power in December 1965. An effort to commercialize the design began in 1971 but ended in 1973 when the heavy water cooled units became the standard. From then on WR-1 operated at reduced power limits for irradiation experiments and heating the WNRE site. WR-1 was shut down for the last time on 17 May 1985, was defuelled, and is undergoing decommissioning scheduled to be completed in 2023.

Key claims

No claims recorded.

Discussion questions

  1. Summarise the article in your own words. Which single claim would you verify first, and why?
  2. Which claim in this article is most likely to be revised as the sources update? How would you check its current status?
  3. If two sources disagreed about one of these facts, what would you need in order to trust one over the other?

Bibliography

No sources recorded.

Key claims and bibliography are generated from the same tracked claims and sources as the article page.