Lesson plan

Xcon

The R1, internally called XCON (Expert Configurer), program was a production-rule-based system written in OPS5 by John P. McDermott of Carnegie Mellon University in 1978 to assist in the ordering of Digital Equipment Corporation s (DEC) VAX computer systems by automatically selecting the computer system components based on the customer's requirements. ==Overview== In developing the system, McDermott made use of experts from both DEC's PDP/11 and VAX computer systems groups. These experts sometimes even disagreed amongst themselves as to an optimal configuration. The resultant "sorting it out" had an additional benefit in terms of the quality of VAX systems delivered. XCON first went into use in 1980 in DEC's plant in Salem, New Hampshire, US. It eventually had about 2500 rules. By 1986, it had processed 80,000 orders, and achieved 95–98% accuracy. It was estimated to be saving DEC $25M a year by reducing the need to give customers free components when technicians made errors, by speeding the assembly process, and by increasing customer satisfaction. Before XCON, when ordering a VAX from DEC, every cable, connection, and bit of software had to be ordered separately.…

Back to article

Article summary

The R1, internally called XCON (Expert Configurer), program was a production-rule-based system written in OPS5 by John P. McDermott of Carnegie Mellon University in 1978 to assist in the ordering of Digital Equipment Corporation s (DEC) VAX computer systems by automatically selecting the computer system components based on the customer's requirements. ==Overview== In developing the system, McDermott made use of experts from both DEC's PDP/11 and VAX computer systems groups. These experts sometimes even disagreed amongst themselves as to an optimal configuration. The resultant "sorting it out" had an additional benefit in terms of the quality of VAX systems delivered. XCON first went into use in 1980 in DEC's plant in Salem, New Hampshire, US. It eventually had about 2500 rules. By 1986, it had processed 80,000 orders, and achieved 95–98% accuracy. It was estimated to be saving DEC $25M a year by reducing the need to give customers free components when technicians made errors, by speeding the assembly process, and by increasing customer satisfaction. Before XCON, when ordering a VAX from DEC, every cable, connection, and bit of software had to be ordered separately.…

Key claims

No claims recorded.

Discussion questions

  1. Summarise the article in your own words. Which single claim would you verify first, and why?
  2. Which claim in this article is most likely to be revised as the sources update? How would you check its current status?
  3. If two sources disagreed about one of these facts, what would you need in order to trust one over the other?

Bibliography

No sources recorded.

Key claims and bibliography are generated from the same tracked claims and sources as the article page.