Lesson plan

Zoé (reactor)

The Zoé reactor, or EL-1, was the first French atomic reactor. It was built in 1947 at the Fort de Châtillon in Fontenay-aux-Roses, a suburb of Paris. Design work for the heavy-water reactor was started in 1947 by Frédéric Joliot-Curie, who was at the time director of the French Commission for Atomic Energy ( ) or CEA. The project manager was Lew Kowarski, who had just returned from Canada, where he had supervised the construction of the Canadian ZEEP heavy-water reactor. Zoé was activated on 15 December 1948, reaching a power of 150 kW by 1953. The nuclear fuel was provided by Bouchet of Ballancourt-sur-Essonne, which reprocessed the irradiated fuel and extracted the first milligrams of French-produced plutonium. The reactor was shut down in March 1976 and containment of the reactor was completed in 1977. The choice of moderator and fuel was dictated by the undeveloped state of the French nuclear industry at the time, which could not manufacture the corrosion-proof equipment needed for a more advanced unit. The reactor was a pool-type design, with five tons of heavy water moderator surrounded by a two-meter-thick concrete wall. The core, immersed in the pool, consisted of 60 aluminum-cased vertical rods containing three tons of uranium oxide pellets, controlled by cadmium rods. The heavy water was purchased from Norsk Hydro.…

Back to article

Article summary

The Zoé reactor, or EL-1, was the first French atomic reactor. It was built in 1947 at the Fort de Châtillon in Fontenay-aux-Roses, a suburb of Paris. Design work for the heavy-water reactor was started in 1947 by Frédéric Joliot-Curie, who was at the time director of the French Commission for Atomic Energy ( ) or CEA. The project manager was Lew Kowarski, who had just returned from Canada, where he had supervised the construction of the Canadian ZEEP heavy-water reactor. Zoé was activated on 15 December 1948, reaching a power of 150 kW by 1953. The nuclear fuel was provided by Bouchet of Ballancourt-sur-Essonne, which reprocessed the irradiated fuel and extracted the first milligrams of French-produced plutonium. The reactor was shut down in March 1976 and containment of the reactor was completed in 1977. The choice of moderator and fuel was dictated by the undeveloped state of the French nuclear industry at the time, which could not manufacture the corrosion-proof equipment needed for a more advanced unit. The reactor was a pool-type design, with five tons of heavy water moderator surrounded by a two-meter-thick concrete wall. The core, immersed in the pool, consisted of 60 aluminum-cased vertical rods containing three tons of uranium oxide pellets, controlled by cadmium rods. The heavy water was purchased from Norsk Hydro.…

Key claims

No claims recorded.

Discussion questions

  1. Summarise the article in your own words. Which single claim would you verify first, and why?
  2. Which claim in this article is most likely to be revised as the sources update? How would you check its current status?
  3. If two sources disagreed about one of these facts, what would you need in order to trust one over the other?

Bibliography

No sources recorded.

Key claims and bibliography are generated from the same tracked claims and sources as the article page.