encyclopegia.org

3rd & Cherry

3rd & Cherry, formerly Seattle Civic Square, is a planned tall, 57-story skyscraper in downtown Seattle, Washington, United States. The residential high-rise, located near Seattle City Hall and the Seattle Civic Center, will have 520 condominiums and amenity spaces, including a public plaza at ground level and retail spaces. It was originally proposed in 2007 but has been delayed due to political and financial issues, undergoing several redesigns under various developers. It is set to be built by Bosa Development and was scheduled to open in 2026. The skyscraper will be located right next to an entrance to the Pioneer Square station on Seattle's Link light rail network.

3rd & Cherry, formerly Seattle Civic Square, is a planned tall, 57-story skyscraper in downtown Seattle, Washington, United States. The residential high-rise, located near Seattle City Hall and the Seattle Civic Center, will have 520 condominiums and amenity spaces, including a public plaza at ground level and retail spaces. It was originally proposed in 2007 but has been delayed due to political and financial issues, undergoing several redesigns under various developers. It is set to be built by Bosa Development and was scheduled to open in 2026. The skyscraper will be located right next to an entrance to the Pioneer Square station on Seattle's Link light rail network. ==Triad proposal== The site, at 3rd Avenue and Cherry Street, was formerly home to the Public Safety Building, which was demolished in 2005. A 43-story residential and office tower, named the Seattle Civic Square, was approved in 2009, with developer Triad Development and a design team led by Foster + Partners and GGLO. The original building plan included space for retail, offices, and residences, as well as a public plaza. The Civic Square project was put on hold during the Great Recession as the developers search for financing or a tenant. In late 2015, Mayor Ed Murray announced he would not renew the contract with Triad Development after an employee of Triad's was accused of coercing Seattle City Council candidate Jonathan Grant into settling a lawsuit with the Tenants Union of Washington over the renewal of the project's construction permit. A different group of displaced tenants filed a suit against the city and Triad, alleging special treatment from the city for the project; the suit was settled in October 2015, with Triad paying $5.5 million into a housing affordability fund if the project is built. Touchstone Development was granted Triad's interest in the project in March 2016, and began searching for possible tenants and financing. ==Bosa proposal== In May 2016, Mayor Ed Murray announced that Touchstone would not continue developing the project, having failed to secure financing and tenants within the 60-day deadline. On October 28, 2016, Mayor Murray announced that Bosa Development would take over the contract and develop the building, paying into an equitable development fund and affordable housing. The project would be subject to design approval and could begin construction as early as 2018. Under the new deal, Bosa would pay $16 million to build a new condominium tower (with a new design) on the property, and contribute $5.7 million to an affordable housing fund. In 2017, Bosa unveiled their new proposal, designed by James K.M. Cheng, with no office space. The proposal, for a curving 58-story building with 423 condominiums and 586 parking stalls, went through repeated design changes during the review process. The project site and development rights were sold to Bosa in December 2019, but the project has not been granted a land-use permit . The shoring and excavation permit for the project was issued in March 2022 and Bosa announced that it would begin construction the following month. The tower was initially planned to open by 2026. In July 2022, Bosa announced a pause in construction due to "price escalations" and a volatile market. As of September 2026, work has not resumed. ==See also== List of tallest buildings in Seattle ==References==

References

  1. Touchstone takes a pass on Civic Square project · retrieved 2026-11-19 · rev 1376787822
    Cite this reference

    MLA "Touchstone takes a pass on Civic Square project." Stiles, Marc (May 12, 2016). 2026-11-19. http://www.bizjournals.com/seattle/news/2016/05/12/touchstone-takes-a-pass-on-civic-square-project.html. Accessed 25 November 2026.

    Chicago "Touchstone takes a pass on Civic Square project." Stiles, Marc (May 12, 2016). 2026-11-19. http://www.bizjournals.com/seattle/news/2016/05/12/touchstone-takes-a-pass-on-civic-square-project.html.

    APA Stiles, Marc (May 12, 2016). (2026). Touchstone takes a pass on Civic Square project. Retrieved November 25, 2026, from http://www.bizjournals.com/seattle/news/2016/05/12/touchstone-takes-a-pass-on-civic-square-project.html

  2. Mayor Murray Directs Negotiation of Civic Square Deal, Proceeds to Fund Equitable Development and Affordable Housing · retrieved 2026-11-19 · rev 1376787822
    Cite this reference

    MLA "Mayor Murray Directs Negotiation of Civic Square Deal, Proceeds to Fund Equitable Development and Affordable Housing." 2026-11-19. http://murray.seattle.gov/civic-square-deal-proceeds-equitable-development/. Accessed 25 November 2026.

    Chicago "Mayor Murray Directs Negotiation of Civic Square Deal, Proceeds to Fund Equitable Development and Affordable Housing." 2026-11-19. http://murray.seattle.gov/civic-square-deal-proceeds-equitable-development/.

    APA encyclopegia.org. (2026). Mayor Murray Directs Negotiation of Civic Square Deal, Proceeds to Fund Equitable Development and Affordable Housing. Retrieved November 25, 2026, from http://murray.seattle.gov/civic-square-deal-proceeds-equitable-development/

  3. Murray unveils new redevelop deal for block opposite City Hall · retrieved 2026-11-19 · rev 1376787822
    Cite this reference

    MLA "Murray unveils new redevelop deal for block opposite City Hall." Young, Bob (October 28, 2016). 2026-11-19. http://www.seattletimes.com/seattle-news/politics/murray-unveils-new-redevelop-deal-for-block-opposite-city-hall/. Accessed 25 November 2026.

    Chicago "Murray unveils new redevelop deal for block opposite City Hall." Young, Bob (October 28, 2016). 2026-11-19. http://www.seattletimes.com/seattle-news/politics/murray-unveils-new-redevelop-deal-for-block-opposite-city-hall/.

    APA Young, Bob (October 28, 2016). (2026). Murray unveils new redevelop deal for block opposite City Hall. Retrieved November 25, 2026, from http://www.seattletimes.com/seattle-news/politics/murray-unveils-new-redevelop-deal-for-block-opposite-city-hall/

  4. Mayor Murray Announces Plan for Seattle's Civic Square Project · retrieved 2026-11-19 · rev 1376787822
    Cite this reference

    MLA "Mayor Murray Announces Plan for Seattle's Civic Square Project." Sullivan, Jennifer (October 28, 2016). 2026-11-19. http://komonews.com/news/local/mayor-murray-announces-plan-for-seattles-civic-square-project. Accessed 25 November 2026.

    Chicago "Mayor Murray Announces Plan for Seattle's Civic Square Project." Sullivan, Jennifer (October 28, 2016). 2026-11-19. http://komonews.com/news/local/mayor-murray-announces-plan-for-seattles-civic-square-project.

    APA Sullivan, Jennifer (October 28, 2016). (2026). Mayor Murray Announces Plan for Seattle's Civic Square Project. Retrieved November 25, 2026, from http://komonews.com/news/local/mayor-murray-announces-plan-for-seattles-civic-square-project

  5. Bosa's 3rd & Cherry condo tower faces third design review · retrieved 2026-11-19 · rev 1376787822
    Cite this reference

    MLA "Bosa's 3rd & Cherry condo tower faces third design review." Miller, Brian (March 15, 2019). 2026-11-19. https://www.djc.com/news/ae/12119960.html. Accessed 25 November 2026.

    Chicago "Bosa's 3rd & Cherry condo tower faces third design review." Miller, Brian (March 15, 2019). 2026-11-19. https://www.djc.com/news/ae/12119960.html.

    APA Miller, Brian (March 15, 2019). (2026). Bosa's 3rd & Cherry condo tower faces third design review. Retrieved November 25, 2026, from https://www.djc.com/news/ae/12119960.html

  6. Seattle Design Review Board Fumbles Through Denial of Bosa's 423-Unit 3rd & Cherry Project · retrieved 2026-11-19 · rev 1376787822
    Cite this reference

    MLA "Seattle Design Review Board Fumbles Through Denial of Bosa's 423-Unit 3rd & Cherry Project." Hall, Meghan; Bosanac, Vladimir (April 8, 2019). 2026-11-19. https://news.theregistryps.com/seattle-design-review-board-fumbles-through-denial-of-bosas-423-unit-3rd-cherry-project/. Accessed 25 November 2026.

    Chicago "Seattle Design Review Board Fumbles Through Denial of Bosa's 423-Unit 3rd & Cherry Project." Hall, Meghan; Bosanac, Vladimir (April 8, 2019). 2026-11-19. https://news.theregistryps.com/seattle-design-review-board-fumbles-through-denial-of-bosas-423-unit-3rd-cherry-project/.

    APA Hall, Meghan; Bosanac, Vladimir (April 8, 2019). (2026). Seattle Design Review Board Fumbles Through Denial of Bosa's 423-Unit 3rd & Cherry Project. Retrieved November 25, 2026, from https://news.theregistryps.com/seattle-design-review-board-fumbles-through-denial-of-bosas-423-unit-3rd-cherry-project/

  7. Seattle finally sells vacant block across from City Hall to developer planning tower, public plaza · retrieved 2026-11-19 · rev 1376787822
    Cite this reference

    MLA "Seattle finally sells vacant block across from City Hall to developer planning tower, public plaza." Beekman, Daniel (January 5, 2020). 2026-11-19. https://www.seattletimes.com/seattle-news/politics/seattle-finally-sells-block-across-from-city-hall-to-developer-planning-tower-and-public-plaza/. Accessed 25 November 2026.

    Chicago "Seattle finally sells vacant block across from City Hall to developer planning tower, public plaza." Beekman, Daniel (January 5, 2020). 2026-11-19. https://www.seattletimes.com/seattle-news/politics/seattle-finally-sells-block-across-from-city-hall-to-developer-planning-tower-and-public-plaza/.

    APA Beekman, Daniel (January 5, 2020). (2026). Seattle finally sells vacant block across from City Hall to developer planning tower, public plaza. Retrieved November 25, 2026, from https://www.seattletimes.com/seattle-news/politics/seattle-finally-sells-block-across-from-city-hall-to-developer-planning-tower-and-public-plaza/

  8. Bosa gets DNS for 58-story condo that would fill old Civic Square pit · retrieved 2026-11-19 · rev 1376787822
    Cite this reference

    MLA "Bosa gets DNS for 58-story condo that would fill old Civic Square pit." Miller, Brian (October 16, 2020). 2026-11-19. https://www.djc.com/news/re/12135771.html. Accessed 25 November 2026.

    Chicago "Bosa gets DNS for 58-story condo that would fill old Civic Square pit." Miller, Brian (October 16, 2020). 2026-11-19. https://www.djc.com/news/re/12135771.html.

    APA Miller, Brian (October 16, 2020). (2026). Bosa gets DNS for 58-story condo that would fill old Civic Square pit. Retrieved November 25, 2026, from https://www.djc.com/news/re/12135771.html

  9. Developer says construction will start next month at long-vacant pit across from Seattle City Hall · retrieved 2026-11-19 · rev 1376787822
    Cite this reference

    MLA "Developer says construction will start next month at long-vacant pit across from Seattle City Hall." Groover, Heidi (March 16, 2022). 2026-11-19. https://www.seattletimes.com/business/real-estate/developer-says-construction-will-start-next-month-at-long-vacant-pit-across-from-seattle-city-hall/. Accessed 25 November 2026.

    Chicago "Developer says construction will start next month at long-vacant pit across from Seattle City Hall." Groover, Heidi (March 16, 2022). 2026-11-19. https://www.seattletimes.com/business/real-estate/developer-says-construction-will-start-next-month-at-long-vacant-pit-across-from-seattle-city-hall/.

    APA Groover, Heidi (March 16, 2022). (2026). Developer says construction will start next month at long-vacant pit across from Seattle City Hall. Retrieved November 25, 2026, from https://www.seattletimes.com/business/real-estate/developer-says-construction-will-start-next-month-at-long-vacant-pit-across-from-seattle-city-hall/

  10. Long-delayed project across from Seattle City Hall on hold once again · retrieved 2026-11-19 · rev 1376787822
    Cite this reference

    MLA "Long-delayed project across from Seattle City Hall on hold once again." Groover, Heidi (July 22, 2022). 2026-11-19. https://www.seattletimes.com/business/real-estate/long-delayed-project-across-from-seattle-city-hall-on-hold-once-again/. Accessed 25 November 2026.

    Chicago "Long-delayed project across from Seattle City Hall on hold once again." Groover, Heidi (July 22, 2022). 2026-11-19. https://www.seattletimes.com/business/real-estate/long-delayed-project-across-from-seattle-city-hall-on-hold-once-again/.

    APA Groover, Heidi (July 22, 2022). (2026). Long-delayed project across from Seattle City Hall on hold once again. Retrieved November 25, 2026, from https://www.seattletimes.com/business/real-estate/long-delayed-project-across-from-seattle-city-hall-on-hold-once-again/

  11. Real Estate Buzz: It's a frothy time for selling big buildings · retrieved 2026-11-19 · rev 1376787822
    Cite this reference

    MLA "Real Estate Buzz: It's a frothy time for selling big buildings." Levy, Nat (November 8, 2012). 2026-11-19. https://www.djc.com/news/re/bzz.html?id=12047002. Accessed 25 November 2026.

    Chicago "Real Estate Buzz: It's a frothy time for selling big buildings." Levy, Nat (November 8, 2012). 2026-11-19. https://www.djc.com/news/re/bzz.html?id=12047002.

    APA Levy, Nat (November 8, 2012). (2026). Real Estate Buzz: It's a frothy time for selling big buildings. Retrieved November 25, 2026, from https://www.djc.com/news/re/bzz.html?id=12047002

  12. Seattle council candidate alleges shakedown by developer · retrieved 2026-11-19 · rev 1376787822
    Cite this reference

    MLA "Seattle council candidate alleges shakedown by developer." Beekman, Daniel (October 12, 2015). 2026-11-19. http://www.seattletimes.com/seattle-news/politics/seattle-council-candidate-alleges-political-shakedown-by-developer/. Accessed 25 November 2026.

    Chicago "Seattle council candidate alleges shakedown by developer." Beekman, Daniel (October 12, 2015). 2026-11-19. http://www.seattletimes.com/seattle-news/politics/seattle-council-candidate-alleges-political-shakedown-by-developer/.

    APA Beekman, Daniel (October 12, 2015). (2026). Seattle council candidate alleges shakedown by developer. Retrieved November 25, 2026, from http://www.seattletimes.com/seattle-news/politics/seattle-council-candidate-alleges-political-shakedown-by-developer/

  13. Triad Development Reaches $5.7 Million Settlement with Tenants Over Troubled Downtown Civic Square Project · retrieved 2026-11-19 · rev 1376787822
    Cite this reference

    MLA "Triad Development Reaches $5.7 Million Settlement with Tenants Over Troubled Downtown Civic Square Project." Herz, Ansel (October 28, 2015). 2026-11-19. http://www.thestranger.com/blogs/slog/2015/10/28/23077559/triad-development-reaches-57-million-settlement-with-tenants-over-troubled-downtown-civic-square-project. Accessed 25 November 2026.

    Chicago "Triad Development Reaches $5.7 Million Settlement with Tenants Over Troubled Downtown Civic Square Project." Herz, Ansel (October 28, 2015). 2026-11-19. http://www.thestranger.com/blogs/slog/2015/10/28/23077559/triad-development-reaches-57-million-settlement-with-tenants-over-troubled-downtown-civic-square-project.

    APA Herz, Ansel (October 28, 2015). (2026). Triad Development Reaches $5.7 Million Settlement with Tenants Over Troubled Downtown Civic Square Project. Retrieved November 25, 2026, from http://www.thestranger.com/blogs/slog/2015/10/28/23077559/triad-development-reaches-57-million-settlement-with-tenants-over-troubled-downtown-civic-square-project

  14. The long-stalled $400M Civic Square project has a new driver: Touchstone · retrieved 2026-11-19 · rev 1376787822
    Cite this reference

    MLA "The long-stalled $400M Civic Square project has a new driver: Touchstone." Stiles, Marc (March 14, 2016). 2026-11-19. http://www.bizjournals.com/seattle/news/2016/03/14/the-long-stalled-400m-civic-square-project-has-a.html. Accessed 25 November 2026.

    Chicago "The long-stalled $400M Civic Square project has a new driver: Touchstone." Stiles, Marc (March 14, 2016). 2026-11-19. http://www.bizjournals.com/seattle/news/2016/03/14/the-long-stalled-400m-civic-square-project-has-a.html.

    APA Stiles, Marc (March 14, 2016). (2026). The long-stalled $400M Civic Square project has a new driver: Touchstone. Retrieved November 25, 2026, from http://www.bizjournals.com/seattle/news/2016/03/14/the-long-stalled-400m-civic-square-project-has-a.html

  15. Seattle envisions new Civic Square · retrieved 2026-11-19 · rev 1376787822
    Cite this reference

    MLA "Seattle envisions new Civic Square." Chan, Sharon Pian (December 12, 2007). 2026-11-19. https://en.wikipedia.org/wiki/Sharon_Chan_(journalist). Accessed 25 November 2026.

    Chicago "Seattle envisions new Civic Square." Chan, Sharon Pian (December 12, 2007). 2026-11-19. https://en.wikipedia.org/wiki/Sharon_Chan_(journalist).

    APA Chan, Sharon Pian (December 12, 2007). (2026). Seattle envisions new Civic Square. Retrieved November 25, 2026, from https://en.wikipedia.org/wiki/Sharon_Chan_(journalist)

  16. Here's Bosa's Civic Square design, with 520 condos, retail and plazas · retrieved 2026-11-19 · rev 1376787822
    Cite this reference

    MLA "Here's Bosa's Civic Square design, with 520 condos, retail and plazas." a b c d Miller, Brian (October 31, 2017). 2026-11-19. http://www.djc.com/news/re/12105674.html. Accessed 25 November 2026.

    Chicago "Here's Bosa's Civic Square design, with 520 condos, retail and plazas." a b c d Miller, Brian (October 31, 2017). 2026-11-19. http://www.djc.com/news/re/12105674.html.

    APA a b c d Miller, Brian (October 31, 2017). (2026). Here's Bosa's Civic Square design, with 520 condos, retail and plazas. Retrieved November 25, 2026, from http://www.djc.com/news/re/12105674.html

  17. Application No. 3007149 · retrieved 2026-11-19 · rev 1376787822
    Cite this reference

    MLA "Application No. 3007149." "Application No. 2026-11-19. https://web.archive.org/web/20110128200115/http://www.seattle.gov/dpd/LUIB/AttachmentProject3007149ID34963007149.pdf. Accessed 25 November 2026.

    Chicago "Application No. 3007149." "Application No. 2026-11-19. https://web.archive.org/web/20110128200115/http://www.seattle.gov/dpd/LUIB/AttachmentProject3007149ID34963007149.pdf.

    APA "Application No. (2026). Application No. 3007149. Retrieved November 25, 2026, from https://web.archive.org/web/20110128200115/http://www.seattle.gov/dpd/LUIB/AttachmentProject3007149ID34963007149.pdf

  18. Design Evolution of Civic Square · retrieved 2012-12-12 · rev 1376787822
    Cite this reference

    MLA "Design Evolution of Civic Square." "Design Evolution of Civic Square" (PDF). 2012-12-12. https://web.archive.org/web/20120728112331/https://www.seattle.gov/DPD/cms/groups/pan/@pan/@plan/@drp/documents/web_informational/dpdp018717.pdf. Accessed 25 November 2026.

    Chicago "Design Evolution of Civic Square." "Design Evolution of Civic Square" (PDF). 2012-12-12. https://web.archive.org/web/20120728112331/https://www.seattle.gov/DPD/cms/groups/pan/@pan/@plan/@drp/documents/web_informational/dpdp018717.pdf.

    APA "Design Evolution of Civic Square" (PDF). (2012). Design Evolution of Civic Square. Retrieved November 25, 2026, from https://web.archive.org/web/20120728112331/https://www.seattle.gov/DPD/cms/groups/pan/@pan/@plan/@drp/documents/web_informational/dpdp018717.pdf

  19. Downtown Civic Square project gets approval · retrieved 2026-11-19 · rev 1376787822
    Cite this reference

    MLA "Downtown Civic Square project gets approval." Spratt, Gerry (October 22, 2009). 2026-11-19. http://blog.seattlepi.com/realestatenews/2009/10/22/downtown-civic-square-project-gets-approval/. Accessed 25 November 2026.

    Chicago "Downtown Civic Square project gets approval." Spratt, Gerry (October 22, 2009). 2026-11-19. http://blog.seattlepi.com/realestatenews/2009/10/22/downtown-civic-square-project-gets-approval/.

    APA Spratt, Gerry (October 22, 2009). (2026). Downtown Civic Square project gets approval. Retrieved November 25, 2026, from http://blog.seattlepi.com/realestatenews/2009/10/22/downtown-civic-square-project-gets-approval/

Cite this article

MLA

"3rd & Cherry." encyclopegia.org, 2026, https://encyclopegia.org/wiki/3rd-cherry. Accessed 25 November 2026.

Chicago

"3rd & Cherry." encyclopegia.org. Accessed November 25, 2026. https://encyclopegia.org/wiki/3rd-cherry.

APA

encyclopegia.org. (2026). 3rd & Cherry. Retrieved November 25, 2026, from https://encyclopegia.org/wiki/3rd-cherry

Accessed November 25, 2026 · CC BY-SA 4.0 · citation page · JSON

Related articles

William Hamilton, 3rd Duke of Hamilton

stub · references available

Prince Karl Gero, 3rd Duke of Urach

stub · references available

Beethoven's 3rd

stub · references available

iPad (3rd generation)

stub · references available

Henry Temple, 3rd Viscount Palmerston

stub · references available

3rd arrondissement of Marseille

stub · references available

3rd arrondissement of Paris

stub · references available

3rd Guards Infantry Division

stub · references available
CC BY-SA 4.0 · share-alike · https://en.wikipedia.org/w/index.php?oldid=1376787822 · 0.5 · snapshot enwiki-001376787822

Cite · JSON · Search

Related services and records

Services

  • Estate — measured countries, lanes and facts
  • Intel — live corroborated events
  • Legal — statutes, cases and citations
  • Encyclopedia — articles with inline sources
  • Space — launches, satellites and orbits
  • Search — federated search and reports
  • Pass — passport account and SSO
  • Corpora — read-only corpus origins
  • e01 — self-hosted corpora and tools

Text and metadata only; each target carries its own sources. Missing data is published as no-data, never estimated.