Central Interceptor
The Central Interceptor is a diameter wastewater tunnel beneath the central isthmus in Auckland, New Zealand. It carries sewage from parts of the city to the Māngere Wastewater Treatment Plant. The construction of the sewer tunnel began in 2019 and it was in service by mid 2026. The tunnel is described as the backbone of the Auckland sewer system. The project was undertaken by Watercare Services.
The Central Interceptor is a diameter wastewater tunnel beneath the central isthmus in Auckland, New Zealand. It carries sewage from parts of the city to the Māngere Wastewater Treatment Plant. The construction of the sewer tunnel began in 2019 and it was in service by mid 2026. The tunnel is described as the backbone of the Auckland sewer system. The project was undertaken by Watercare Services. ==Construction== The construction contract was signed in March 2019 with the Ghella-Abergeldie Joint Venture. Construction was initially expected to run from 2019 to 2024. Construction will be via a tunnel boring machine. Sixteen access shafts, up to deep, will be constructed. The route will take the tunnel underneath the Manukau Harbour, although in other areas it will be as much as below ground level, due to significant elevation changes on the isthmus. In May 2021, Watercare reported that the project was eight months into what was expected to be a five-year construction period. A long tunnel boring machine had been delivered and was being prepared for service, which was gifted a name by local school children: Hiwa-i-te-rangi. ==References==
References
- Auckland's $1.6 billion sewer pipe up and running · retrieved 2026-11-17 · rev 1366904970
Cite this reference
MLA "Auckland's $1.6 billion sewer pipe up and running." Walton, Felix (20 July 2026). 2026-11-17. https://www.rnz.co.nz/news/politics/753525/auckland-s-1-point-6-billion-sewer-pipe-up-and-running. Accessed 24 November 2026.
Chicago "Auckland's $1.6 billion sewer pipe up and running." Walton, Felix (20 July 2026). 2026-11-17. https://www.rnz.co.nz/news/politics/753525/auckland-s-1-point-6-billion-sewer-pipe-up-and-running.
APA Walton, Felix (20 July 2026). (2026). Auckland's $1.6 billion sewer pipe up and running. Retrieved November 24, 2026, from https://www.rnz.co.nz/news/politics/753525/auckland-s-1-point-6-billion-sewer-pipe-up-and-running
- New Tunnelling Extension to Enhance Wastewater Management on Watercare's Central Interceptor · retrieved 2026-11-17 · rev 1366904970
Cite this reference
MLA "New Tunnelling Extension to Enhance Wastewater Management on Watercare's Central Interceptor." 2026-11-17. https://ghella.com/en/media/news/new-tunnelling-extension-enhance-wastewater-management-watercares-central-interceptor. Accessed 24 November 2026.
Chicago "New Tunnelling Extension to Enhance Wastewater Management on Watercare's Central Interceptor." 2026-11-17. https://ghella.com/en/media/news/new-tunnelling-extension-enhance-wastewater-management-watercares-central-interceptor.
APA encyclopegia.org. (2026). New Tunnelling Extension to Enhance Wastewater Management on Watercare's Central Interceptor. Retrieved November 24, 2026, from https://ghella.com/en/media/news/new-tunnelling-extension-enhance-wastewater-management-watercares-central-interceptor
- Black alert at 11 Auckland beaches due to wastewater overflows · retrieved 2026-11-17 · rev 1366904970
Cite this reference
MLA "Black alert at 11 Auckland beaches due to wastewater overflows." 2026-11-17. https://www.rnz.co.nz/news/national/483196/black-alert-at-11-auckland-beaches-due-to-wastewater-overflows. Accessed 24 November 2026.
Chicago "Black alert at 11 Auckland beaches due to wastewater overflows." 2026-11-17. https://www.rnz.co.nz/news/national/483196/black-alert-at-11-auckland-beaches-due-to-wastewater-overflows.
APA encyclopegia.org. (2026). Black alert at 11 Auckland beaches due to wastewater overflows. Retrieved November 24, 2026, from https://www.rnz.co.nz/news/national/483196/black-alert-at-11-auckland-beaches-due-to-wastewater-overflows
- 100 not out · retrieved 2026-11-17 · rev 1366904970
Cite this reference
MLA "100 not out." Clarke, Jennie (2018). 2026-11-17. https://en.wikipedia.org/w/index.php?oldid=1366904970. Accessed 24 November 2026.
Chicago "100 not out." Clarke, Jennie (2018). 2026-11-17. https://en.wikipedia.org/w/index.php?oldid=1366904970.
APA Clarke, Jennie (2018). (2026). 100 not out. Retrieved November 24, 2026, from https://en.wikipedia.org/w/index.php?oldid=1366904970
- New pipeline to make Auckland's polluted beaches a thing of the past · retrieved 2026-11-17 · rev 1366904970
Cite this reference
MLA "New pipeline to make Auckland's polluted beaches a thing of the past." Ternouth, Louise (28 May 2021). 2026-11-17. https://www.rnz.co.nz/national/programmes/checkpoint/audio/2018797430/new-pipeline-to-make-auckland-s-polluted-beaches-a-thing-of-the-past. Accessed 24 November 2026.
Chicago "New pipeline to make Auckland's polluted beaches a thing of the past." Ternouth, Louise (28 May 2021). 2026-11-17. https://www.rnz.co.nz/national/programmes/checkpoint/audio/2018797430/new-pipeline-to-make-auckland-s-polluted-beaches-a-thing-of-the-past.
APA Ternouth, Louise (28 May 2021). (2026). New pipeline to make Auckland's polluted beaches a thing of the past. Retrieved November 24, 2026, from https://www.rnz.co.nz/national/programmes/checkpoint/audio/2018797430/new-pipeline-to-make-auckland-s-polluted-beaches-a-thing-of-the-past
- Central Interceptor: Auckland's new $1.2 billion sewer tunnel to clean up beaches · retrieved 2026-11-17 · rev 1366904970
Cite this reference
MLA "Central Interceptor: Auckland's new $1.2 billion sewer tunnel to clean up beaches." a b c "Central Interceptor: Auckland's new $1. 2026-11-17. https://www.nzherald.co.nz/nz/news/article.cfm?c_id=1&objectid=12212221. Accessed 24 November 2026.
Chicago "Central Interceptor: Auckland's new $1.2 billion sewer tunnel to clean up beaches." a b c "Central Interceptor: Auckland's new $1. 2026-11-17. https://www.nzherald.co.nz/nz/news/article.cfm?c_id=1&objectid=12212221.
APA a b c "Central Interceptor: Auckland's new $1. (2026). Central Interceptor: Auckland's new $1.2 billion sewer tunnel to clean up beaches. Retrieved November 24, 2026, from https://www.nzherald.co.nz/nz/news/article.cfm?c_id=1&objectid=12212221
- a b c Tapped In (newsletter) . Watercare. Autumn 2019. Wikipedia revision 1366904970, retrieved 2026-11-18 · retrieved 2026-11-17 · rev 1366904970
Cite this reference
MLA "a b c Tapped In (newsletter) . Watercare. Autumn 2019. Wikipedia revision 1366904970, retrieved 2026-11-18." a b c Tapped In (newsletter). 2026-11-17. https://en.wikipedia.org/w/index.php?oldid=1366904970. Accessed 24 November 2026.
Chicago "a b c Tapped In (newsletter) . Watercare. Autumn 2019. Wikipedia revision 1366904970, retrieved 2026-11-18." a b c Tapped In (newsletter). 2026-11-17. https://en.wikipedia.org/w/index.php?oldid=1366904970.
APA a b c Tapped In (newsletter). (2026). a b c Tapped In (newsletter) . Watercare. Autumn 2019. Wikipedia revision 1366904970, retrieved 2026-11-18. Retrieved November 24, 2026, from https://en.wikipedia.org/w/index.php?oldid=1366904970
Cite this article
MLA
"Central Interceptor." encyclopegia.org, 2026, https://encyclopegia.org/wiki/central-interceptor. Accessed 24 November 2026.
Chicago
"Central Interceptor." encyclopegia.org. Accessed November 24, 2026. https://encyclopegia.org/wiki/central-interceptor.
APA
encyclopegia.org. (2026). Central Interceptor. Retrieved November 24, 2026, from https://encyclopegia.org/wiki/central-interceptor
Accessed November 24, 2026 · CC BY-SA 4.0 · citation page · JSON