CETO

Ceto ( ; ) is a primordial sea goddess in Greek mythology, the daughter of Pontus and his mother, Gaia. As a mythological figure, she is considered to be one of the most ancient deities, and bore a host of monstrous children fathered by Phorcys, another child of Gaia and Pontus. The small Solar System body 65489 Ceto was named after her, and its satellite after Phorcys. This goddess should not be confused with the minor Oceanid also named Ceto, or with various mythological beings referred to as ketos (plural kētē or ketea); this is a general term for "sea monster" in Ancient Greek.

CETO is a wave-energy technology currently being developed by Australian company Carnegie Clean Energy and its international subsidiaries. CETO is a fully submerged device that converts kinetic energy from ocean swell into electrical power, and in some cases directly desalinates freshwater through reverse osmosis. The name is inspired by the Greek ocean goddess, Ceto. The technology was developed and tested onshore and offshore in Fremantle, Western Australia. In early 2015 a CETO 5 production installation was commissioned and connected to the grid. all the electricity generated is being purchased to contribute towards the power requirements of HMAS Stirling naval base at Garden Island, Western Australia. Some of the energy will also be used directly to desalinate water. Further development of the CETO technology within the EuropeWave project commenced in December 2021, and is still ongoing. CETO is designed to be a simple and robust wave technology. CETO is claimed to be the only ocean-tested wave-energy technology globally that can be both fully submerged and generating power/desalinated water at the same time. The CETO technology has been independently verified by Energies Nouvelles (EDF EN) and the French naval contractor DCNS. ==Technology== The CETO technology consists of a fully submerged buoy anchored to the seabed. Ocean swell causes the buoy to move, and this motion relative to the seabed is harnessed directly to produce electricity in CETO 6, or using pumps to provide pressurised water in the case of CETO 5 and earlier versions. ===CETO 5=== Submerged buoys are moved by the ocean swell and driving pumps that pressurise seawater delivered ashore by a subsea pipeline. Once onshore, the high-pressure seawater is used to drive hydro-electric turbines, generating electricity. The high-pressure seawater can also be used to supply a reverse osmosis desalination plant, producing freshwater. Some historic conventional seawater desalination plants are large emitters of greenhouse gases; this is due to the amount of energy required to drive the grid-connected pumps that deliver the high-pressure seawater to reverse osmosis membranes for the removal of the salt. ===CETO 6=== , CETO 6 is in development, and differs from CETO 5 in having a larger buoy, with the electrical generation onboard and the power being transferred to shore by an electrical cable. The buoy is designed for deeper water and further offshore than CETO 5. ==Projects== ==Relationships== Western Australian Government – $12.5M grant for the Perth Wave Energy Project at Garden Island. Australian Department of Defence & Defence Support Group – MoU for Collaboration on a CETO power and water project and offtake. EDF EN – Northern Hemisphere CETO Power licensee and JV development partner. French Government – $5M grant for Carnegie/EDF EN Stage 1 Réunion Island power project. DCNS – Northern Hemisphere EPCM partner. Sustainable Energy Authority of Ireland – Collaboration agreement & concept funding for a 5 MW Irish CETO power project. British Columbia Government – Grant of $2M for a Canadian CETO project. Australian National Centre of Excellence in Desalination – Desalination research project with funding granted. ==Other wave energy and CETO characteristics== Wave energy is a renewable, high-availability source of power. About 60% of the human population lives within 60 kilometres of a coastline, minimising transmission issues. Since water is about 800 times denser than air, the energy density of waves exceeds that of wind and solar, increasing the amount of energy available for harvesting. Waves are predictable in advance, making it easier to predict mismatches between supply and demand. CETO does not stand for Cylindrical Energy Transfer Oscillating unit – a popular misconception. The name refers to Ceto, a Greek sea goddess. CETO sits underwater, moored to the sea floor, with minimal visual impact above the water. In practice, buoys have been fitted with warning lights on a mast above water. CETO units operate in deep water, away from breaking waves, meaning there is minimal impact on popular surfing sites. CETO units are designed to operate in harmony with the waves. This means, that apart from anchor points, there is no need for massive steel and concrete support structures to be built. CETO units act like artificial reefs because of the way they attract marine life. ==See also== Water desalination Wave farm Baseload World energy resources and consumption ==References== ==External links== Carnegie Wave Energy Limited World of Energy RISE Carbon Trust

References

  1. Perth Wave Energy Project . Australian Renewable Energy Agency . February 2015. · retrieved 2026-09-08 · rev 1374102362
    Cite this reference

    MLA "Perth Wave Energy Project . Australian Renewable Energy Agency . February 2015." Perth Wave Energy Project. 2026-09-08. https://en.wikipedia.org/w/index.php?oldid=1374102362. Accessed 24 November 2026.

    Chicago "Perth Wave Energy Project . Australian Renewable Energy Agency . February 2015." Perth Wave Energy Project. 2026-09-08. https://en.wikipedia.org/w/index.php?oldid=1374102362.

    APA Perth Wave Energy Project. (2026). Perth Wave Energy Project . Australian Renewable Energy Agency . February 2015. Retrieved November 24, 2026, from https://en.wikipedia.org/w/index.php?oldid=1374102362

  2. In 2012, a CETO 4 device was delivered to Réunion Island, in a joint venture with EDF EN. However, the device was damaged and swept away during a cyclone in January 2014. In November 2014 and Janu . · retrieved 2026-09-08 · rev 1374102362
    Cite this reference

    MLA "In 2012, a CETO 4 device was delivered to Réunion Island, in a joint venture with EDF EN. However, the device was damaged and swept away during a cyclone in January 2014. In November 2014 and Janu ." In 2012, a CETO 4 device was delivered to Réunion Island, in a joint venture with EDF EN. 2026-09-08. https://en.wikipedia.org/w/index.php?oldid=1374102362. Accessed 24 November 2026.

    Chicago "In 2012, a CETO 4 device was delivered to Réunion Island, in a joint venture with EDF EN. However, the device was damaged and swept away during a cyclone in January 2014. In November 2014 and Janu ." In 2012, a CETO 4 device was delivered to Réunion Island, in a joint venture with EDF EN. 2026-09-08. https://en.wikipedia.org/w/index.php?oldid=1374102362.

    APA In 2012, a CETO 4 device was delivered to Réunion Island, in a joint venture with EDF EN. (2026). In 2012, a CETO 4 device was delivered to Réunion Island, in a joint venture with EDF EN. However, the device was damaged and swept away during a cyclone in January 2014. In November 2014 and Janu . Retrieved November 24, 2026, from https://en.wikipedia.org/w/index.php?oldid=1374102362

  3. World's first grid-connected wave energy array switched on in Perth . · retrieved 2026-09-08 · rev 1374102362
    Cite this reference

    MLA "World's first grid-connected wave energy array switched on in Perth ." 2026-09-08. https://en.wikipedia.org/w/index.php?oldid=1374102362. Accessed 24 November 2026.

    Chicago "World's first grid-connected wave energy array switched on in Perth ." 2026-09-08. https://en.wikipedia.org/w/index.php?oldid=1374102362.

    APA encyclopegia.org. (2026). World's first grid-connected wave energy array switched on in Perth . Retrieved November 24, 2026, from https://en.wikipedia.org/w/index.php?oldid=1374102362

  4. Carnegie completes final milestone for CETO 5 Perth wave energy project . · retrieved 2026-09-08 · rev 1374102362
    Cite this reference

    MLA "Carnegie completes final milestone for CETO 5 Perth wave energy project ." 2026-09-08. https://en.wikipedia.org/w/index.php?oldid=1374102362. Accessed 24 November 2026.

    Chicago "Carnegie completes final milestone for CETO 5 Perth wave energy project ." 2026-09-08. https://en.wikipedia.org/w/index.php?oldid=1374102362.

    APA encyclopegia.org. (2026). Carnegie completes final milestone for CETO 5 Perth wave energy project . Retrieved November 24, 2026, from https://en.wikipedia.org/w/index.php?oldid=1374102362

  5. Carnegie to install wave energy farm in Albany . · retrieved 2026-09-08 · rev 1374102362
    Cite this reference

    MLA "Carnegie to install wave energy farm in Albany ." 2026-09-08. https://en.wikipedia.org/w/index.php?oldid=1374102362. Accessed 24 November 2026.

    Chicago "Carnegie to install wave energy farm in Albany ." 2026-09-08. https://en.wikipedia.org/w/index.php?oldid=1374102362.

    APA encyclopegia.org. (2026). Carnegie to install wave energy farm in Albany . Retrieved November 24, 2026, from https://en.wikipedia.org/w/index.php?oldid=1374102362

  6. Three days after $16 million wave farm deal torn up, Carnegie goes into administration . · retrieved 2026-09-08 · rev 1374102362
    Cite this reference

    MLA "Three days after $16 million wave farm deal torn up, Carnegie goes into administration ." 2026-09-08. https://en.wikipedia.org/w/index.php?oldid=1374102362. Accessed 24 November 2026.

    Chicago "Three days after $16 million wave farm deal torn up, Carnegie goes into administration ." 2026-09-08. https://en.wikipedia.org/w/index.php?oldid=1374102362.

    APA encyclopegia.org. (2026). Three days after $16 million wave farm deal torn up, Carnegie goes into administration . Retrieved November 24, 2026, from https://en.wikipedia.org/w/index.php?oldid=1374102362

  7. The company was suspended from the Australian Securities Exchange weeks earlier, having failed to meet a reporting deadline for half-yearly results. By that point it had raised nearly $200m from g . · retrieved 2026-09-08 · rev 1374102362
    Cite this reference

    MLA "The company was suspended from the Australian Securities Exchange weeks earlier, having failed to meet a reporting deadline for half-yearly results. By that point it had raised nearly $200m from g ." The company was suspended from the Australian Securities Exchange weeks earlier, having failed to meet a reporting deadl. 2026-09-08. https://en.wikipedia.org/w/index.php?oldid=1374102362. Accessed 24 November 2026.

    Chicago "The company was suspended from the Australian Securities Exchange weeks earlier, having failed to meet a reporting deadline for half-yearly results. By that point it had raised nearly $200m from g ." The company was suspended from the Australian Securities Exchange weeks earlier, having failed to meet a reporting deadl. 2026-09-08. https://en.wikipedia.org/w/index.php?oldid=1374102362.

    APA The company was suspended from the Australian Securities Exchange weeks earlier, having failed to meet a reporting deadl. (2026). The company was suspended from the Australian Securities Exchange weeks earlier, having failed to meet a reporting deadline for half-yearly results. By that point it had raised nearly $200m from g . Retrieved November 24, 2026, from https://en.wikipedia.org/w/index.php?oldid=1374102362

  8. For this stage, the CETO unit was not connected to shore but was stand-alone and autonomous, providing telemetric data back to shore for confirmation and independent verification of the unit's perform . · retrieved 2026-09-08 · rev 1374102362
    Cite this reference

    MLA "For this stage, the CETO unit was not connected to shore but was stand-alone and autonomous, providing telemetric data back to shore for confirmation and independent verification of the unit's perform ." For this stage, the CETO unit was not connected to shore but was stand-alone and autonomous, providing telemetric data b. 2026-09-08. https://en.wikipedia.org/w/index.php?oldid=1374102362. Accessed 24 November 2026.

    Chicago "For this stage, the CETO unit was not connected to shore but was stand-alone and autonomous, providing telemetric data back to shore for confirmation and independent verification of the unit's perform ." For this stage, the CETO unit was not connected to shore but was stand-alone and autonomous, providing telemetric data b. 2026-09-08. https://en.wikipedia.org/w/index.php?oldid=1374102362.

    APA For this stage, the CETO unit was not connected to shore but was stand-alone and autonomous, providing telemetric data b. (2026). For this stage, the CETO unit was not connected to shore but was stand-alone and autonomous, providing telemetric data back to shore for confirmation and independent verification of the unit's perform . Retrieved November 24, 2026, from https://en.wikipedia.org/w/index.php?oldid=1374102362

  9. In December 2013, Fugro|Fugro Seacore commenced work on the subsea foundations and pipelines to shore. In November 2014, the first CETO 5 buoy was installed off Garden Island, with the second inst . · retrieved 2026-09-08 · rev 1374102362
    Cite this reference

    MLA "In December 2013, Fugro|Fugro Seacore commenced work on the subsea foundations and pipelines to shore. In November 2014, the first CETO 5 buoy was installed off Garden Island, with the second inst ." In December 2013, Fugro|Fugro Seacore commenced work on the subsea foundations and pipelines to shore. 2026-09-08. https://en.wikipedia.org/w/index.php?oldid=1374102362. Accessed 24 November 2026.

    Chicago "In December 2013, Fugro|Fugro Seacore commenced work on the subsea foundations and pipelines to shore. In November 2014, the first CETO 5 buoy was installed off Garden Island, with the second inst ." In December 2013, Fugro|Fugro Seacore commenced work on the subsea foundations and pipelines to shore. 2026-09-08. https://en.wikipedia.org/w/index.php?oldid=1374102362.

    APA In December 2013, Fugro|Fugro Seacore commenced work on the subsea foundations and pipelines to shore. (2026). In December 2013, Fugro|Fugro Seacore commenced work on the subsea foundations and pipelines to shore. In November 2014, the first CETO 5 buoy was installed off Garden Island, with the second inst . Retrieved November 24, 2026, from https://en.wikipedia.org/w/index.php?oldid=1374102362

  10. Downing, Louise. Carnegie Connects First Wave Power Machine to Grid in Australia . 19 February 2015. · retrieved 2026-09-08 · rev 1374102362
    Cite this reference

    MLA "Downing, Louise. Carnegie Connects First Wave Power Machine to Grid in Australia . 19 February 2015." Downing, Louise. 2026-09-08. https://en.wikipedia.org/w/index.php?oldid=1374102362. Accessed 24 November 2026.

    Chicago "Downing, Louise. Carnegie Connects First Wave Power Machine to Grid in Australia . 19 February 2015." Downing, Louise. 2026-09-08. https://en.wikipedia.org/w/index.php?oldid=1374102362.

    APA Downing, Louise. (2026). Downing, Louise. Carnegie Connects First Wave Power Machine to Grid in Australia . 19 February 2015. Retrieved November 24, 2026, from https://en.wikipedia.org/w/index.php?oldid=1374102362

  11. CWE Manufactures and Delivers CETO 4 to Reunion Island (France) . · retrieved 2026-09-08 · rev 1374102362
    Cite this reference

    MLA "CWE Manufactures and Delivers CETO 4 to Reunion Island (France) ." 2026-09-08. https://en.wikipedia.org/w/index.php?oldid=1374102362. Accessed 24 November 2026.

    Chicago "CWE Manufactures and Delivers CETO 4 to Reunion Island (France) ." 2026-09-08. https://en.wikipedia.org/w/index.php?oldid=1374102362.

    APA encyclopegia.org. (2026). CWE Manufactures and Delivers CETO 4 to Reunion Island (France) . Retrieved November 24, 2026, from https://en.wikipedia.org/w/index.php?oldid=1374102362

  12. Carnegie Wave Energy . · retrieved 2026-09-08 · rev 1374102362
    Cite this reference

    MLA "Carnegie Wave Energy ." 2026-09-08. https://en.wikipedia.org/w/index.php?oldid=1374102362. Accessed 24 November 2026.

    Chicago "Carnegie Wave Energy ." 2026-09-08. https://en.wikipedia.org/w/index.php?oldid=1374102362.

    APA encyclopegia.org. (2026). Carnegie Wave Energy . Retrieved November 24, 2026, from https://en.wikipedia.org/w/index.php?oldid=1374102362

  13. Réunion Island CETO Power Project . ecogeneration . April 2011. · retrieved 2026-09-08 · rev 1374102362
    Cite this reference

    MLA "Réunion Island CETO Power Project . ecogeneration . April 2011." Réunion Island CETO Power Project. 2026-09-08. https://en.wikipedia.org/w/index.php?oldid=1374102362. Accessed 24 November 2026.

    Chicago "Réunion Island CETO Power Project . ecogeneration . April 2011." Réunion Island CETO Power Project. 2026-09-08. https://en.wikipedia.org/w/index.php?oldid=1374102362.

    APA Réunion Island CETO Power Project. (2026). Réunion Island CETO Power Project . ecogeneration . April 2011. Retrieved November 24, 2026, from https://en.wikipedia.org/w/index.php?oldid=1374102362

  14. Wave Energy for La Réunion . · retrieved 2026-09-08 · rev 1374102362
    Cite this reference

    MLA "Wave Energy for La Réunion ." 2026-09-08. https://en.wikipedia.org/w/index.php?oldid=1374102362. Accessed 24 November 2026.

    Chicago "Wave Energy for La Réunion ." 2026-09-08. https://en.wikipedia.org/w/index.php?oldid=1374102362.

    APA encyclopegia.org. (2026). Wave Energy for La Réunion . Retrieved November 24, 2026, from https://en.wikipedia.org/w/index.php?oldid=1374102362

  15. CETO 4 Unit Awaits Deployment on Reunion Island in Indian Ocean . · retrieved 2026-09-08 · rev 1374102362
    Cite this reference

    MLA "CETO 4 Unit Awaits Deployment on Reunion Island in Indian Ocean ." 2026-09-08. https://en.wikipedia.org/w/index.php?oldid=1374102362. Accessed 24 November 2026.

    Chicago "CETO 4 Unit Awaits Deployment on Reunion Island in Indian Ocean ." 2026-09-08. https://en.wikipedia.org/w/index.php?oldid=1374102362.

    APA encyclopegia.org. (2026). CETO 4 Unit Awaits Deployment on Reunion Island in Indian Ocean . Retrieved November 24, 2026, from https://en.wikipedia.org/w/index.php?oldid=1374102362

  16. Parkinson. CETO wave energy machine swept away in cyclone, report says . · retrieved 2026-09-08 · rev 1374102362
    Cite this reference

    MLA "Parkinson. CETO wave energy machine swept away in cyclone, report says ." Parkinson. 2026-09-08. https://en.wikipedia.org/w/index.php?oldid=1374102362. Accessed 24 November 2026.

    Chicago "Parkinson. CETO wave energy machine swept away in cyclone, report says ." Parkinson. 2026-09-08. https://en.wikipedia.org/w/index.php?oldid=1374102362.

    APA Parkinson. (2026). Parkinson. CETO wave energy machine swept away in cyclone, report says . Retrieved November 24, 2026, from https://en.wikipedia.org/w/index.php?oldid=1374102362

  17. Completed in 2011, the project identified two potential near-shore sites in County Clare. CWE Ireland applied for a Foreshore Licence to develop a project between Freagh Point and Spanish Point. = . · retrieved 2026-09-08 · rev 1374102362
    Cite this reference

    MLA "Completed in 2011, the project identified two potential near-shore sites in County Clare. CWE Ireland applied for a Foreshore Licence to develop a project between Freagh Point and Spanish Point. = ." Completed in 2011, the project identified two potential near-shore sites in County Clare. 2026-09-08. https://en.wikipedia.org/w/index.php?oldid=1374102362. Accessed 24 November 2026.

    Chicago "Completed in 2011, the project identified two potential near-shore sites in County Clare. CWE Ireland applied for a Foreshore Licence to develop a project between Freagh Point and Spanish Point. = ." Completed in 2011, the project identified two potential near-shore sites in County Clare. 2026-09-08. https://en.wikipedia.org/w/index.php?oldid=1374102362.

    APA Completed in 2011, the project identified two potential near-shore sites in County Clare. (2026). Completed in 2011, the project identified two potential near-shore sites in County Clare. CWE Ireland applied for a Foreshore Licence to develop a project between Freagh Point and Spanish Point. = . Retrieved November 24, 2026, from https://en.wikipedia.org/w/index.php?oldid=1374102362

  18. EuropeWave unveils top 3 wave energy finalists . · retrieved 2026-09-08 · rev 1374102362
    Cite this reference

    MLA "EuropeWave unveils top 3 wave energy finalists ." 2026-09-08. https://en.wikipedia.org/w/index.php?oldid=1374102362. Accessed 24 November 2026.

    Chicago "EuropeWave unveils top 3 wave energy finalists ." 2026-09-08. https://en.wikipedia.org/w/index.php?oldid=1374102362.

    APA encyclopegia.org. (2026). EuropeWave unveils top 3 wave energy finalists . Retrieved November 24, 2026, from https://en.wikipedia.org/w/index.php?oldid=1374102362

  19. Carnegie reserves site for CETO wave energy device deployment in Spain . · retrieved 2026-09-08 · rev 1374102362
    Cite this reference

    MLA "Carnegie reserves site for CETO wave energy device deployment in Spain ." 2026-09-08. https://en.wikipedia.org/w/index.php?oldid=1374102362. Accessed 24 November 2026.

    Chicago "Carnegie reserves site for CETO wave energy device deployment in Spain ." 2026-09-08. https://en.wikipedia.org/w/index.php?oldid=1374102362.

    APA encyclopegia.org. (2026). Carnegie reserves site for CETO wave energy device deployment in Spain . Retrieved November 24, 2026, from https://en.wikipedia.org/w/index.php?oldid=1374102362

  20. Carnegie's wave energy converter step closer to deployment at BiMEP . · retrieved 2026-09-08 · rev 1374102362
    Cite this reference

    MLA "Carnegie's wave energy converter step closer to deployment at BiMEP ." 2026-09-08. https://en.wikipedia.org/w/index.php?oldid=1374102362. Accessed 24 November 2026.

    Chicago "Carnegie's wave energy converter step closer to deployment at BiMEP ." 2026-09-08. https://en.wikipedia.org/w/index.php?oldid=1374102362.

    APA encyclopegia.org. (2026). Carnegie's wave energy converter step closer to deployment at BiMEP . Retrieved November 24, 2026, from https://en.wikipedia.org/w/index.php?oldid=1374102362

  21. Spain backs Carnegie with €1.2M for CETO wave energy device deployment . · retrieved 2026-09-08 · rev 1374102362
    Cite this reference

    MLA "Spain backs Carnegie with €1.2M for CETO wave energy device deployment ." Spain backs Carnegie with €1. 2026-09-08. https://en.wikipedia.org/w/index.php?oldid=1374102362. Accessed 24 November 2026.

    Chicago "Spain backs Carnegie with €1.2M for CETO wave energy device deployment ." Spain backs Carnegie with €1. 2026-09-08. https://en.wikipedia.org/w/index.php?oldid=1374102362.

    APA Spain backs Carnegie with €1. (2026). Spain backs Carnegie with €1.2M for CETO wave energy device deployment . Retrieved November 24, 2026, from https://en.wikipedia.org/w/index.php?oldid=1374102362

  22. In March 2025, it was announced Carnegie had received a milestone payment of over €300k as part of the ACHIVE project, with the remainder to be paid upon completing further activities within the proje . · retrieved 2026-09-08 · rev 1374102362
    Cite this reference

    MLA "In March 2025, it was announced Carnegie had received a milestone payment of over €300k as part of the ACHIVE project, with the remainder to be paid upon completing further activities within the proje ." In March 2025, it was announced Carnegie had received a milestone payment of over €300k as part of the ACHIVE project, w. 2026-09-08. https://en.wikipedia.org/w/index.php?oldid=1374102362. Accessed 24 November 2026.

    Chicago "In March 2025, it was announced Carnegie had received a milestone payment of over €300k as part of the ACHIVE project, with the remainder to be paid upon completing further activities within the proje ." In March 2025, it was announced Carnegie had received a milestone payment of over €300k as part of the ACHIVE project, w. 2026-09-08. https://en.wikipedia.org/w/index.php?oldid=1374102362.

    APA In March 2025, it was announced Carnegie had received a milestone payment of over €300k as part of the ACHIVE project, w. (2026). In March 2025, it was announced Carnegie had received a milestone payment of over €300k as part of the ACHIVE project, with the remainder to be paid upon completing further activities within the proje . Retrieved November 24, 2026, from https://en.wikipedia.org/w/index.php?oldid=1374102362

  23. Desalination, 2010. Available from [10 May 2011] . · retrieved 2026-09-08 · rev 1374102362
    Cite this reference

    MLA "Desalination, 2010. Available from [10 May 2011] ." Desalination, 2010. 2026-09-08. https://en.wikipedia.org/w/index.php?oldid=1374102362. Accessed 24 November 2026.

    Chicago "Desalination, 2010. Available from [10 May 2011] ." Desalination, 2010. 2026-09-08. https://en.wikipedia.org/w/index.php?oldid=1374102362.

    APA Desalination, 2010. (2026). Desalination, 2010. Available from [10 May 2011] . Retrieved November 24, 2026, from https://en.wikipedia.org/w/index.php?oldid=1374102362

  24. CETO 6 Garden Island Project Western Australia . October. · retrieved 2026-09-08 · rev 1374102362
    Cite this reference

    MLA "CETO 6 Garden Island Project Western Australia . October." CETO 6 Garden Island Project Western Australia. 2026-09-08. https://en.wikipedia.org/w/index.php?oldid=1374102362. Accessed 24 November 2026.

    Chicago "CETO 6 Garden Island Project Western Australia . October." CETO 6 Garden Island Project Western Australia. 2026-09-08. https://en.wikipedia.org/w/index.php?oldid=1374102362.

    APA CETO 6 Garden Island Project Western Australia. (2026). CETO 6 Garden Island Project Western Australia . October. Retrieved November 24, 2026, from https://en.wikipedia.org/w/index.php?oldid=1374102362

  25. Unravelling what went wrong with Carnegie . · retrieved 2026-09-08 · rev 1374102362
    Cite this reference

    MLA "Unravelling what went wrong with Carnegie ." 2026-09-08. https://en.wikipedia.org/w/index.php?oldid=1374102362. Accessed 24 November 2026.

    Chicago "Unravelling what went wrong with Carnegie ." 2026-09-08. https://en.wikipedia.org/w/index.php?oldid=1374102362.

    APA encyclopegia.org. (2026). Unravelling what went wrong with Carnegie . Retrieved November 24, 2026, from https://en.wikipedia.org/w/index.php?oldid=1374102362

  26. CETO · retrieved 2026-09-08 · rev 1374102362
    Cite this reference

    MLA "CETO." Technical Appraisal of the "CETO" Wave Power Generation Devices. 2026-09-08. https://en.wikipedia.org/w/index.php?oldid=1374102362. Accessed 24 November 2026.

    Chicago "CETO." Technical Appraisal of the "CETO" Wave Power Generation Devices. 2026-09-08. https://en.wikipedia.org/w/index.php?oldid=1374102362.

    APA Technical Appraisal of the "CETO" Wave Power Generation Devices. (2026). CETO. Retrieved November 24, 2026, from https://en.wikipedia.org/w/index.php?oldid=1374102362

  27. Annual Report 2010 . Implementing Agreement on Ocean Energy Systems . 2011. · retrieved 2026-09-08 · rev 1374102362
    Cite this reference

    MLA "Annual Report 2010 . Implementing Agreement on Ocean Energy Systems . 2011." Annual Report 2010. 2026-09-08. https://en.wikipedia.org/w/index.php?oldid=1374102362. Accessed 24 November 2026.

    Chicago "Annual Report 2010 . Implementing Agreement on Ocean Energy Systems . 2011." Annual Report 2010. 2026-09-08. https://en.wikipedia.org/w/index.php?oldid=1374102362.

    APA Annual Report 2010. (2026). Annual Report 2010 . Implementing Agreement on Ocean Energy Systems . 2011. Retrieved November 24, 2026, from https://en.wikipedia.org/w/index.php?oldid=1374102362

  28. CETO 3 Passes Trial Tests . · retrieved 2026-09-08 · rev 1374102362
    Cite this reference

    MLA "CETO 3 Passes Trial Tests ." 2026-09-08. https://en.wikipedia.org/w/index.php?oldid=1374102362. Accessed 24 November 2026.

    Chicago "CETO 3 Passes Trial Tests ." 2026-09-08. https://en.wikipedia.org/w/index.php?oldid=1374102362.

    APA encyclopegia.org. (2026). CETO 3 Passes Trial Tests . Retrieved November 24, 2026, from https://en.wikipedia.org/w/index.php?oldid=1374102362

  29. Progress toward the Worldwide Deployment of the CETO® Wave Energy Technology . · retrieved 2026-09-08 · rev 1374102362
    Cite this reference

    MLA "Progress toward the Worldwide Deployment of the CETO® Wave Energy Technology ." 2026-09-08. https://en.wikipedia.org/w/index.php?oldid=1374102362. Accessed 24 November 2026.

    Chicago "Progress toward the Worldwide Deployment of the CETO® Wave Energy Technology ." 2026-09-08. https://en.wikipedia.org/w/index.php?oldid=1374102362.

    APA encyclopegia.org. (2026). Progress toward the Worldwide Deployment of the CETO® Wave Energy Technology . Retrieved November 24, 2026, from https://en.wikipedia.org/w/index.php?oldid=1374102362

Cite this article

MLA

"CETO." encyclopegia.org, 2026, https://encyclopegia.org/wiki/ceto. Accessed 24 November 2026.

Chicago

"CETO." encyclopegia.org. Accessed November 24, 2026. https://encyclopegia.org/wiki/ceto.

APA

encyclopegia.org. (2026). CETO. Retrieved November 24, 2026, from https://encyclopegia.org/wiki/ceto

Accessed November 24, 2026 · CC BY-SA 4.0 · citation page · JSON

Related articles

Neoelmis ceto

stub · references available

Austrolimnius ceto

stub · references available

Ceto cuvieria

stub · references available

Ceto, Lombardy

enwiki · references available

Ceto (disambiguation)

enwiki · references available

Ceto (mythology)

enwiki · references available

Ceto Temple

enwiki · references available

65489 Ceto

enwiki · references available
CC BY-SA 4.0 · share-alike · https://en.wikipedia.org/w/index.php?oldid=1374102362 · 0.5 · snapshot enwiki-001352073664

Cite · JSON · Search

Related services and records

Services

  • Estate — measured countries, lanes and facts
  • Intel — live corroborated events
  • Legal — statutes, cases and citations
  • Encyclopedia — articles with inline sources
  • Space — launches, satellites and orbits
  • Search — federated search and reports
  • Pass — passport account and SSO
  • Corpora — read-only corpus origins
  • e01 — self-hosted corpora and tools

Text and metadata only; each target carries its own sources. Missing data is published as no-data, never estimated.