encyclopegia.org

Collin County Outer Loop

The Collin County Outer Loop is a partially-built beltway in Collin County, Texas.[src] When completed, the highway would travel from the Denton County line to the Rockwall County line, passing through cities in the northern and eastern parts of the county.[src] The Loop is part of the DFW Regional Outer Loop project, which would encircle the Dallas–Fort Worth metroplex.[src] , of the highway's frontage roads have been constructed.[src] The constructed portion, consisting of Segment 1 and parts of Segment 3, runs from Dallas Parkway in Celina to Sam Rayburn Highway (SH 121) near Melissa.[src] Segments 2, 4, and 5, as well as the rest of Segment 3, are in planning phases.[src] The highway was initially proposed as a toll road, with Collin County establishing the Collin County Toll Road Authority to manage the project.[src] However, in March 2019 the county's Commissioners Court opted to make the road a freeway.[src]

The Collin County Outer Loop is a partially-built beltway in Collin County, Texas.[src] When completed, the highway would travel from the Denton County line to the Rockwall County line, passing through cities in the northern and eastern parts of the county.[src] The Loop is part of the DFW Regional Outer Loop project, which would encircle the Dallas–Fort Worth metroplex.[src] , of the highway's frontage roads have been constructed.[src] The constructed portion, consisting of Segment 1 and parts of Segment 3, runs from Dallas Parkway in Celina to Sam Rayburn Highway (SH 121) near Melissa.[src] Segments 2, 4, and 5, as well as the rest of Segment 3, are in planning phases.[src] The highway was initially proposed as a toll road, with Collin County establishing the Collin County Toll Road Authority to manage the project.[src] However, in March 2019 the county's Commissioners Court opted to make the road a freeway.[src] ==Segments== For planning and construction purposes, the loop is divided into five segments.[src] Construction of each segment will be performed in three phases: one frontage road, the second frontage road, and finally the highway's main lanes.[src] , only the first phase of Segment 1 and parts of Segment 3 have been constructed.[src] ===Segment 1=== Segment 1 runs east-west from US 75 in Anna to Sam Rayburn Highway (SH 121) northeast of Melissa.[src] The segment's northern frontage road was built at a cost of $21 million and opened to traffic in 2012.[src] ===Segment 2=== Segment 2 will run north-south from FM 6 between Nevada and Josephine to the Rockwall County line near Royse City.[src] This segment could possibly be extended further south past Interstate 30 through Rockwall, Kaufman and Dallas counties as part of a larger outer loop.[src] The segment is currently being re-studied, with plans to release an environmental impact assessment in fall 2026.[src] ===Segment 3=== Segment 3 will run approximately east-west from the Denton County line in Celina to US 75 in Anna.[src] This section could be extended further west through Denton County as part of a larger outer loop.[src] , of the segment have been completed, spanning from Dallas Parkway (a future extension of Dallas North Tollway) to US 75.[src] Construction on the segment began in 2019, starting with the portion between Dallas Parkway and Preston Road (SH 289).[src] This was extended to Custer Road (FM 2478) in October 2022, with a further extension to US 75 completed in November 2025, ahead of schedule.[src] The remaining segment, dubbed Segment 3A, is scheduled for construction in 2026.[src] ===Segment 4=== Segment 4 will run north-south from US 380 near Farmersville to FM 6 between Nevada and Josephine.[src] The segment is currently being re-studied, with plans to release an environmental impact assessment in fall 2026.[src] ===Segment 5=== Segment 5 will run through northeastern Collin County from Sam Rayburn Highway (SH 121) near Melissa to US 380 near Farmersville, connecting Segments 1 and 4.[src] The county is currently determining an appropriate right of way for the segment.[src] ==Junction list== ==See also== Texas State Highway Loop 9 ==References== ==External links== Collin County Engineering: Outer Loop[src]

35 sentences · 35 cited inline · 0 references stored

References

No reference rows published for this article.

Cite this article

MLA

"Collin County Outer Loop." encyclopegia.org, 2026, https://encyclopegia.org/wiki/collin-county-outer-loop. Accessed 29 November 2026.

Chicago

"Collin County Outer Loop." encyclopegia.org. Accessed November 29, 2026. https://encyclopegia.org/wiki/collin-county-outer-loop.

APA

encyclopegia.org. (2026). Collin County Outer Loop. Retrieved November 29, 2026, from https://encyclopegia.org/wiki/collin-county-outer-loop

Accessed November 29, 2026 · CC BY-SA 4.0 · citation page · JSON

Related articles

County Durham

stub · references available

Caldwell County

stub · references available

Gonzales County

stub · references available

Liberty County

stub · references available

Weber County

stub · references available

Sabine County

stub · references available

Rich County

stub · references available

Lee County

stub · references available
CC BY-SA 4.0 · share-alike · https://en.wikipedia.org/w/index.php?oldid=1373566999 · 0.5 · snapshot enwiki-001373566999

Cite · JSON · Search

Related services and records

Services

  • Estate — measured countries, lanes and facts
  • Intel — live corroborated events
  • Legal — statutes, cases and citations
  • Encyclopedia — articles with inline sources
  • Space — launches, satellites and orbits
  • Search — federated search and reports
  • Pass — passport account and SSO
  • Corpora — read-only corpus origins
  • e01 — self-hosted corpora and tools
  • Careers — open roles: frontier engineers and sales partners
  • Index — every corpus, paper and record
  • Estate guide — what a public data estate is
  • Founder — Lois-Kleinner Alpasan
  • Records — DOIs and external deposits
  • Documents — one-pagers, PDFs and QR codes
  • Brand kit — logos and share images
  • Papers — plain-language briefs with citations
  • Browser — search engine, PWA and bookmarklet
  • Anticloud — the operator and its projects

As seen in Business Insider · 336 outlets · evidence DOIs · plain-language papers

Text and metadata only; each target carries its own sources. Missing data is published as no-data, never estimated.