encyclopegia.org

Critical path

Critical path may refer to: *The longest series of sequential operations in a parallel computation; see analysis of parallel algorithms *Critical path method, an algorithm for scheduling a set of project activities *Critical Path (book), by Buckminster Fuller *The Critical Path: An Essay on the Social Context of Literary Criticism, a 1971 book by Northrop Frye *The Critical Path, a podcast by Horace Dediu *Critical Path (video game), an interactive movie computer game *Critical Path, Inc., a provider of messaging services *Critical Path Institute, an organization for improvement of the drug development process *Critical Path Project, a video archive *Critical Path Project, early source of HIV/AIDS information founded by Kiyoshi Kuromiya *"The Critical Path" (Murder City), a 2004 television episode[src]

Critical path may refer to: The longest series of sequential operations in a parallel computation; see analysis of parallel algorithms Critical path method, an algorithm for scheduling a set of project activities Critical Path (book), by Buckminster Fuller The Critical Path: An Essay on the Social Context of Literary Criticism, a 1971 book by Northrop Frye The Critical Path, a podcast by Horace Dediu Critical Path (video game), an interactive movie computer game Critical Path, Inc., a provider of messaging services Critical Path Institute, an organization for improvement of the drug development process Critical Path Project, a video archive Critical Path Project, early source of HIV/AIDS information founded by Kiyoshi Kuromiya "The Critical Path" (Murder City), a 2004 television episode ==See also==[src]

2 sentences · 2 cited inline · 0 references stored

References

No reference rows published for this article.

Cite this article

MLA

"Critical path." encyclopegia.org, 2026, https://encyclopegia.org/wiki/critical-path. Accessed 26 November 2026.

Chicago

"Critical path." encyclopegia.org. Accessed November 26, 2026. https://encyclopegia.org/wiki/critical-path.

APA

encyclopegia.org. (2026). Critical path. Retrieved November 26, 2026, from https://encyclopegia.org/wiki/critical-path

Accessed November 26, 2026 · CC BY-SA 4.0 · citation page · JSON

Claims

PredicateValueSource
date of foundation2004Wikipedia

Related articles

Open Shortest Path First

stub · references available

On the Path

stub · references available

free-space path loss

stub · references available

path integral

stub · references available

Path of Destruction

stub · references available

shortest path problem

stub · references available

critical legal studies

stub · references available
CC BY-SA 4.0 · share-alike · https://en.wikipedia.org/w/index.php?oldid=1337861039 · 0.5 · snapshot enwiki-001337861039

Cite · JSON · Search

Related services and records

Services

  • Estate — measured countries, lanes and facts
  • Intel — live corroborated events
  • Legal — statutes, cases and citations
  • Encyclopedia — articles with inline sources
  • Space — launches, satellites and orbits
  • Search — federated search and reports
  • Pass — passport account and SSO
  • Corpora — read-only corpus origins
  • e01 — self-hosted corpora and tools

Text and metadata only; each target carries its own sources. Missing data is published as no-data, never estimated.