Cuenca Tramway
The Cuenca Tramway ( ) is a tram line in the Ecuadorian city of Cuenca.[src]
The Cuenca Tramway ( ) is a tram line in the Ecuadorian city of Cuenca.[src] ==Background== Construction began in November 2013, with the city of Cuenca signing a US$142.6m contract with the CITA Cuenca consortium, which is led by Alstom and includes CIM, Ineo, and TSO, the same year.[src] Testing of the tramway's Alstom Citadis rolling stock on the southernmost part of the line began in 2015, and test runs over the full route began in July 2018.[src] In September 2018 an agreement with Metro Tenerife was signed by Cuenca municipality to operate the tramway.[src] ==Route== The 10.7 km route begins at Parque Industrial and ends at Rio Tarqui, passing through the historic center, and as of 2018 was forecast to carry 120,000 daily passengers.[src] ==See also== Quito Metro Empresa de Ferrocarriles Ecuatorianos ==References== ==External links==[src]
7 sentences · 7 cited inline · 0 references stored
References
No reference rows published for this article.
Cite this article
MLA
"Cuenca Tramway." encyclopegia.org, 2025, https://encyclopegia.org/wiki/cuenca-tramway. Accessed 27 November 2026.
Chicago
"Cuenca Tramway." encyclopegia.org. Accessed November 27, 2026. https://encyclopegia.org/wiki/cuenca-tramway.
APA
encyclopegia.org. (2025). Cuenca Tramway. Retrieved November 27, 2026, from https://encyclopegia.org/wiki/cuenca-tramway
Accessed November 27, 2026 · CC BY-SA 4.0 · citation page · JSON