Earned schedule
Earned schedule (ES) is an extension to the theory and practice of earned value management (EVM).[src] It has been stated that Earned Schedule provides a useful link between traditional Earned Value Analysis and traditional project schedule analysis -- a link that some say has been missing in traditional EVM theory.[src]
Earned schedule (ES) is an extension to the theory and practice of earned value management (EVM).[src] It has been stated that Earned Schedule provides a useful link between traditional Earned Value Analysis and traditional project schedule analysis -- a link that some say has been missing in traditional EVM theory.[src] Traditionally, EVM tracks schedule variances not in units of time, but in units of currency (e.g.[src] dollars) or quantity (e.g.[src] labor hours).[src] Of course, it is more natural to speak of schedule performance in units of time, but the problems with traditional schedule performance metrics are even deeper.[src] Near the end of a project -- when schedule performance is often a primary concern -- the usefulness of traditional schedule metrics is demonstrably poor.[src] When a project is completed, its SV is always 0 and SPI is always 1, even if the project was delivered unacceptably late.[src] Similarly, a project can languish near completion (e.g.[src] SPI = 0.95) and never be flagged as outside acceptable numerical tolerance.[src] (Using traditional SV as an exception threshold, it is not uncommon that an SPI > 0.9 is considered acceptable.) To correct these problems, Earned Schedule theory represents the two measures SV and SPI in 2 separate domains: currency and time.[src] They are named as SV($) and SPI($), to indicate they relate to currency; and SV(t) and SPI(t), to indicate they relate to time.[src] A stated advantage of Earned Schedule methods is that no new data collection processes are required to implement and test Earned Schedule; it only requires updated formulas.[src] Earned Schedule theory also provides updated formulas for predicting project completion date, using the time-based measures.[src] ==Notes and references== ==External links== Earned Schedule Web Site PMI Sydney Chapter Web Site[src]
17 sentences · 17 cited inline · 0 references stored
References
No reference rows published for this article.
Cite this article
MLA
"Earned schedule." encyclopegia.org, 2023, https://encyclopegia.org/wiki/earned-schedule. Accessed 26 November 2026.
Chicago
"Earned schedule." encyclopegia.org. Accessed November 26, 2026. https://encyclopegia.org/wiki/earned-schedule.
APA
encyclopegia.org. (2023). Earned schedule. Retrieved November 26, 2026, from https://encyclopegia.org/wiki/earned-schedule
Accessed November 26, 2026 · CC BY-SA 4.0 · citation page · JSON