Hakuchō (train)
The and were Japanese limited express train services which operated between and via the undersea Seikan Tunnel from December 2002 until March 2016.[src] The services were operated by East Japan Railway Company (JR East) and Hokkaido Railway Company (JR Hokkaido) respectively.[src]
The and were Japanese limited express train services which operated between and via the undersea Seikan Tunnel from December 2002 until March 2016.[src] The services were operated by East Japan Railway Company (JR East) and Hokkaido Railway Company (JR Hokkaido) respectively.[src] ==Hakuchō== The Hakuchō services operated between and using refurbished JR East 485-3000 series six-car EMUs, extended to eight cars during busy seasons.[src] Services operated at a maximum speed of on the ATC-controlled section of the Seikan Tunnel, with the fastest services between Shin-Aomori and Hakodate taking 2 hours 8 minutes.[src] The Hakuchō name actually dated back to 1960, as the name of a service which ran from Osaka to Aomori until March 2001.[src] The name was reused for the new services starting in 2002 by popular demand.[src] ==Super Hakuchō== The Super Hakuchō services operated between and using JR Hokkaido 789 series six- and eight-car EMUs and a converted 785-300 series 2-car EMU set.[src] As with the Hakuchō services, these trains operated at a maximum speed of on the ATC-controlled section of the Seikan Tunnel, with the fastest services between Shin-Aomori and Hakodate taking 2 hours 1 minute.[src] File:JRH-789 HE-105.jpg|A JR Hokkaido 789 series EMU on a Super Hakuchō service in August 2010 File:JRhokkaido Kuha784 303.jpg|A converted 785-300 series EMU on a Super Hakuchō service in August 2011 ==History== ===Semi express=== The Hakuchō service was first introduced from 28 December 1960, as a semi express service operating between and via .[src] ===Limited express=== From 1 October 1961, the train was upgraded to become a limited express service operating between and and via using KiHa 80 series diesel multiple units.[src] From 1965, the Ueno services were separated to become the Hakutaka, and the Hakuchō was amended via Niigata.[src] 485 series electric multiple units were used from October 1972.[src] From 1988, the rolling stock was refurbished and repainted in a new livery of cream with light blue and dark blue waistline stripes.[src] Hakuchō services between Osaka and Aomori ran until 2 March 2001.[src] ===Kaikyo Line limited express=== From 1 December 2002, the "Hakuchō" name was revived for services between and Hakodate, coinciding with the opening of the Tohoku Shinkansen extension from to , replacing the earlier locomotive-hauled Kaikyō rapid services which operated between Morioka and Hakodate.[src] From the start of the revised timetable on 4 December 2010, with the opening of the Tohoku Shinkansen from Hachinohe to , the Hakuchō and Super Hakuchō trains were also shortened to run from Shin-Aomori to Hakodate via Aomori.[src] ===Withdrawal=== The Hakucho and Super Hakucho services were discontinued in March 2016 ahead of the opening of the Hokkaido Shinkansen high-speed line.[src] The last services operated on 21 March 2016.[src] ==See also== List of named passenger trains of Japan ==References== ==External links== JR East 485 series Hakuchō[src]
21 sentences · 21 cited inline · 0 references stored
References
No reference rows published for this article.
Cite this article
MLA
"Hakuchō (train)." encyclopegia.org, 2025, https://encyclopegia.org/wiki/hakuch-train. Accessed 29 November 2026.
Chicago
"Hakuchō (train)." encyclopegia.org. Accessed November 29, 2026. https://encyclopegia.org/wiki/hakuch-train.
APA
encyclopegia.org. (2025). Hakuchō (train). Retrieved November 29, 2026, from https://encyclopegia.org/wiki/hakuch-train
Accessed November 29, 2026 · CC BY-SA 4.0 · citation page · JSON