Heavy Electrical Complex
Heavy Electrical Complex (HEC) is a power transformer manufacturing facility located in Hattar Industrial Estate, Haripur, Pakistan.[src] The facility has an annual production capacity of 3,000 MVA.[src]
Heavy Electrical Complex (HEC) is a power transformer manufacturing facility located in Hattar Industrial Estate, Haripur, Pakistan.[src] The facility has an annual production capacity of 3,000 MVA.[src] ==History== ===Privatisation=== In late 2023, the privatization of HEC was completed with the handing over of share certificates to the buyer, IMS Engineering.[src] The buyer paid Rs 1.4 billion for a 96.6 percent stake in HEC and also assumed additional liabilities of Rs 752 million to Bank of Khyber.[src] ===Land transfer=== The government handed over the vacant HEC land to the Strategic Plans Division (SPD).[src] The Ministry of Industries and Production had asked the Economic Coordination Committee (ECC) to review its earlier decision to transfer HEC land to SPD and authorize it to proceed in this regard.[src] ==See also== Heavy Mechanical Complex ==References==[src]
9 sentences · 9 cited inline · 0 references stored
References
No reference rows published for this article.
Cite this article
MLA
"Heavy Electrical Complex." encyclopegia.org, 2026, https://encyclopegia.org/wiki/heavy-electrical-complex. Accessed 28 November 2026.
Chicago
"Heavy Electrical Complex." encyclopegia.org. Accessed November 28, 2026. https://encyclopegia.org/wiki/heavy-electrical-complex.
APA
encyclopegia.org. (2026). Heavy Electrical Complex. Retrieved November 28, 2026, from https://encyclopegia.org/wiki/heavy-electrical-complex
Accessed November 28, 2026 · CC BY-SA 4.0 · citation page · JSON