Interstate 494
Interstate 494 (I-494) is an auxiliary Interstate Highway making up part of a beltway of I-94, circling through the southern and western portions of the Minneapolis–Saint Paul metropolitan area in Minnesota.[src] The road is coupled with I-694 (which circles the northern edge of the Twin Cities metro area) at each end and composes more than half of the major beltway of the region.[src] I-694/I-494 also act as loop routes for I-35E and I-35W.[src] The speed limit on I-494 is .[src] Interstate Highways outside of the loop in Minnesota may be signed as high as .[src] Most highways inside the loop are signed at speeds of or lower, though a few exceptions were added in September 2005, allowing speeds of up to in some places.[src] Those roads had been signed at or higher up until the 1973 oil crisis.[src]
Interstate 494 (I-494) is an auxiliary Interstate Highway making up part of a beltway of I-94, circling through the southern and western portions of the Minneapolis–Saint Paul metropolitan area in Minnesota.[src] The road is coupled with I-694 (which circles the northern edge of the Twin Cities metro area) at each end and composes more than half of the major beltway of the region.[src] I-694/I-494 also act as loop routes for I-35E and I-35W.[src] The speed limit on I-494 is .[src] Interstate Highways outside of the loop in Minnesota may be signed as high as .[src] Most highways inside the loop are signed at speeds of or lower, though a few exceptions were added in September 2005, allowing speeds of up to in some places.[src] Those roads had been signed at or higher up until the 1973 oil crisis.[src] ==Route description== The exit numbering of I-494 is unusual in that it begins at the Minnesota River heading westbound (between Eagan and Bloomington) and continues clockwise around the entire beltway, continuing clockwise onto I-694.[src] The last exit east of the Minnesota River is exit 71 to Pilot Knob Road.[src] The first exit west of the river is exit 1A, which grants access to eastbound State Highway 5 (MN 5) and Minneapolis–Saint Paul International Airport.[src] The most significant landmark on the length of I-494 is Mall of America, just south of the intersection of I-494 and MN 77.[src] Legally, the route of I-494 is defined as part of unmarked legislative route 393 in Minnesota Statutes § 161.12(5).[src] I-494 is not marked with this legislative number along the actual highway.[src] ==History== Construction on I-494 first began in the late 1950s, and it was finally completed in 1985.[src] With the most recent expansion completed in November 2016 in Plymouth, I-494 is now at least three lanes in each direction for its entire route.[src] A major reconstruction/widening project of I-494 was completed in late 2006 between US Highway 212/State Highway 5 (US 212/MN 5) in Eden Prairie and Carlson Parkway at Minnetonka–Plymouth.[src] There were plans for up to six lanes in each direction for parts of I-494 in Bloomington, but the majority of the city only sees four lanes and sees five in only two spots: eastbound at the East Bush Lake Road exit and further eastbound at the point where I-494 and MN 5 separate from each other.[src] Expansion of the Wakota Bridge between Newport and South St.[src] Paul over the Mississippi River was completed in mid-2010.[src] The bridge is named so because it connects Washington and Dakota counties.[src] Near the end of this effort, I-494 was widened from two to three lanes in each direction between Lake Road and I-94 in Woodbury.[src] ===Traffic=== Since its opening, I-494 has been subjected to numerous traffic problems, both eastbound and westbound.[src] Vehicles eastbound usually start to slow down at the US 169 interchange in Bloomington and continues to slow at the interchange with MN 100, at the Bloomington–Edina city line.[src] However, traffic is the worst at the interchange for I-35W, which is located at the Bloomington–Richfield city line.[src] Currently, information about the study is on the City of Bloomington's website, with more information starting to come from the Minnesota Department of Transportation (MnDOT).[src] The plan is scoped between US 169 to the Minneapolis–Saint Paul International Airport.[src] The road sees over 500,000 passengers per day, with it being congested for more than 30 percent of the day.[src] So far, MnDOT has determined to add E-ZPass Minnesota lanes eastbound from France Avenue to MN 77 and westbound from MN 77 to I-35W.[src] They also plan to construct a turbine-style ramp for northbound I-35W from westbound I-494.[src] In an effort to reduce congestion on the highway and on exits as well, MnDOT is planning to close all ramps at Nicollet Avenue and 12th Avenue and construct a full-access interchange at County State-Aid Highway 35 (CSAH 35; Portland Avenue), with two onramps and two offramps to replace the ramps.[src] Problems have been addressed throughout the entire corridor, with all the highways being included.[src] Construction for the Metro Orange Line tunnel began in 2019 and was completed in 2021.[src] The remainder of the corridor's construction began in 2023, and most of the corridor is still under construction today.[src] ==494 Corridor Commission== The 494 Corridor Commission, also known as 494 Commuter Services, is a nonprofit organization aimed at reducing traffic congestion along the southwest section of the I-494 corridor.[src] In 1988, the cities of Bloomington, Eden Prairie, Edina, Minnetonka, and Richfield joined to address traffic congestion and work toward improving I-494.[src] The organization's mission is to promote economic growth and regional prosperity through improved transportation options along the highway, such as carpooling and bus transit.[src] The organization's board of directors consists of representatives from each of the five member cities, MnDOT, the Metropolitan Council, and the private business community.[src] ==Exit list== ==References== ==External links== MnDOT: MnDOT I-494 Reconstruction Project - from I-394 to Minnesota River[src]
45 sentences · 45 cited inline · 0 references stored
References
No reference rows published for this article.
Cite this article
MLA
"Interstate 494." encyclopegia.org, 2026, https://encyclopegia.org/wiki/interstate-494. Accessed 25 November 2026.
Chicago
"Interstate 494." encyclopegia.org. Accessed November 25, 2026. https://encyclopegia.org/wiki/interstate-494.
APA
encyclopegia.org. (2026). Interstate 494. Retrieved November 25, 2026, from https://encyclopegia.org/wiki/interstate-494
Accessed November 25, 2026 · CC BY-SA 4.0 · citation page · JSON