encyclopegia.org

Karago

Karago was a municipality in the Western Region of Uganda.[src] In 2019, Karago was annexed by the city of Fort Portal, as part of the award of Tourism City status.[src] It became a neighborhood in the Northern Division of Fort Portal City.[src]

Karago was a municipality in the Western Region of Uganda.[src] In 2019, Karago was annexed by the city of Fort Portal, as part of the award of Tourism City status.[src] It became a neighborhood in the Northern Division of Fort Portal City.[src] ==Location== Karago Municipality was located in Karago Parish, Bukuku subcounty, Burahya County, in Kabarole District, in the Toro sub-region, in the Western Region of Uganda.[src] The neighborhood lies along the Fort Portal–Bundibugyo–Lamia Road, approximately northwest of the city center of Fort Portal, of which it is now a component.[src] The geographical coordinates of Karago are:0°40'37.0"N, 30°11'48.0"E (Latitude: 0.676944; Longitude: 30.196667).[src] ==Overview== Karago is a growing urban neighborhood in Fort Portal City, the capital of Kabarole District and the largest city in the Toro sub-region.[src] Online sources report the area size of the neighborhood as .[src] In 2015, the population of Karago was estimated at 12,045, of whom 6,127 (50.9 percent) were female and 5,918 (49.1 percent) were male.[src] ==Karago Drinking Water Supply Project== The government of Uganda (GOU), through the Ugandan Ministry of Water and Environment carried out the first phase of bringing potable water to Karago.[src] Phase 1 concluded in October 2021.[src] In September 2022, the GOU launched the second phase of this water supply project, intended to bring clean water to 21 villages surrounding the neighborhood of Karago.[src] Phase 2 involves the installation of a "pressed steel reservoir" with storage capacity of , on the side of the mountain.[src] This will be supplemented by the construction of a "reinforced concrete tank", two suppression stations and a "concrete sump".[src] 15 public taps will be erected and approximately of PVC pipe will be laid to distribute the drinking water to the target population.[src] The engineering, procurement and construction (EPC) contractor for phase II is Vidas Engineering Services, a Ugandan company with headquarters in Ntinda, in Kampala.[src] Water and Sanitation Development Facility–South West (WSDF–SW), a collaborative undertaking between GOU and the European Union is the supervising engineer.[src] The contract value is UGX:4.7 billion (approx.[src] US$1.2 million).[src] Construction is expected to take 12 months.[src] The table below illustrates the projection of the target population over the first 25 years of the project.[src] ==See also== Rwenzori Mountains ==Notes== ==References== ==External links== Minister launches 4.7 billion Karago water project As of 18 September 2022.[src]

25 sentences · 25 cited inline · 0 references stored

References

No reference rows published for this article.

Cite this article

MLA

"Karago." encyclopegia.org, 2026, https://encyclopegia.org/wiki/karago. Accessed 26 November 2026.

Chicago

"Karago." encyclopegia.org. Accessed November 26, 2026. https://encyclopegia.org/wiki/karago.

APA

encyclopegia.org. (2026). Karago. Retrieved November 26, 2026, from https://encyclopegia.org/wiki/karago

Accessed November 26, 2026 · CC BY-SA 4.0 · citation page · JSON

Claims

PredicateValueSource
population50.9 percentWikipedia

Related articles

Njeri Karago

enwiki · references available
CC BY-SA 4.0 · share-alike · https://en.wikipedia.org/w/index.php?oldid=1377805493 · 0.5 · snapshot enwiki-001377805493

Cite · JSON · Search

Related services and records

Services

  • Estate — measured countries, lanes and facts
  • Intel — live corroborated events
  • Legal — statutes, cases and citations
  • Encyclopedia — articles with inline sources
  • Space — launches, satellites and orbits
  • Search — federated search and reports
  • Pass — passport account and SSO
  • Corpora — read-only corpus origins
  • e01 — self-hosted corpora and tools

Text and metadata only; each target carries its own sources. Missing data is published as no-data, never estimated.