encyclopegia.org

Launch commit criteria

Launch commit criteria are the criteria which must be met in order for the countdown and launch of a Space Shuttle or other launch vehicle to continue. These criteria relate to safety issues and the general success of the launch, as opposed to supplemental data.

Launch commit criteria are the criteria which must be met in order for the countdown and launch of a Space Shuttle or other launch vehicle to continue. These criteria relate to safety issues and the general success of the launch, as opposed to supplemental data. ==Atlas V== Launch commit criteria for Atlas V launches are similar to those used for the Atlas V launch of the Mars Science Laboratory wind at the launch pad exceeds ceiling less than or visibility less than upper-level conditions containing wind shear that could lead to control problems for the launch vehicle. cloud layer greater than thick that extends into freezing temperatures cumulus clouds with tops that extend into freezing temperatures within of the edge of a thunderstorm that is producing lightning for 30 minutes after the last lightning is observed. field mill instrument readings within of the launch pad or the flight path exceed +/- 1,500 volts per meter for 15 minutes after they occur thunderstorm anvil is within of the flight path thunderstorm debris cloud is within or fly through a debris cloud for three hours Do not launch through disturbed weather that has clouds that extend into freezing temperatures and contain moderate or greater precipitation, or launch within of disturbed weather adjacent to the flight path Do not launch through cumulus clouds formed as the result of or directly attached to a smoke plume ==Falcon 9== . NASA has identified the Falcon 9 vehicle cannot be launched under the following conditions. sustained wind at the level of the launch pad in excess of , upper-level conditions containing wind shear that could lead to control problems for the launch vehicle, launch through a cloud layer greater than thick that extends into freezing temperatures, launch within of cumulus clouds with tops that extend into freezing temperatures, within of the edge of a thunderstorm that is producing lightning within 30 minutes after the last lightning is observed, within of an attached thunderstorm anvil cloud, within of disturbed weather clouds that extend into freezing temperatures and contain moderate or greater precipitation, within of a thunderstorm debris cloud, through cumulus clouds formed as the result of or directly attached to a smoke plume. The following should delay launch: delay launch for 15 minutes if field mill instrument readings within of the launch pad exceed +/- 1,500 volts per meter, or +/- 1,000 volts per meter, delay launch for 30 minutes after lightning is observed within of the launch pad or the flight path. Unique for Crew Dragon launches of the Falcon 9: weather downrange has a high chance or is violating splashdown limits (wind, wave, lightning, and precipitation limits) in case of a launch escape ==Space Shuttle== . ===Weather=== The weather conditions NASA required during countdown and launch were specified for "prior to loading external tank propellant" and "after loading propellant has begun". Weather forecasts were provided by the 45th Weather Squadron at nearby Patrick Air Force Base with concerns such as thunderstorms, winds, low cloud ceilings, or anvil clouds noted in the report. ===Prior to loading propellant=== Tanking was not to begin if the 24-hour average temperature had been below , the wind was observed or forecast to exceed for the next three-hour period, or there was a forecast to be greater than a 20% chance of lightning within five nautical miles of the launch pad during the first hour of tanking. ==References== ==External links== from Patrick Space Force Base Example pre-launch weather report from MAVEN pre-launch press conference

References

No reference rows published for this article.

Cite this article

MLA

"Launch commit criteria." encyclopegia.org, 2026, https://encyclopegia.org/wiki/launch-commit-criteria. Accessed 24 November 2026.

Chicago

"Launch commit criteria." encyclopegia.org. Accessed November 24, 2026. https://encyclopegia.org/wiki/launch-commit-criteria.

APA

encyclopegia.org. (2026). Launch commit criteria. Retrieved November 24, 2026, from https://encyclopegia.org/wiki/launch-commit-criteria

Accessed November 24, 2026 · CC BY-SA 4.0 · citation page · JSON

Related articles

Vandenberg Space Launch Complex 5

stub · references available

Launch and Early Orbit Phase

stub · references available

Cape Canaveral Launch Complex 30

stub · references available

launch escape system

stub · references available

Cape Canaveral Launch Complex 11

stub · references available

Cape Canaveral Launch Complex 34

stub · references available

Taiyuan Satellite Launch Center

stub · references available

Milan criteria

stub · references available
CC BY-SA 4.0 · tier1-factual · https://en.wikipedia.org/w/index.php?oldid=1372450168 · 0.55 · snapshot launch-commit-criteria-736001-710fc52c45ae3373 · QID Q6498424

Cite · JSON · Search

Related services and records

Services

  • Estate — measured countries, lanes and facts
  • Intel — live corroborated events
  • Legal — statutes, cases and citations
  • Encyclopedia — articles with inline sources
  • Space — launches, satellites and orbits
  • Search — federated search and reports
  • Pass — passport account and SSO
  • Corpora — read-only corpus origins
  • e01 — self-hosted corpora and tools

Text and metadata only; each target carries its own sources. Missing data is published as no-data, never estimated.