Linear scheduling method (LSM) is a graphical scheduling method focusing on continuous resource utilization in repetitive activities.

Linear scheduling method (LSM) is a graphical scheduling method focusing on continuous resource utilization in repetitive activities. ==Application== LSM is used mainly in the construction industry to schedule resources in repetitive activities commonly found in highway, pipeline, high-rise building and rail construction projects. These projects are called repetitive or linear projects. The main advantages of LSM over critical path method (CPM) is its underlying idea of keeping resources continuously at work. In other words, it schedules activities in such a way that: resource utilization is maximized; interruption in on-going process is minimized, including hiring-and-firing; and the effect of the learning curve phenomenon is maximized ==Alternative names== Specific names for the linear scheduling method have been adopted, such as: Location-based scheduling (the preferred term in the book) Harmonograms Line-of-balance Flowline or flow line Repetitive scheduling method Vertical production method Time-location matrix model Time space scheduling method Disturbance scheduling Horizontal and vertical logic scheduling for multistory projects Horizontal and vertical scheduling Multiple repetitive construction process Representing construction Linear scheduling Time versus distance diagrams (T-D charts) Time chainage Linear balance charts Velocity diagrams ==See also== List of project management software List of project management topics Project management Project planning Sequence step algorithm Time distance diagram Work breakdown structure ==References== ==Further reading== James Wonneberg and Ron Drake (2016) Linear Scheduling 101 Robert B. Harris and Photios G. Ioannou Repetitive Scheduling Method David W. Johnston Frank Harris and Ronald McCaffer Modern Construction Management 6th Ed UK: Blackwell Publishing

References

No reference rows published for this article.

Cite this article

MLA

"Linear scheduling method." encyclopegia.org, 2026, https://encyclopegia.org/wiki/linear-scheduling-method. Accessed 24 November 2026.

Chicago

"Linear scheduling method." encyclopegia.org. Accessed November 24, 2026. https://encyclopegia.org/wiki/linear-scheduling-method.

APA

encyclopegia.org. (2026). Linear scheduling method. Retrieved November 24, 2026, from https://encyclopegia.org/wiki/linear-scheduling-method

Accessed November 24, 2026 · CC BY-SA 4.0 · citation page · JSON

CC BY-SA 4.0 · share-alike · https://en.wikipedia.org/w/index.php?oldid=1366336276 · 0.5 · snapshot enwiki-001366336276

Cite · JSON · Search

Related services and records

Services

  • Estate — measured countries, lanes and facts
  • Intel — live corroborated events
  • Legal — statutes, cases and citations
  • Encyclopedia — articles with inline sources
  • Space — launches, satellites and orbits
  • Search — federated search and reports
  • Pass — passport account and SSO
  • Corpora — read-only corpus origins
  • e01 — self-hosted corpora and tools

Text and metadata only; each target carries its own sources. Missing data is published as no-data, never estimated.