encyclopegia.org

MasTec

Mastec, Inc.[src] is an American infrastructure engineering and construction company based in Coral Gables, Florida.[src] The company provides engineering, building, installation, maintenance and upgrade of energy, utility and communications infrastructure.[src] Its customers are primarily in the utility, communications and government industries.[src] The company was founded in March 1994 by Jorge Mas Canosa, father of MasTec's current chief executive officer Jose Mas.[src] The company was listed on the New York Stock Exchange in 1998.[src] MasTec, Inc.[src] is the second largest Hispanic-owned company in the United States with over 20,000 employees in North America.[src]

Mastec, Inc.[src] is an American infrastructure engineering and construction company based in Coral Gables, Florida.[src] The company provides engineering, building, installation, maintenance and upgrade of energy, utility and communications infrastructure.[src] Its customers are primarily in the utility, communications and government industries.[src] The company was founded in March 1994 by Jorge Mas Canosa, father of MasTec's current chief executive officer Jose Mas.[src] The company was listed on the New York Stock Exchange in 1998.[src] MasTec, Inc.[src] is the second largest Hispanic-owned company in the United States with over 20,000 employees in North America.[src] ==History== ===Early 1900s: Beginning as Burnup & Sims=== The company was formed by the merger of two separate companies: Burnup & Sims and Church & Tower.[src] Burnup & Sims was the oldest of the two founding companies and was founded in 1929 by two unemployed carpenters, Russell Burnup and Riley V.[src] Sims, to provide design, construction, and maintenance services to the telephone and utilities industries.[src] During the years of the Great Depression, the two established an office in West Palm Beach, Florida, and by 1936, had a small fleet of trucks and staff.[src] The company's first telecommunications projects were undertaken the following year at Cape Canaveral, where it was responsible for burying 85 miles of cable.[src] B&S contributed to national defense during World War II by building airfields and telephone systems.[src] After the war, the company became involved in the laying of underwater cable from Florida to Puerto Rico, and from there to Barbados, for such companies as AT&T and General Telephone.[src] Projects then took on a greater geographical scope, as B&S established underground telecommunications systems and built radio towers in Costa Rica, Barbados, Trinidad-Tobago, and Venezuela.[src] ===1990s: Founding of MasTec=== On March 11, 1994, Church & Tower Group acquired 65 percent of the outstanding common stock of publicly traded Burnup & Sims, Inc.[src] The name of Burnup & Sims was changed to MasTec, Inc., Jorge Mas Canosa became MasTec's chairman and his son, Jorge Mas, was named president and chief executive officer.[src] Mastec was now regarded as a “minority business enterprise,” publicly traded on NASDAQ under the symbol MTZ.[src] ==Executives== Jorge Mas is the current chairman of the board for MasTec, and former CEO.[src] He served as CEO from 1992 to 1997, and is the brother of current CEO, Jose Mas.[src] Jose Mas is the CEO of MasTec.[src] He was appointed in 2007.[src] Robert Apple has been COO since 2006.[src] Formerly, he was group president for MasTec's energy service operations.[src] C.[src] Robert Campbell has been executive vice president and CFO since October 2004.[src] Alberto de Cardenas is executive vice president and general counsel; he has been responsible for all of MasTec's corporate and operational legal matters and corporate secretary matters since 2005.[src] ==Industries== ===Renewable energy=== In the renewable energy sector, MasTec is a contractor that constructs wind farms, solar energy facilities and power plants.[src] Through their wholly owned subsidiary, Wanzek Construction, MasTec has built several wind farms, including Clipper Wind Farm in Jefferson, Minnesota; Taloga Wind Farm, in Putnam, Oklahoma; Crow Lake Wind Farm, in White Lake, South Dakota; Goat Mountain Wind Farm, in Robert Lee, Texas; and Laredo Ridge, in Boone County, Nebraska.[src] Solar Energy projects include Douglas County Schools, in Denver, Colorado, where photo voltaic panels were installed onto 31 rooftops, and the Willows, California, Solar Project.[src] MasTec also designed and built the Cornhusker Energy Power Plant, in Lexington, Nebraska.[src] MasTec Power Corp.[src] is another wholly owned subsidiary providing renewable energy Engineering, procurement, and construction management (EPC) services for a variety of fuel types.[src] ===Electric power=== In the Electric Power Industry, MasTec is a contractor that builds and maintains high voltage electric power transmission systems, sub stations and switch yards, and distribution systems.[src] Through their subsidiaries Wanzek Construction and MasTec Power Corp., MasTec is capable of providing design-build, EPC, and construction services for a variety of clients in the utility and private power producing markets.[src] ===Oil and natural gas=== MasTec builds pipelines for the transportation of crude oil and natural gas.[src] They also build pumping stations, compressor stations, and treatment facilities where oil and natural gas are conditioned before transporting to market.[src] ===Water and sewer=== In the water distribution and waste industry, MasTec builds water and waste water pipelines for municipalities throughout Florida and the Caribbean Islands.[src] ===Communications=== MasTec's original line of business was in the communications industry, constructing transmission lines and digging trenches for companies like Bell South in Florida.[src] Now, MasTec is a major contractor for wireless networks and broadband, as well.[src] They construct and maintain radio towers for mobile phone carriers, and do the trenching required to install fiber optic cable.[src] Under its subsidiary MasTec Advanced Technologies, the company is also one of the largest providers of in-home installation of DirecTV in the United States and installing residential security systems for AT&T Digital Life.[src] ==Projects== ===Craw-Kan Telephone Line=== The Craw-Kan Telephone Line is in southeast Kansas.[src] MasTec installed 962 miles of transmission line.[src] ===North Valley Transmission Line=== The North Valley Transmission Line is a 500/250 high voltage transmission line in Pinnacle Peak, Arizona.[src] The services they provided included setting foundations, erecting steel poles, and installing conductor wire.[src] ===Puerto Rico power grid rebuild=== In June 2018, MasTec was awarded a $500M one-year contract for the restoration, reconstruction and modernization of Puerto Rico's still-vulnerable power grid, damaged in September 2017 by the powerful Hurricane Maria.[src] ===Ruby Pipeline=== The Ruby Pipeline is a 42-inch (1,100 mm) natural gas pipeline running from Opal, Wyoming, to Malin, Oregon.[src] The route crosses Northern Utah, and Northern Nevada.[src] Ruby Pipeline, L.L.C.[src] filed an application with the Federal Energy Regulatory Commission (FERC) on January 27, 2009, authorizing the construction and operation of the Ruby Pipeline Project.[src] On April 5, 2010, the FERC approved the application.[src] Construction began on July 31, 2010, and the pipeline was placed in service on July 28, 2011.[src] The pipe is 680 miles (1,090 km) long and is expected to output 1.5 billion cubic feet per day (42×106 m3/d).[src] MasTec, and its subsidiary Precision Pipeline, was awarded spreads 4 and 5 of the Ruby Pipeline Project, including the fabrication of mainline valves, launchers and receivers and associated foundations in the spring of 2010.[src] An automatic welding process was used to install the 256 miles of 42" pipeline.[src] ===Taloga Wind Farm=== The Taloga Wind Farm was constructed in 2011 and is located near Putnam, Oklahoma.[src] The project produces an estimated 324GW.h of power annually and consists of 54 Mitsubishi MWT95 2.4MW turbines and over 20 miles of transmission line.[src] During construction, MasTec employees volunteered their time and efforts to clean up a nearby lake.[src] Thirty-seven MasTec employees walked the 63 mile shoreline surrounding Foss Lake and removed eight large dumpsters of trash.[src] ===Willows Solar Power Facility=== MasTec completed the Willows, California, solar power facility in May 2011.[src] The 380kv system consists of 58 Dual Axis trackers with 24 PV Modules mounted to each tracker.[src] The system will provide power to the city's waste water treatment plant.[src] ==External links==[src]

73 sentences · 73 cited inline · 0 references stored

References

No reference rows published for this article.

Cite this article

MLA

"MasTec." encyclopegia.org, 2026, https://encyclopegia.org/wiki/mastec. Accessed 25 November 2026.

Chicago

"MasTec." encyclopegia.org. Accessed November 25, 2026. https://encyclopegia.org/wiki/mastec.

APA

encyclopegia.org. (2026). MasTec. Retrieved November 25, 2026, from https://encyclopegia.org/wiki/mastec

Accessed November 25, 2026 · CC BY-SA 4.0 · citation page · JSON

Claims

PredicateValueSource
date of foundation1994Wikipedia
employees20,000 employeesWikipedia
date of foundation1929Wikipedia
date of establishment1936Wikipedia
CC BY-SA 4.0 · share-alike · https://en.wikipedia.org/w/index.php?oldid=1377523480 · 0.5 · snapshot enwiki-001377523480

Cite · JSON · Search

Related services and records

Services

  • Estate — measured countries, lanes and facts
  • Intel — live corroborated events
  • Legal — statutes, cases and citations
  • Encyclopedia — articles with inline sources
  • Space — launches, satellites and orbits
  • Search — federated search and reports
  • Pass — passport account and SSO
  • Corpora — read-only corpus origins
  • e01 — self-hosted corpora and tools

Text and metadata only; each target carries its own sources. Missing data is published as no-data, never estimated.