encyclopegia.org

MeyGen

MeyGen (full name MeyGen tidal energy project) is a tidal stream energy plant in the north of Scotland.[src] The project is located in the Pentland Firth, specifically the Inner Sound between the Island of Stroma and the Scottish mainland.[src] It is being constructed in a phased manner.[src] The first phase of the project uses four 1.5 MW turbines with rotors which were installed submerged on the seabed in winter 2016/17.[src] Meygen has been claimed to be the "world's largest tidal stream power project".[src] A total of 59 MW of further capacity was awarded in the Contracts for Difference Allocations Rounds 4, 5 and 6 covering 2021-2024.[src] There are plans for up to 400 MW to be installed at the site.[src] The project is owned and run by Ampeak Energy (formerly called SAE Renewables, SIMEC Atlantis Energy, and prior to 2017 Atlantis Resources).[src] It was previously owned and run by Tidal Power Scotland Limited and Scottish Enterprise.[src] The high speed of currents in the area, reaching up to , made the chosen site in the Pentland Firth well suited to this type of energy generation.[src]

MeyGen (full name MeyGen tidal energy project) is a tidal stream energy plant in the north of Scotland.[src] The project is located in the Pentland Firth, specifically the Inner Sound between the Island of Stroma and the Scottish mainland.[src] It is being constructed in a phased manner.[src] The first phase of the project uses four 1.5 MW turbines with rotors which were installed submerged on the seabed in winter 2016/17.[src] Meygen has been claimed to be the "world's largest tidal stream power project".[src] A total of 59 MW of further capacity was awarded in the Contracts for Difference Allocations Rounds 4, 5 and 6 covering 2021-2024.[src] There are plans for up to 400 MW to be installed at the site.[src] The project is owned and run by Ampeak Energy (formerly called SAE Renewables, SIMEC Atlantis Energy, and prior to 2017 Atlantis Resources).[src] It was previously owned and run by Tidal Power Scotland Limited and Scottish Enterprise.[src] The high speed of currents in the area, reaching up to , made the chosen site in the Pentland Firth well suited to this type of energy generation.[src]

20 sentences · 20 cited inline · 0 references stored

References

No reference rows published for this article.

Cite this article

MLA

"MeyGen." encyclopegia.org, 2026, https://encyclopegia.org/wiki/meygen. Accessed 27 November 2026.

Chicago

"MeyGen." encyclopegia.org. Accessed November 27, 2026. https://encyclopegia.org/wiki/meygen.

APA

encyclopegia.org. (2026). MeyGen. Retrieved November 27, 2026, from https://encyclopegia.org/wiki/meygen

Accessed November 27, 2026 · CC BY-SA 4.0 · citation page · JSON

CC BY-SA 4.0 · share-alike · https://en.wikipedia.org/w/index.php?oldid=1347321018 · 0.5 · snapshot enwiki-001347321018

Cite · JSON · Search

Related services and records

Services

  • Estate — measured countries, lanes and facts
  • Intel — live corroborated events
  • Legal — statutes, cases and citations
  • Encyclopedia — articles with inline sources
  • Space — launches, satellites and orbits
  • Search — federated search and reports
  • Pass — passport account and SSO
  • Corpora — read-only corpus origins
  • e01 — self-hosted corpora and tools
  • Careers — open roles: frontier engineers and sales partners

Text and metadata only; each target carries its own sources. Missing data is published as no-data, never estimated.