encyclopegia.org

Moralane

Moralane is a key site on the North-South Carrier (NSC), in Botswana, the main pipeline delivering raw water from the northeast to the Mmamashia water treatment plant just north of Gaborone.[src] Phase 1 of the NSC opened in 2000, delivering water from the Letsibogo Dam on the Motloutse River.[src] A reinforced concrete break pressure tank (BPT1) and a pumping station (PS2.1) were installed at Moralane in this phase.[src] The break pressure tank has the capacity of and the pumping station has the capacity of per second.[src] Phase 2 of the NSC is due to start delivering water from the Dikgatlhong Dam on the Shashe River in 2014.[src] The new pipeline from the Dikgatlhong Dam runs parallel to the existing pipeline along the section from the Letsibogo Dam to Moralane, causing concerns that blasting for the new pipeline may cause problems with the existing pipeline.[src] The pumping equipment at Moralane will be upgraded by introduction of a variable speed drive.[src] Initially, the water from both dams will be delivered through the same pipeline from Moralane south to Palapye.[src] An extension of the NSC is being considered to carry the Zambezi's water from Pandamatenga via Francistown to BPT1 at Moralane.[src] A pre-feasibility study was delivered to the Department of Water Affairs in April 2010.[src] This expansion would deliver another of water annually through the Moralane plant.[src]

Moralane is a key site on the North-South Carrier (NSC), in Botswana, the main pipeline delivering raw water from the northeast to the Mmamashia water treatment plant just north of Gaborone.[src] Phase 1 of the NSC opened in 2000, delivering water from the Letsibogo Dam on the Motloutse River.[src] A reinforced concrete break pressure tank (BPT1) and a pumping station (PS2.1) were installed at Moralane in this phase.[src] The break pressure tank has the capacity of and the pumping station has the capacity of per second.[src] Phase 2 of the NSC is due to start delivering water from the Dikgatlhong Dam on the Shashe River in 2014.[src] The new pipeline from the Dikgatlhong Dam runs parallel to the existing pipeline along the section from the Letsibogo Dam to Moralane, causing concerns that blasting for the new pipeline may cause problems with the existing pipeline.[src] The pumping equipment at Moralane will be upgraded by introduction of a variable speed drive.[src] Initially, the water from both dams will be delivered through the same pipeline from Moralane south to Palapye.[src] An extension of the NSC is being considered to carry the Zambezi's water from Pandamatenga via Francistown to BPT1 at Moralane.[src] A pre-feasibility study was delivered to the Department of Water Affairs in April 2010.[src] This expansion would deliver another of water annually through the Moralane plant.[src] ==References== Citations Sources[src]

23 sentences · 23 cited inline · 0 references stored

References

No reference rows published for this article.

Cite this article

MLA

"Moralane." encyclopegia.org, 2025, https://encyclopegia.org/wiki/moralane. Accessed 27 November 2026.

Chicago

"Moralane." encyclopegia.org. Accessed November 27, 2026. https://encyclopegia.org/wiki/moralane.

APA

encyclopegia.org. (2025). Moralane. Retrieved November 27, 2026, from https://encyclopegia.org/wiki/moralane

Accessed November 27, 2026 · CC BY-SA 4.0 · citation page · JSON

CC BY-SA 4.0 · share-alike · https://en.wikipedia.org/w/index.php?oldid=1275181202 · 0.5 · snapshot enwiki-001275181202

Cite · JSON · Search

Related services and records

Services

  • Estate — measured countries, lanes and facts
  • Intel — live corroborated events
  • Legal — statutes, cases and citations
  • Encyclopedia — articles with inline sources
  • Space — launches, satellites and orbits
  • Search — federated search and reports
  • Pass — passport account and SSO
  • Corpora — read-only corpus origins
  • e01 — self-hosted corpora and tools

Text and metadata only; each target carries its own sources. Missing data is published as no-data, never estimated.