Mpanda River
The Mpanda River ( ) is a river in Bubanza Province, Burundi.[src] It is a tributary of the Ruzizi River.[src]
The Mpanda River ( ) is a river in Bubanza Province, Burundi.[src] It is a tributary of the Ruzizi River.[src] ==Course== The Mpanda River and the Kajeke River are the only permanent tributaries of the Rusizi in its lower plain.[src] The Mpanda rises near the crest of the Zaire-Nile ridge, and flows across the plain for about .[src] About from the Rusizi it crosses an enormous expanse of marshes that connect to the Mutimbuzi River basin.[src] The Mpanda rises in the Kibira National Park on the border between Muramvya Province and Bubanza Province.[src] It flows west and then south-southwest through Bubanza Province past the towns of Mpanda and Murengeza, then flows southwest along the boundary between Bubanza Province and Bujumbura Rural Province.[src] It defines the north end of the Melchior Ndadaye International Airport, then joins the Ruzizi River just north of its mouth on Lake Tanganyika.[src] The Mpanda is up to wide and deep.[src] In dry periods the flow may be only , but it can become a torrent in flood periods.[src] ==Issues== In October 2020 the standpipes in Rukaramu, Commune of Mutimbuzi, Bujumbura Rural Province, had been dry for over six months.[src] The inhabitants were forced to use water from the Mpanda River.[src] In November 2020 the river banks collapsed and Mpanda River left its bed near Rukaramu.[src] In March 2021 the Gatura irrigation dam on the Mpanda River gave way, causing a risk that over of rice fields in the communes of Mpanda and Gihanga would dry up.[src] A possible solution was to divert the nearby Nyaburiga River into the dam's canal.[src] In May 2021 the river threatened to break the dam that protects the infrastructure of the Melchior Ndadaye International Airport.[src] ==Hydroelectricity== Work began on a hydroelectric dam on the Mpanda River in 2011, with an estimated cost of US$54 million.[src] The contractors included the Chinese company CENEMA-CGC for the power plant buildings and equipment, and Angelique International for the connection station and distribution line.[src] Work stopped in 2017 after 45% had been completed, since the contractors had not been paid for the remaining work.[src] In October 2021 Evariste Ndayishimiye, President of Burundi, visited the site, where he found that some of the structures had already collapsed.[src] In June 2021 the French company Hydroneo East Africa received a $1 million development loan from the British government's Renewable Energy Performance Platform (REPP) for implementation of a 10.2MW run-of-river hydroelectric project on the rapids of the Mpanda River.[src] The project needed $43.5 million in total, and Hydroneo expected to complete financing in 2022.[src] In June 2023 Hydroneo East Africa invited separate tenders for construction of the Mpanda Hydroelectric Power Station and for the power transmission line from the plant and the Rubirizi substation.[src] ==References== ==Sources==[src]
26 sentences · 26 cited inline · 0 references stored
References
No reference rows published for this article.
Cite this article
MLA
"Mpanda River." encyclopegia.org, 2026, https://encyclopegia.org/wiki/mpanda-river. Accessed 25 November 2026.
Chicago
"Mpanda River." encyclopegia.org. Accessed November 25, 2026. https://encyclopegia.org/wiki/mpanda-river.
APA
encyclopegia.org. (2026). Mpanda River. Retrieved November 25, 2026, from https://encyclopegia.org/wiki/mpanda-river
Accessed November 25, 2026 · CC BY-SA 4.0 · citation page · JSON