NorGer

NorGer was one of two planned electricity cables between Germany and Norway.[src] The other proposed project was NordLink, which Statnett decided to proceed with in 2015, and NorGer was cancelled.[src]

NorGer was one of two planned electricity cables between Germany and Norway.[src] The other proposed project was NordLink, which Statnett decided to proceed with in 2015, and NorGer was cancelled.[src] ==Description== NorGer interconnector will start in Tonstad in Norway.[src] From Tonstad overhead powerline runs to the Flekkefjord area.[src] From Flekkefjord a long high voltage direct current submarine cable will run through the North Sea to Mooriem in Lower Saxony, Germany.[src] It will be laid on the Norwegian, German and Danish Continental Shelf.[src] The precise cable route is decided from a thorough mapping of the sea-bed along the prospective cable route.[src] The sea route is consulted by Offshore Marine Management.[src] NorGer will have a transmission capacity of and an operating voltage of 450–500 kV.[src] The price per kWh could rise by 0.8 øre in Norway.[src] The sea cable is planned as a bipolar system with earthing through the return cable.[src] This way, the disadvantages of a ground-return electrode with earthing in the sea, such as production of chlorine compounds and metal corrosion, are avoided.[src] Anticipated life span of the cable would be about 40 years.[src] Since the power supply in both Germany and Norway is based on alternating current, converter stations must be built in both countries.[src] ==Project company== The project is developed by NorGer KS, a company that is owned by the Norwegian transmission system operator Statnett, energy utilities Agder Energi and Lyse Produksjon, and the Swiss company Elektrizitäts-Gesellschaft Laufenburg.[src] NorGer is registered in Norway.[src] Statnett owns 50% of the projects while all other partners own stake of 16.67% each.[src] ==Environment== NorGer will use the best available technology to limit the cable’s impact on the environment.[src] Previous investigations show that underwater HVDC cables have no known impact on sea life.[src] ==Climate gain== In periods of overproduction, German wind power can be transported to Norway while water in Norwegian reservoirs can be stored for later use.[src] With limited access to pumped hydro power stations in Southern Germany it is difficult to use the increase in wind power in the North German coastal areas.[src] The cable connection would also be important for Norway’s plans to use more wind power.[src] Power supply from wind power varies from hour to hour according to wind strength and access to reserve power is often needed to meet variable demand.[src] Hydroelectric power, with its regulatory capacity is a cheap and reliable balancing power source for wind power.[src] ==See also== HVDC Norway–UK Scotland-Norway interconnector ==References== ==External links==[src]

27 sentences · 27 cited inline · 0 references stored

References

No reference rows published for this article.

Cite this article

MLA

"NorGer." encyclopegia.org, 2026, https://encyclopegia.org/wiki/norger. Accessed 26 November 2026.

Chicago

"NorGer." encyclopegia.org. Accessed November 26, 2026. https://encyclopegia.org/wiki/norger.

APA

encyclopegia.org. (2026). NorGer. Retrieved November 26, 2026, from https://encyclopegia.org/wiki/norger

Accessed November 26, 2026 · CC BY-SA 4.0 · citation page · JSON

CC BY-SA 4.0 · share-alike · https://en.wikipedia.org/w/index.php?oldid=1373456006 · 0.5 · snapshot enwiki-001373456006

Cite · JSON · Search

Related services and records

Services

  • Estate — measured countries, lanes and facts
  • Intel — live corroborated events
  • Legal — statutes, cases and citations
  • Encyclopedia — articles with inline sources
  • Space — launches, satellites and orbits
  • Search — federated search and reports
  • Pass — passport account and SSO
  • Corpora — read-only corpus origins
  • e01 — self-hosted corpora and tools

Text and metadata only; each target carries its own sources. Missing data is published as no-data, never estimated.