NorNed
NorNed is a long high-voltage direct current submarine power cable between Feda, Norway and the seaport of Eemshaven in the Netherlands, which interconnects both countries' electrical grids. It was once the longest submarine power cable in the world. Budgeted at €550 million, and completed at a cost of €600m, the NorNed cable is a bipolar HVDC link with a voltage of ±450 kV and a capacity of 700 MW. NorNed is a joint project of the Norwegian transmission system operator Statnett and its Dutch counterpart TenneT. The cable system itself and the two converter stations were produced by ABB.
NorNed is a long high-voltage direct current submarine power cable between Feda, Norway and the seaport of Eemshaven in the Netherlands, which interconnects both countries' electrical grids. It was once the longest submarine power cable in the world. Budgeted at €550 million, and completed at a cost of €600m, the NorNed cable is a bipolar HVDC link with a voltage of ±450 kV and a capacity of 700 MW. NorNed is a joint project of the Norwegian transmission system operator Statnett and its Dutch counterpart TenneT. The cable system itself and the two converter stations were produced by ABB. The NorNed Project (Statnett website) The NorNed Project (TenneT website) The NorNed Project (ABB website) 4c page Weekly exchange (Nord Pool data)
References
No reference rows published for this article.
Cite this article
MLA
"NorNed." encyclopegia.org, 2026, https://encyclopegia.org/wiki/norned. Accessed 25 November 2026.
Chicago
"NorNed." encyclopegia.org. Accessed November 25, 2026. https://encyclopegia.org/wiki/norned.
APA
encyclopegia.org. (2026). NorNed. Retrieved November 25, 2026, from https://encyclopegia.org/wiki/norned
Accessed November 25, 2026 · CC BY-SA 4.0 · citation page · JSON