PATH (rail system)
The Port Authority Trans-Hudson (PATH) is a rapid transit system in the northeastern United States.[src] It serves the northeastern New Jersey cities of Newark, Harrison, Jersey City, and Hoboken, as well as Lower and Midtown Manhattan in New York City.[src] The PATH is operated as a wholly owned subsidiary of the Port Authority of New York and New Jersey.[src] Trains run around the clock year-round; four routes serving 13 stations operate daily, while two routes operate during late nights.[src] The PATH crosses the Hudson River through cast iron tunnels that rest on a bed of silt on the river bottom.[src] It operates as a deep-level subway in Manhattan and the Jersey City and Hoboken riverfronts; from Grove Street in Jersey City to Newark, trains run in open cuts, at grade level, and on elevated track.[src] In , the system saw rides, or about per weekday in , making it the fifth-busiest rapid transit system in the United States.[src] The routes of the PATH system were originally operated by the Hudson & Manhattan Railroad (H&M), built to link New Jersey's Hudson Waterfront with New York City.[src] The system began operations in 1908 and was fully completed in 1911.[src] Three stations have since closed; two others were relocated after a re-alignment of the western terminus.…[src]
The Port Authority Trans-Hudson (PATH) is a rapid transit system in the northeastern United States.[src] It serves the northeastern New Jersey cities of Newark, Harrison, Jersey City, and Hoboken, as well as Lower and Midtown Manhattan in New York City.[src] The PATH is operated as a wholly owned subsidiary of the Port Authority of New York and New Jersey.[src] Trains run around the clock year-round; four routes serving 13 stations operate daily, while two routes operate during late nights.[src] The PATH crosses the Hudson River through cast iron tunnels that rest on a bed of silt on the river bottom.[src] It operates as a deep-level subway in Manhattan and the Jersey City and Hoboken riverfronts; from Grove Street in Jersey City to Newark, trains run in open cuts, at grade level, and on elevated track.[src] In , the system saw rides, or about per weekday in , making it the fifth-busiest rapid transit system in the United States.[src] The routes of the PATH system were originally operated by the Hudson & Manhattan Railroad (H&M), built to link New Jersey's Hudson Waterfront with New York City.[src] The system began operations in 1908 and was fully completed in 1911.[src] Three stations have since closed; two others were relocated after a re-alignment of the western terminus.[src] From the 1920s, the rise of automobile travel and the concurrent construction of bridges and tunnels across the river sent the H&M into a financial decline during the Great Depression, from which it never recovered, and it was forced into bankruptcy in 1954.[src] As part of the deal that cleared the way for the construction of the original World Trade Center, the Port Authority bought the H&M out of receivership in 1962 and renamed it PATH.[src] In the 2000s and 2010s, the system suffered longstanding interruptions from disasters that affected the New York metropolitan area, most notably the September 11 attacks and Hurricane Sandy.[src] Both private and public stakeholders have proposed expanding PATH service in New Jersey, though none have been funded .[src] Although PATH has operated as a rapid transit system since 1966, it is legally a commuter railroad under the jurisdiction of the Federal Railroad Administration (FRA).[src] Its right-of-way between Jersey City and Newark is located in close proximity to Conrail, NJ Transit, and Amtrak trackage, and it shares the Dock Bridge with intercity and commuter trains.[src] All PATH train operators must therefore be licensed railroad engineers, trains must have conductors on board, and extra inspections are required.[src] Since 2011, PATH has used one class of rolling stock, the PA5.[src] === Hudson & Manhattan Railroad === The PATH system pre-dates the New York City Subway's first underground line, operated by the Interborough Rapid Transit Company.[src] The Hudson & Manhattan Railroad (H&M) was planned in 1874, but it was not possible at that time to safely tunnel under the Hudson River.[src] Construction began on the existing tunnels in 1890, but soon stopped when funding ran out.[src] It resumed in 1900 under the direction of William Gibbs McAdoo, an ambitious young lawyer who had moved to New York from Chattanooga, Tennessee, and later became president of the H&M.[src] The railroad became so closely associated with McAdoo that, in its early years, its lines were called the McAdoo Tubes or McAdoo Tunnels.[src] === Port Authority takeover === In the early 1960s, planning for the World Trade Center resulted in a compromise between the Port Authority and the state governments of New York and New Jersey.[src] The Port Authority agreed to purchase and maintain the Tubes in return for the rights to build the World Trade Center on the footprint of H&M's Hudson Terminal, which was the Lower Manhattan terminus of the Tubes.[src] A formal agreement was made in January 1962; four months later, the Port Authority set up two wholly owned subsidiaries: the Port Authority Trans-Hudson Corporation (PATH) to operate the H&M lines, as well as another subsidiary to operate the World Trade Center.[src] All of the Port Authority's operations would have been subjected to federal Interstate Commerce Commission rules if it ran the trains directly, but with the creation of the PATH Corporation, only the subsidiary's operations would be federally regulated.[src] In September, the Port Authority formally took over the H&M Railroad and the Tubes, rebranding the system as Port Authority Trans-Hudson (PATH).[src] Upon taking over the H&M, the PANYNJ spent $70 million to modernize the system's infrastructure ($ in ).[src] The PANYNJ also repainted H&M stations into the new PATH livery.[src] In 1964, the authority ordered 162 PA1 railway cars to replace the H&M rolling stock, much of which dated to 1909.[src] The first PA1 cars were delivered in 1965.[src] Subsequently, the agency ordered 44 PA2 cars in 1967 and 46 PA3 cars in 1972.[src] ===Late 20th century=== ====Post-Hurricane Sandy==== In the early morning hours of October 29, 2012, all PATH service was suspended in advance of Hurricane Sandy.[src] The following day, New Jersey Governor Chris Christie announced that PATH service would be out for 7–10 days due to the storm damage.[src] Storm surge from the hurricane caused significant flooding to the Hoboken and Jersey City stations, as well as at the World Trade Center.[src] An image captured by a PATH security camera showing water flowing into Hoboken during the storm went viral online and became one of several representative images of the hurricane.[src] The first PATH trains after the hurricane were the Journal Square–33rd Street service, which resumed on November 6 and ran only in daytime.[src] Service was extended west to Harrison and Newark on November 12, in place of the Newark–World Trade Center service.[src] Christopher Street and Ninth Street were reopened during the weekend of November 17–18, but remained closed for five days afterward.[src] Normal weekday service on the Newark–World Trade Center and Journal Square–33rd Street lines resumed on November 26.[src] On weekends, trains operated using the Newark–33rd Street service pattern.[src] The PATH station at Hoboken Terminal suffered major damage after floodwaters as high as submerged the tunnels; it was closed for several weeks for $300 million worth of repairs.[src] The Newark–33rd Street route was suspended for two weekends in mid-December, with the Newark–World Trade Center running in its place, in order to expedite the return of Hoboken service.[src] Hoboken Terminal reopened in December for weekday daytime Hoboken–33rd Street service, followed by the resumption of weekday 24-hour PATH service in early 2013.[src] The Hoboken–World Trade Center trains resumed in late January, and all normal service was restored by March.[src] The Downtown Hudson Tubes were severely damaged by Sandy.[src] As a result, to accommodate repairs, service on the Newark–World Trade Center line between Exchange Place and World Trade Center was to be suspended during almost all weekends, except for holidays, in 2019 and 2020.[src] However, weekend service was restored in June 2020, six months ahead of schedule.[src] ====2010s improvements==== The Port Authority began rebuilding the Harrison station in 2009.[src] It has longer and wider platforms to allow 10-car trains; street-level-to-platform elevators within the platform extensions, in compliance with the ADA, and architectural modifications.[src] The westbound platform of the new Harrison station opened to the public in October 2018 and the eastbound one the following June.[src] In January 2010, Christopher O.[src] Ward, as executive director, announced that PATH would be spending $321 million on communications-based train control (CBTC) with Siemens' Trainguard MT, upgrading its signal system for an increase in ridership.[src] CBTC would replace a four-decade old fixed-block signaling system.[src] It would reduce the headway time between trains, allowing more to run during rush hours.[src] At the same time, the entire PATH fleet was replaced with 340 CBTC-equipped PA5 cars, built by Kawasaki Railcar.[src] The original contract was completed in 2011; additional cars were delivered in subsequent years.[src] PATH's goal was to increase passenger capacity from 240,000 passengers a day to 290,000.[src] The entire CBTC system was originally expected to become operational in 2017.[src] The Port Authority also spent $659 million to upgrade 13 platforms on the Newark–World Trade Center line to accommodate 10-car trains; until then, the line could only run eight-car trains.[src] Along with CBTC, PATH began installing positive train control (PTC), another safety system, during the 2010s, per a Federal Railroad Administration (FRA) mandate that all American railroads have it by the end of 2018.[src] The Newark–World Trade Center line west of Journal Square was converted to PTC in April 2018, followed by the segments of track east of Journal Square the following month.[src] This caused delays across the entire system when train operators had to slow down and manually adjust their trains to switch between the two signaling systems.[src] PTC was tested on the Uptown Hudson Tubes from July to October 2018, forcing weekend closures.[src] PTC was finished in November 2018, a month ahead of schedule; and the entire system was converted by December.[src] The Port Authority also installed two amenities in all PATH stations.[src] Cellphone service was added for all customers by early 2019.[src] Countdown clocks, displaying the time the next train arrives, were installed in all PATH stations that year.[src] Subsequently, in June 2019, the Port Authority released the PATH Improvement Plan, calling for over $1 billion in investments, including $80 million to extend Newark–World Trade Center line platforms, as well as funding for two ongoing projects: $752.6 million to complete the CBTC system by 2022 and $215.7 million on the new PA5 cars by 2022.[src] The goal is to increase train frequencies on the Newark–World Trade Center line by 40 percent, and 20 percent on other lines, during rush hours.[src] Every train on the Newark–World Trade Center line would be nine cars long.[src] In addition, the platform at Grove Street would be extended eastward, at the Marin Boulevard end of the station, and two additional cross-corridors would be added at Exchange Place.[src] The Port Authority would also allocate funds to study the implementation of 10-car trains.[src] In September 2019, service on the Newark–World Trade Center and Journal Square–33rd Street lines would be increased by 10 percent during rush hours, reducing the headway between trains from four minutes to three.[src] ====2020s==== In 2019, the last year before the onset of the COVID-19 pandemic, the PATH carried an average of 284,000 people per day.[src] The second quarter of 2020, which included the nadir of the pandemic across the New York metropolitan area, was the worst quarter in PATH's history, with a $777 million decline in revenues throughout all of the PANYNJ's facility and a specific ridership decline of 94 percent on the PATH system.[src] Train service returned to 96 percent of 2019 levels in June 2020, yet ridership continued to lag far below pre-pandemic numbers, rebounding to only 60 percent of 2019 ridership by February 2022.[src] Amid the spread of the Omicron variant, PANYNJ was projected to reach $3 billion in pandemic losses by March 2022.[src] The platform-lengthening project was finished the same year.[src] In February 2023, it was announced that nine-car operation on the Newark–World Trade Center line would begin the next month; nine-car trains began operating on March 22, 2023.[src] PANYNJ commissioners voted in late 2023 to spend $230 million replacing some wheel sets on the PA5 fleet and replacing tracks on the New Jersey side.[src] In 2024, the PANYNJ announced that it would spend $430 million to refurbish four stations and replace railroad switches as part of the PATH Forward program.[src] In addition, the agency announced that the Hoboken Terminal station would be closed and extensively refurbished during February 2025.[src] As part of its 2026–2035 capital plan, the PANYNJ announced in November 2025 that it would increase weekend service, with all four weekday lines running during the weekend, and that fares would incrementally increase annually from $2.90 to $4.00 by 2029.[src] In 2026, the PANYNJ announced that it would replace turnstiles at all PATH stations for $3.5 million.[src] The PATH Forward improvements were completed in late April 2026.[src] The weekend service changes took effect on May 17, 2026.[src] ====Newark Airport extension proposals==== In the mid-2000s, a Newark Airport extension was considered as the Port Authority allocated $31 million for a feasibility study of extending service from Newark Penn Station, estimated at that time to cost $500 million; the study began in 2012.[src] In September 2013, Crain's reported that New Jersey Governor Chris Christie would publicly support the extension, estimated by then to cost $1 billion.[src] The governor asked that the airport's largest operator, United Airlines, consider flying to Atlantic City International Airport as an enticement to further the project.[src] In February 2014, the Port Authority's Board of Commissioners approved a 10-year capital plan that included the PATH extension to NJ Transit's Newark Liberty International Airport Station.[src] The alignment would follow the existing Northeast Corridor approximately one mile (1.6 km) further south to the Newark Airport station, where a connection to AirTrain Newark is available.[src] Five years of construction were expected to begin in 2018.[src] In late 2014, there were calls for a reconsideration of Port Authority funding priorities.[src] The PATH extension followed the route of existing Manhattan-to-Newark Airport train service (on NJ Transit's Northeast Corridor Line and North Jersey Coast Line as well as Amtrak's Keystone Service and Northeast Regional).[src] On the other hand, there was no funding for either the Gateway Tunnel, a pair of commuter train tunnels that would supplement the North River Tunnels under the Hudson, or the replacement for the Port Authority Bus Terminal.[src] In December 2014, the PANYNJ awarded a three-year, $6 million contract to infrastructure design firm HNTB to do a cost analysis of the Newark Airport extension.[src] In 2017, the PANYNJ released a 10-year capital plan that included $1.7 billion for the extension; at the time, construction was projected to start in 2020, with service in 2025.[src] A presentation at two December 2017 public meetings showed the new PATH station would include a park-and-ride lot and a new entrance from the nearby Dayton neighborhood.[src] An extension of the PATH to Newark Airport was still being considered in mid-2022, but the PANYNJ announced in March 2023 that it was deferring funding for the Newark Airport extension to a future capital plan.[src] In December 2025, the PANYNJ announced that the Newark Airport PATH extension would be delayed by ten years because the agency was prioritizing the ongoing replacement of the AirTrain Newark.[src] ====Marion station proposal==== West of Journal Square in Jersey City, the NWK-WTC line runs through the Marion Section parallel to the Conrail Passaic and Harsimus Line freight line.[src] A pedestrian bridge crosses the tracks.[src] Since the 1980s, there have been calls for an infill station to be built there.[src] In 2018, the government of Jersey City and the PANYNJ reached an agreement that included a feasibility study for a potential station, which resulted in the "Marion PATH Station Physical Feasibility Study".[src] The senior U.S.[src] Senator, the Hudson County Executive, and the Mayor of Jersey City have written letters encouraging the PANYNJ to continue with the project.[src] The estimated cost of construction varies and could be funded by nearby real estate developers.[src] == Route operation == PATH operates 24 hours a day, seven days a week.[src] During the daytime, PATH operates four train services, direct descendants of the four original services operated by the H&M, using three terminals in New Jersey and two in Manhattan.[src] During late nights and weekend mornings, PATH operates two services from two terminals in New Jersey and two in Manhattan.[src] Each line is represented by a unique color on timetables and service maps, which also corresponds to the color of the marker lights on the front of trains.[src] The Journal Square–33rd Street (via Hoboken) service is the only line represented by two colors (yellow and blue), since it is a late-night/weekend/holiday combination of PATH's two midtown services, Journal Square–33rd Street and Hoboken–33rd Street.[src] During peak hours, trains operate every four to eight minutes on each service.[src] Every PATH station except Newark and Harrison is served by a train every two to three minutes, for a peak-hour service of 20–30 trains per hour.[src] According to the American Public Transportation Association, in , the system saw rides, or about per weekday in , making it the fifth-busiest rapid transit system in the United States.[src] , PATH saw 57.25 million passengers.[src] , the system is used by over 186,000 passengers per weekday; almost 105,000 per Saturday; almost 79,000 per Sunday; and nearly 98,000 per holiday.[src] The busiest station is World Trade Center, with more than 13.3 million riders, while the least busy station is 9th Street, with 1.19 million riders.[src] These levels of ridership notwithstanding, PATH runs at a deficit, losing about $400 million per year.[src] While some of its recent improvements, particularly in Harrison, have spurred local development, it cannot benefit from that directly as the Port Authority is limited to the revenue it makes from the fees, fares, and tolls it collects, with the state and local governments collecting the sales, income and property taxes arising from development.[src] Its costs are correspondingly increased by having to comply with FRA regulations.[src] PATH is thus subsidized by the Port Authority from surpluses at its airports and seaports.[src] File:PATH daytime.png|Map of the PATH system (regular service) File:PATH afterhours.png|Map of the PATH system (late-night hours) File:PATH to scale.svg|To-scale map of the PATH system All New Jersey stations, as well as the World Trade Center and 33rd Street terminals in New York, are compliant with the Americans with Disabilities Act of 1990.[src] Harrison, the last non-accessible station in New Jersey, was made fully accessible in 2019.[src] The only non-accessible stations are the four intermediate stations on the Manhattan side of the Uptown Tubes–Christopher Street, Ninth Street, 14th Street, and 23rd Street.[src]
137 sentences · 137 cited inline · 0 references stored
References
No reference rows published for this article.
Cite this article
MLA
"PATH (rail system)." encyclopegia.org, 2026, https://encyclopegia.org/wiki/path-rail-system. Accessed 28 November 2026.
Chicago
"PATH (rail system)." encyclopegia.org. Accessed November 28, 2026. https://encyclopegia.org/wiki/path-rail-system.
APA
encyclopegia.org. (2026). PATH (rail system). Retrieved November 28, 2026, from https://encyclopegia.org/wiki/path-rail-system
Accessed November 28, 2026 · CC BY-SA 4.0 · citation page · JSON
Claims
| Predicate | Value | Source |
|---|---|---|
| release date | 2022 | Wikipedia |
| area | 94 percent | Wikipedia |
| release date | 2020 | Wikipedia |