Schedule delay
In transport modelling, schedule delay is the difference between a desired time of arrival or departure and the actual time.[src] Despite the use of "delay", it can be a difference in either the early or late direction.[src] The most common example is that of having a fixed work start time: if someone starts work at 0900 but actually arrives at 0850, they are incurring a schedule delay of 10 minutes.[src] Alternative examples might include public transport - if a bus is scheduled to depart from a stop at 20-minute intervals (e.g.[src] 0800, 0820, 0840) and a person wishes to begin their journey between those intervals (e.g.[src] at 0815), they incur a schedule delay through having to retime their departure from the desired 0815 point to the bus departure time of 0820.[src] Schedule delay can be measured as a utility (or, rather, a disutility).[src] The Small model of scheduling has the disutility of schedule delay decrease linearly towards zero as the actual arrival (or departure) time approaches the desired time.[src] The disutility of schedule delay for a late arrival or departure also increase linearly, but Small hypothesises that there can also be a fixed penalty component of schedule delay on the "late" side - e.g.[src] arriving late for work is always bad, even if it is only slightly late.[src]
In transport modelling, schedule delay is the difference between a desired time of arrival or departure and the actual time.[src] Despite the use of "delay", it can be a difference in either the early or late direction.[src] The most common example is that of having a fixed work start time: if someone starts work at 0900 but actually arrives at 0850, they are incurring a schedule delay of 10 minutes.[src] Alternative examples might include public transport - if a bus is scheduled to depart from a stop at 20-minute intervals (e.g.[src] 0800, 0820, 0840) and a person wishes to begin their journey between those intervals (e.g.[src] at 0815), they incur a schedule delay through having to retime their departure from the desired 0815 point to the bus departure time of 0820.[src] Schedule delay can be measured as a utility (or, rather, a disutility).[src] The Small model of scheduling has the disutility of schedule delay decrease linearly towards zero as the actual arrival (or departure) time approaches the desired time.[src] The disutility of schedule delay for a late arrival or departure also increase linearly, but Small hypothesises that there can also be a fixed penalty component of schedule delay on the "late" side - e.g.[src] arriving late for work is always bad, even if it is only slightly late.[src]
20 sentences · 20 cited inline · 0 references stored
References
No reference rows published for this article.
Cite this article
MLA
"Schedule delay." encyclopegia.org, 2025, https://encyclopegia.org/wiki/schedule-delay. Accessed 25 November 2026.
Chicago
"Schedule delay." encyclopegia.org. Accessed November 25, 2026. https://encyclopegia.org/wiki/schedule-delay.
APA
encyclopegia.org. (2025). Schedule delay. Retrieved November 25, 2026, from https://encyclopegia.org/wiki/schedule-delay
Accessed November 25, 2026 · CC BY-SA 4.0 · citation page · JSON