encyclopegia.org

Shuttle-Centaur

Shuttle-Centaur was a version of the Centaur upper stage rocket designed to be carried aloft inside the Space Shuttle and used to launch satellites into high Earth orbits or probes into deep space.[src] Two variants were developed: Centaur G-Prime, which was planned to launch the Galileo and Ulysses robotic probes to Jupiter, and Centaur G, a shortened version planned for use with United States Department of Defense Milstar satellites and the Magellan Venus probe.[src] The powerful Centaur upper stage allowed for heavier deep space probes, and for them to reach Jupiter sooner, prolonging the operational life of the spacecraft.[src] However, neither variant ever flew on a Shuttle.[src] Support for the project came from the United States Air Force (USAF) and the National Reconnaissance Office, which asserted that its classified satellites required the power of Centaur.[src] The USAF agreed to pay half the design and development costs of Centaur G, and the National Aeronautics and Space Administration (NASA) paid the other half.[src] Both versions were cradled in the reusable Centaur integrated support system (CISS), an aluminum structure that handled communications between the Space Shuttle and the Centaur.[src] All Centaur stages periodically vented hydrogen, which needs to be stored below to keep it from boiling.…[src]

Shuttle-Centaur was a version of the Centaur upper stage rocket designed to be carried aloft inside the Space Shuttle and used to launch satellites into high Earth orbits or probes into deep space.[src] Two variants were developed: Centaur G-Prime, which was planned to launch the Galileo and Ulysses robotic probes to Jupiter, and Centaur G, a shortened version planned for use with United States Department of Defense Milstar satellites and the Magellan Venus probe.[src] The powerful Centaur upper stage allowed for heavier deep space probes, and for them to reach Jupiter sooner, prolonging the operational life of the spacecraft.[src] However, neither variant ever flew on a Shuttle.[src] Support for the project came from the United States Air Force (USAF) and the National Reconnaissance Office, which asserted that its classified satellites required the power of Centaur.[src] The USAF agreed to pay half the design and development costs of Centaur G, and the National Aeronautics and Space Administration (NASA) paid the other half.[src] Both versions were cradled in the reusable Centaur integrated support system (CISS), an aluminum structure that handled communications between the Space Shuttle and the Centaur.[src] All Centaur stages periodically vented hydrogen, which needs to be stored below to keep it from boiling.[src] Two Shuttle-Centaur missions were scheduled, with one-hour launch windows six days apart, so two separate spacecraft and launch pads were required.[src] The Space Shuttles and were modified to carry the CISS.[src] The Space Shuttle main engines would have been run at 109 percent of the rated power level (with regular Shuttle flights using 104%, possible thanks to margins that were found after development concluded).[src] The payloads needed to be deployed on the first day in orbit, so the missions would be flown by four-person crews composed of astronauts who had already flown in space and were known to not suffer from space adaptation syndrome.[src] The first Centaur G-Prime was rolled out from the General Dynamics factory in Kearny Mesa, San Diego, on 13 August 1985.[src] Just months before the Shuttle-Centaur was scheduled to fly, the Challenger disaster occurred, and the project was canceled.[src] The Galileo and Ulysses probes were ultimately launched using the much less powerful solid-fueled Inertial Upper Stage (IUS), Galileo needing multiple gravitational assists from Venus and Earth to reach Jupiter.[src] The USAF mated a variant of the Centaur G-Prime upper stage with its Titan rocket to produce the Titan IV, which made its first flight in 1994.[src] Over the next 18 years, Titan IV and Centaur G-Prime placed eighteen military satellites in orbit.[src]

25 sentences · 25 cited inline · 0 references stored

References

No reference rows published for this article.

Cite this article

MLA

"Shuttle-Centaur." encyclopegia.org, 2025, https://encyclopegia.org/wiki/shuttle-centaur. Accessed 27 November 2026.

Chicago

"Shuttle-Centaur." encyclopegia.org. Accessed November 27, 2026. https://encyclopegia.org/wiki/shuttle-centaur.

APA

encyclopegia.org. (2025). Shuttle-Centaur. Retrieved November 27, 2026, from https://encyclopegia.org/wiki/shuttle-centaur

Accessed November 27, 2026 · CC BY-SA 4.0 · citation page · JSON

Related articles

centaur

stub · references available

shuttle roller coaster

stub · references available

Honda Shuttle

stub · references available

New Shuttle

stub · references available

malate-aspartate shuttle

stub · references available

Shuttle-C

stub · references available

Space Shuttle orbiter

stub · references available

Space Shuttle Orbital Maneuvering System

stub · references available
CC BY-SA 4.0 · share-alike · https://en.wikipedia.org/w/index.php?oldid=1310136092 · 0.5 · snapshot enwiki-001310136092

Cite · JSON · Search

Related services and records

Services

  • Estate — measured countries, lanes and facts
  • Intel — live corroborated events
  • Legal — statutes, cases and citations
  • Encyclopedia — articles with inline sources
  • Space — launches, satellites and orbits
  • Search — federated search and reports
  • Pass — passport account and SSO
  • Corpora — read-only corpus origins
  • e01 — self-hosted corpora and tools
  • Careers — open roles: frontier engineers and sales partners

Text and metadata only; each target carries its own sources. Missing data is published as no-data, never estimated.