Solel
Solel Solar Systems Ltd.[src] ( ) was an Israeli solar thermal equipment designer and manufacturer based in Beit Shemesh, Israel.[src] Solel made equipment for solar thermal power plants, facilities that used the sun's heat to create steam and turn an electricity generator.[src] testing site In 2007, Solel signed a contract with Pacific Gas & Electric to supply 553 MW from its planned Mojave Solar Park, California.[src] The parabolic trough project was cancelled in 2011.[src] In a joint venture with the Spanish Valoriza Energía, Solel planned a parabolic-trough plant in Spain.[src] After three years of construction, one of originally three 50-MW units started operation in December 2011.[src] In October 2009, Siemens signed a $418-million contract to buy Solel Solar Systems.[src] As part of the deal, Siemens committed itself to leave the company headquarters and some of its manufacturing facilities in Israel for at least five years.[src] Three years later, in an environment of plunging prices for photovoltaic power generation, Siemens announced plans to sell off the subsidiary, without success.[src] In 2013, Siemens gave up its solar business.[src]
Solel Solar Systems Ltd.[src] ( ) was an Israeli solar thermal equipment designer and manufacturer based in Beit Shemesh, Israel.[src] Solel made equipment for solar thermal power plants, facilities that used the sun's heat to create steam and turn an electricity generator.[src] testing site]] In 2007, Solel signed a contract with Pacific Gas & Electric to supply 553 MW from its planned Mojave Solar Park, California.[src] The parabolic trough project was cancelled in 2011.[src] In a joint venture with the Spanish Valoriza Energía, Solel planned a parabolic-trough plant in Spain.[src] After three years of construction, one of originally three 50-MW units started operation in December 2011.[src] In October 2009, Siemens signed a $418-million contract to buy Solel Solar Systems.[src] As part of the deal, Siemens committed itself to leave the company headquarters and some of its manufacturing facilities in Israel for at least five years.[src] Three years later, in an environment of plunging prices for photovoltaic power generation, Siemens announced plans to sell off the subsidiary, without success.[src] In 2013, Siemens gave up its solar business.[src] ==See also== Solar power in Israel ==References==[src]
23 sentences · 23 cited inline · 0 references stored
References
No reference rows published for this article.
Cite this article
MLA
"Solel." encyclopegia.org, 2026, https://encyclopegia.org/wiki/solel. Accessed 27 November 2026.
Chicago
"Solel." encyclopegia.org. Accessed November 27, 2026. https://encyclopegia.org/wiki/solel.
APA
encyclopegia.org. (2026). Solel. Retrieved November 27, 2026, from https://encyclopegia.org/wiki/solel
Accessed November 27, 2026 · CC BY-SA 4.0 · citation page · JSON