encyclopegia.org

Stadthaus

Stadthaus is a nine-storey residential building in Hackney, London, completed in 2009.[src] With nine stories (30 meters/98 feet), it was considered the second tallest timber residential building made of wood in the world at the time of its construction, after the Forte apartment complex in Melbourne, Australia.[src] It was designed in collaboration between architects Waugh Thistleton, structural engineers Techniker, and timber panel manufacturer KLH.[src] Stadthaus is the first high-density housing building to be built from pre-fabricated cross-laminated timber panels.[src] It is the first building in the world of this height to construct not only load-bearing walls and floor slabs but also stair and lift cores entirely from timber.[src] The record was later broken by Mjøstårnet in 2019 and the Ascent MKE high-rise apartment-building in 2022.[src]

Stadthaus is a nine-storey residential building in Hackney, London, completed in 2009.[src] With nine stories (30 meters/98 feet), it was considered the second tallest timber residential building made of wood in the world at the time of its construction, after the Forte apartment complex in Melbourne, Australia.[src] It was designed in collaboration between architects Waugh Thistleton, structural engineers Techniker, and timber panel manufacturer KLH.[src] Stadthaus is the first high-density housing building to be built from pre-fabricated cross-laminated timber panels.[src] It is the first building in the world of this height to construct not only load-bearing walls and floor slabs but also stair and lift cores entirely from timber.[src] The record was later broken by Mjøstårnet in 2019 and the Ascent MKE high-rise apartment-building in 2022.[src] ==Ecological aspects== Timber stores 0.8t of carbon dioxide within 1 cubic metre and is a replenishable material.[src] In comparison, the production of both concrete and steel are one-way energy intensive processes that release large amounts of carbon dioxide into the atmosphere.[src] The panels can also be easily demounted and used as an energy source at the end of the building’s life.[src] So the case for timber was made to the client and London Borough of Hackney's planning department both in terms of the environmental consideration and potential economies to cost and programme.[src] ==Design approach== The form of the design was predetermined by a number of factors.[src] Previous architects had received two planning refusals on the site and as a result the acceptable parameters for the building’s approval were clearly defined.[src] The site area is 17m x 17m and bound on all sides by other residential buildings.[src] An extrusion of the site area set the building’s plan form and the height at nine stories was set as a maximum, before overshadowing would become an issue.[src] The Metropolitan Housing Trust required that a separate ground floor entrance be provided for the affordable units.[src] This resulted in a mirrored floor plan from east to west, with an identical entrance to each aspect.[src] Both tenures are served by an individual staircase and lift.[src] The five upper stories are designated for private sale and the three lower stories for social housing.[src] The majority of social housing is made up of family apartments which overlook the play area to the rear of the building.[src] Telford Homes specifically required that the interiors were consistent with a standard developer specification, which means that inside the apartments feel completely conventional, belying the revolutionary nature of their structure.[src] According to the architects, the colour scheme of the exterior façade was inspired by Gerhard Richter’s painting Les gris entre ciel et mer du nord.[src] ===Construction method=== The building was assembled using a structural cross-laminated timber panel system.[src] The timber panels are produced in Austria by KLH using Spruce planks glued together with a non-toxic adhesive.[src] The waste timber is converted to fuel powering both the factory and local village.[src] Each panel is prefabricated including cut-outs for windows and doors and routed service channels.[src] As the panels arrived on site they were immediately craned into position and fixed in place.[src] Four carpenters assembled the eight-story structure in twenty-seven days.[src] The speed of the construction in such a densely populated environment is especially relevant, as was the lack of noise and waste, creating far less intrusion on the local community than a traditional concrete frame construction.[src] A ‘platform construction’ configuration is used throughout this structure.[src] Each floor is set on the walls below, and then another story of walls is raised and so on up the building.[src] Joints are secured with screws and angle plates.[src] Stresses are generally very low throughout the structure and at points where cross-grain pressures are high, screws have been added to reinforce the timber locally.[src] Progressive collapse is avoided by providing sufficient redundancy so that any single elements can be removed.[src] Designing a building constructed from load bearing panels creates a number of opportunities.[src] Any internal wall can become a party wall and have a significant portion removed from the surface area as openings.[src] This simple flexibility allowed for different plan types up and down the building and an animated façade where windows were placed according to the best advantage.[src] Typically a new technology in construction provides a reduced volume of building material; lighter weights produce cheaper faster buildings.[src] The impression of solidity once inside this building is evident, the interior spaces and the acoustic they give off affirm a sense of place and home.[src] Traditional trades and methods followed on once the structure of each floor was complete.[src] The enthusiasm of the work force for the construction and the ease of the build was a benefit beyond anticipation.[src] The building was completed in 49 weeks, estimated to be a saving of five months over a notional concrete frame construction and occupied ahead of programme in January 2009.[src] ===Sustainability=== Using a bulk timber panel system affects the carbon footprint of the building in three ways.[src] Firstly, the production of cement produces 237 kg of carbon per tonne.[src] The project's sustainability expert estimates that if this building were to be a concrete structure, it would contain approximately 950 cubic metres of concrete.[src] This would require 285 tonnes of cement and would, therefore, produce approximately 67,500 kg of carbon.[src] Additionally, the production of steel produces 477 kg of carbon per tonne.[src] It is estimated that the building would, if built in reinforced concrete, require about 120 tonnes of steel, the production of which would have generated 57,250 kg of carbon.[src] 901 cubic metres of timber have been used within the building.[src] Timber absorbs carbon throughout its natural life and continues to store that carbon when cut.[src] The fabric of Stadthaus stores over 186,000 kg of carbon.[src] Thus, the chosen construction method has resulted in a reduction in the carbon load of the building of 67,500 + 57,250 + 186,000 = 310,750 kg of carbon.[src] This is equivalent to over 310 tonnes of carbon.[src] The estimated carbon dioxide produced in the generation of the energy for the building, including the transportation of the timber panels from Austria, is 10,000 kg/c/yr.[src] This has been entirely offset by the building’s carbon saving for some 21 years.[src] ===Building high in timber=== Concerns associated with timber buildings are predominantly related to acoustics and fire protection.[src] Timber buildings are classified as poor in terms of their acoustic performance due to the light structure as compared to reinforced concrete and masonry.[src] However, cross-laminated solid timber panels have a significantly higher density than timber frame buildings.[src] They provide a solid structural core on which different, independent and separating layers can be added.[src] The layer principal overcomes any acoustic or sound transfer issues.[src] In Stadthaus an economic layering strategy of stud walls, floating floor build-ups and suspended ceilings, gave sound attenuation far in excess of building regulations (58 - 60db).[src] In a fire, a solid wall of timber benefits from the protection of a charred layer and therefore does not combust in the same way as a single stud.[src] In Stadthaus, five-layer cross-laminated timber panels are used to obtain a fire protection that allows the structure to retain its integrity for at least 90 minutes.[src] This is significantly longer than steel, which fails and buckles at high temperatures.[src] The 90 minutes at Stadthaus have been achieved with the plasterboard finish – two layers of plasterboard provide 60 minutes with the final 30 minutes achieved by the calculation of charring rate of the KLH solid timber panels.[src] Calculations by the project engineers however show that in fact the KLH panels comfortably achieve a 60-minute fire resistance period with the panel thicknesses used for this project so the design team has been slightly modest.[src] Regulations in Europe have meant there are no precedents for Stadthaus.[src] However, architectural and engineering methods in timber construction pioneered by Waugh Thistleton and Techniker are now accepted internationally.[src] By gaining the necessary certificates from both NHBC and Building Research Establishment, both of which treated Stadthaus as a pilot scheme, the design team considers that timber panels are the building material of an environmentally conscious future.[src] ==See also== Sutyagin House - 44m private residence in northern Russia demolished in 2009 ==References== ==External links== Murray Grove, the original Timbre Tower KLJ UK Limited Techniker ==Further reading== Lynne Blundell: “Timber: complex, sustainable and good in bushfires“, The Fifth Estate, January 2010[src]

75 sentences · 75 cited inline · 0 references stored

References

No reference rows published for this article.

Cite this article

MLA

"Stadthaus." encyclopegia.org, 2026, https://encyclopegia.org/wiki/stadthaus. Accessed 28 November 2026.

Chicago

"Stadthaus." encyclopegia.org. Accessed November 28, 2026. https://encyclopegia.org/wiki/stadthaus.

APA

encyclopegia.org. (2026). Stadthaus. Retrieved November 28, 2026, from https://encyclopegia.org/wiki/stadthaus

Accessed November 28, 2026 · CC BY-SA 4.0 · citation page · JSON

Claims

PredicateValueSource
area17mWikipedia
CC BY-SA 4.0 · tier1-factual · https://en.wikipedia.org/w/index.php?oldid=1345072750 · 0.55 · snapshot stadthaus-182366-b91c9795cc460120 · QID Q1562138

Cite · JSON · Search

Related services and records

Services

  • Estate — measured countries, lanes and facts
  • Intel — live corroborated events
  • Legal — statutes, cases and citations
  • Encyclopedia — articles with inline sources
  • Space — launches, satellites and orbits
  • Search — federated search and reports
  • Pass — passport account and SSO
  • Corpora — read-only corpus origins
  • e01 — self-hosted corpora and tools
  • Careers — open roles: frontier engineers and sales partners
  • Index — every corpus, paper and record
  • Estate guide — what a public data estate is
  • Founder — Lois-Kleinner Alpasan
  • Records — DOIs and external deposits
  • Documents — one-pagers, PDFs and QR codes
  • Brand kit — logos and share images
  • Papers — plain-language briefs with citations
  • Browser — search engine, PWA and bookmarklet
  • Anticloud — the operator and its projects

As seen in Business Insider · 336 outlets · evidence DOIs · plain-language papers

Text and metadata only; each target carries its own sources. Missing data is published as no-data, never estimated.