Summit Bridge
The Summit Bridge carries Delaware Routes 71 and 896 across the Chesapeake & Delaware Canal.[src] The bridge also carries Delaware Bicycle Route 1, a bicycle route that spans the length of the state of Delaware, across the canal.[src] The Summit Bridge opened to traffic on January 9, 1960, replacing a lift bridge.[src] Before the bridge opened to traffic, a dedication ceremony was held, with U.S.[src] Senator J.[src] Allen Frear Jr.[src] in attendance.[src] The Summit Bridge was the second four-lane high-level crossing in Delaware and was designed to carry an eventual US 301 freeway, however that planned freeway was never built on the alignment utilizing the Summit Bridge.[src] US 301 did use the bridge when it was routed along surface roads from 1961 to 2019, at which time it was rerouted onto a new toll freeway.[src] The current bridge replaces a former swing span structure that was demolished when the U.S.[src] Army Corps of Engineers rerouted the canal to a new sea-level channel south of Lums Pond State Park.[src] A construction project on the approaches to the bridge was completed in Fall of 2012.[src]
The Summit Bridge carries Delaware Routes 71 and 896 across the Chesapeake & Delaware Canal.[src] The bridge also carries Delaware Bicycle Route 1, a bicycle route that spans the length of the state of Delaware, across the canal.[src] The Summit Bridge opened to traffic on January 9, 1960, replacing a lift bridge.[src] Before the bridge opened to traffic, a dedication ceremony was held, with U.S.[src] Senator J.[src] Allen Frear Jr.[src] in attendance.[src] The Summit Bridge was the second four-lane high-level crossing in Delaware and was designed to carry an eventual US 301 freeway, however that planned freeway was never built on the alignment utilizing the Summit Bridge.[src] US 301 did use the bridge when it was routed along surface roads from 1961 to 2019, at which time it was rerouted onto a new toll freeway.[src] The current bridge replaces a former swing span structure that was demolished when the U.S.[src] Army Corps of Engineers rerouted the canal to a new sea-level channel south of Lums Pond State Park.[src] A construction project on the approaches to the bridge was completed in Fall of 2012.[src] ==See also== List of crossings of the Chesapeake & Delaware Canal ==References== ==External links==[src]
25 sentences · 25 cited inline · 0 references stored
References
No reference rows published for this article.
Cite this article
MLA
"Summit Bridge." encyclopegia.org, 2026, https://encyclopegia.org/wiki/summit-bridge. Accessed 27 November 2026.
Chicago
"Summit Bridge." encyclopegia.org. Accessed November 27, 2026. https://encyclopegia.org/wiki/summit-bridge.
APA
encyclopegia.org. (2026). Summit Bridge. Retrieved November 27, 2026, from https://encyclopegia.org/wiki/summit-bridge
Accessed November 27, 2026 · CC BY-SA 4.0 · citation page · JSON