Surveyor program
The Surveyor program was a NASA program that, from June 1966 through January 1968, sent seven robotic spacecraft to the surface of the Moon. Its primary goal was to demonstrate the feasibility of soft landings on the Moon. The Surveyor craft were the first American spacecraft to achieve soft landing on an extraterrestrial body. The missions called for the craft to travel directly to the Moon on an impact trajectory, a journey that lasted 63 to 65 hours, and ended with a deceleration of just over three minutes to a soft landing. The program was implemented by NASA's Jet Propulsion Laboratory (JPL) to prepare for the Apollo program, and started in 1960. JPL selected Hughes Aircraft in 1961 to develop the spacecraft system. The total cost of the Surveyor program was officially $469 million. Five of the Surveyor craft successfully soft-landed on the Moon, including the first one. The other two failed: Surveyor 2 crashed at high velocity after a failed mid-course correction, and Surveyor 4 lost contact (possibly exploding) 2.5 minutes before its scheduled touch-down. All seven spacecraft are still on the Moon; none of the missions included returning them to Earth. Some parts of Surveyor 3 were returned to Earth by the crew of Apollo 12, which landed near it in 1969. The camera from this craft is on display at the National Air and Space Museum in Washington, DC.
The Surveyor program was a NASA program that, from June 1966 through January 1968, sent seven robotic spacecraft to the surface of the Moon. Its primary goal was to demonstrate the feasibility of soft landings on the Moon. The Surveyor craft were the first American spacecraft to achieve soft landing on an extraterrestrial body. The missions called for the craft to travel directly to the Moon on an impact trajectory, a journey that lasted 63 to 65 hours, and ended with a deceleration of just over three minutes to a soft landing. The program was implemented by NASA's Jet Propulsion Laboratory (JPL) to prepare for the Apollo program, and started in 1960. JPL selected Hughes Aircraft in 1961 to develop the spacecraft system. The total cost of the Surveyor program was officially $469 million. Five of the Surveyor craft successfully soft-landed on the Moon, including the first one. The other two failed: Surveyor 2 crashed at high velocity after a failed mid-course correction, and Surveyor 4 lost contact (possibly exploding) 2.5 minutes before its scheduled touch-down. All seven spacecraft are still on the Moon; none of the missions included returning them to Earth. Some parts of Surveyor 3 were returned to Earth by the crew of Apollo 12, which landed near it in 1969. The camera from this craft is on display at the National Air and Space Museum in Washington, DC. ==See also== Atlas (rocket family) Luna programme Lunar Orbiter program Ranger program Exploration of the Moon List of missions to the Moon ==External links== Surveyor (1966–1968) Surveyor Program Results (PDF) 1969 Surveyor Program Results (Good Quality Color PDF) 1969 Analysis of Surveyor 3 material and photographs returned by Apollo 12 (PDF) 1972 Exploring the Moon: The Surveyor Program Details of Surveyor 1 launch, and also the entire program Digitizing the Surveyor Lander Imaging Dataset | Lunar and Planetary Laboratory & Department of Planetary Sciences | The University of Arizona
References
No reference rows published for this article.
Cite this article
MLA
"Surveyor program." encyclopegia.org, 2026, https://encyclopegia.org/wiki/surveyor-program. Accessed 24 November 2026.
Chicago
"Surveyor program." encyclopegia.org. Accessed November 24, 2026. https://encyclopegia.org/wiki/surveyor-program.
APA
encyclopegia.org. (2026). Surveyor program. Retrieved November 24, 2026, from https://encyclopegia.org/wiki/surveyor-program
Accessed November 24, 2026 · CC BY-SA 4.0 · citation page · JSON