Terafab
Terafab is a planned semiconductor fabrication plant jointly developed by Tesla, SpaceX, and Intel.[src] The venture was announced by Elon Musk on March 21, 2026, and centers on the construction of a vertically integrated large-scale facility designed to produce more than one terawatt (one trillion watts) of artificial intelligence (AI) compute capacity per year.[src] It aims to produce integrated circuits, memory modules and multi-chip modules under one roof by consolidating every stage of the semiconductor device production process, including chip design, fabrication, memory production, advanced packaging, and testing.[src] Initial prototype fab operations are to be focused in Austin, Texas, in proximity to Tesla's existing Gigafactory Texas, with a permanent plant planned for Grimes County, Texas on the site of a former electric generating plant.[src] County filings in May 2026 discussed an initial outlay of about US$55 billion and as much as $119 billion across all phases of the Grimes County facility.[src] In August 2026 Tesla and SpaceX said they would invest about $16.8 billion in a first phase at that site.[src]
Terafab is a planned semiconductor fabrication plant jointly developed by Tesla, SpaceX, and Intel.[src] The venture was announced by Elon Musk on March 21, 2026, and centers on the construction of a vertically integrated large-scale facility designed to produce more than one terawatt (one trillion watts) of artificial intelligence (AI) compute capacity per year.[src] It aims to produce integrated circuits, memory modules and multi-chip modules under one roof by consolidating every stage of the semiconductor device production process, including chip design, fabrication, memory production, advanced packaging, and testing.[src] Initial prototype fab operations are to be focused in Austin, Texas, in proximity to Tesla's existing Gigafactory Texas, with a permanent plant planned for Grimes County, Texas on the site of a former electric generating plant.[src] County filings in May 2026 discussed an initial outlay of about US$55 billion and as much as $119 billion across all phases of the Grimes County facility.[src] In August 2026 Tesla and SpaceX said they would invest about $16.8 billion in a first phase at that site.[src] ==References==[src]
13 sentences · 13 cited inline · 0 references stored
References
No reference rows published for this article.
Cite this article
MLA
"Terafab." encyclopegia.org, 2026, https://encyclopegia.org/wiki/terafab. Accessed 28 November 2026.
Chicago
"Terafab." encyclopegia.org. Accessed November 28, 2026. https://encyclopegia.org/wiki/terafab.
APA
encyclopegia.org. (2026). Terafab. Retrieved November 28, 2026, from https://encyclopegia.org/wiki/terafab
Accessed November 28, 2026 · CC BY-SA 4.0 · citation page · JSON