Use case points
Use case points (UCP or UCPs) is a software estimation technique used to forecast the software size for software development projects.[src] UCP is used when the Unified Modeling Language (UML) and Rational Unified Process (RUP) methodologies are being used for the software design and development.[src] The concept of UCP is based on the requirements for the system being written using use cases, which is part of the UML set of modeling techniques.[src] The software size (UCP) is calculated based on elements of the system use cases with factoring to account for technical and environmental considerations.[src] The UCP for a project can then be used to calculate the estimated effort for a project.[src]
Use case points (UCP or UCPs) is a software estimation technique used to forecast the software size for software development projects.[src] UCP is used when the Unified Modeling Language (UML) and Rational Unified Process (RUP) methodologies are being used for the software design and development.[src] The concept of UCP is based on the requirements for the system being written using use cases, which is part of the UML set of modeling techniques.[src] The software size (UCP) is calculated based on elements of the system use cases with factoring to account for technical and environmental considerations.[src] The UCP for a project can then be used to calculate the estimated effort for a project.[src] UUCW = (Total No.[src] of Simple Use Cases x 5) + (Total No.[src] Average Use Cases x 10) + (Total No.[src] Complex Use Cases x 15) UAW = (Total No.[src] of Simple actors x 1) + (Total No.[src] Average actors x 2) + (Total No.[src] Complex actors x 3) TCF = 0.6 + (TF/100) ECF = 1.4 + (-0.03 x EF) UCP = (UUCW + UAW) x TCF x ECF UUCW = (Total No.[src] of Simple Use Cases x 5) + (Total No.[src] Average Use Cases x 10) + (Total No.[src] Complex Use Cases x 15) For the Online Shopping System, the UUCW = (2 x 5) + (3 x 10) + (4 x 15) = 100 UUCW = 100 UAW = (Total No.[src] of Simple Actors x 1) + (Total No.[src] Average Actors x 2) + (Total No.[src] Complex Actors x 3) For the Online Shopping System, UAW = (1 x 1) + (0 x 2) + (4 x 3) = 13 UAW = 13 TCF = 0.6 + (TF/100) For the Online Shopping System, TCF = 0.6 + (42/100) = 1.02 TCF = 1.02 ECF = 1.4 + (-0.03 x EF) For the Online Shopping System, ECF = 1.4 + (-0.03 * 10.5) = 1.085 ECF = 1.085 UCP = (UUCW + UAW) x TCF x ECF For the Online Shopping System, UCP = (100 + 13) x 1.02 x 1.085 = 125.06 UCP = 125.06 For the Online Shopping System, the total estimated size to develop the software is 125.06 Use Case Points.[src] Now that the size of the project is known, the total effort for the project can be estimated.[src] For the Online Shopping System example, 28 man hours per use case point will be used.[src] Estimated Effort = UCP x Hours/UCP For the Online Shopping System, Estimated Effort = 125.06 x 28 Estimated Effort = 3501 Hours ==References== ==External links== Advantages of Function Point Analysis in relation to Use Case Points Use Case Points - An Estimation Approach Estimating Software Via Use Cases Improving Consistency of Use Case Points Estimates Clemmons, Roy K.[src] “Project Estimation With Use Case Points.” CrossTalk Feb.[src] 2006[src]
28 sentences · 28 cited inline · 0 references stored
References
No reference rows published for this article.
Cite this article
MLA
"Use case points." encyclopegia.org, 2025, https://encyclopegia.org/wiki/use-case-points. Accessed 28 November 2026.
Chicago
"Use case points." encyclopegia.org. Accessed November 28, 2026. https://encyclopegia.org/wiki/use-case-points.
APA
encyclopegia.org. (2025). Use case points. Retrieved November 28, 2026, from https://encyclopegia.org/wiki/use-case-points
Accessed November 28, 2026 · CC BY-SA 4.0 · citation page · JSON