utilization factor
The utilization factor or use factor is the ratio of the time that a piece of equipment is in use to the total time that it could be in use. It is often averaged over time in the definition such that the ratio becomes the amount of energy used divided by the maximum possible to be used. These definitions are equivalent. The term is used in engineering such as mining, including areas of electrical engineering, such as photovoltaics.
The utilization factor or use factor is the ratio of the time that a piece of equipment is in use to the total time that it could be in use. It is often averaged over time in the definition such that the ratio becomes the amount of energy used divided by the maximum possible to be used. These definitions are equivalent. The term is used in engineering such as mining, including areas of electrical engineering, such as photovoltaics. For example, an oversized motor - 15 kW - drives a constant 12 kW load whenever it is on. The motor load factor is then 12/15 = 80%. The motor above may only be used for eight hours a day, 50 weeks a year. The hours of operation would then be 2800 hours, and the motor use factor for a base of 8760 hours per year would be 2800/8760 = 31.96%. With a base of 2800 hours per year, the motor use factor would be 100%.
References
- Advance rate simulation for hard rock TBMs · retrieved 2026-11-18 · rev 1337012568
Cite this reference
MLA "Advance rate simulation for hard rock TBMs." Rostami, Jamal; Farrokh, Ebrahim; Laughton, Chris; Eslambolchi, S. 2026-11-18. https://doi.org/10.1007%2Fs12205-014-0058-5. Accessed 24 November 2026.
Chicago "Advance rate simulation for hard rock TBMs." Rostami, Jamal; Farrokh, Ebrahim; Laughton, Chris; Eslambolchi, S. 2026-11-18. https://doi.org/10.1007%2Fs12205-014-0058-5.
APA Rostami, Jamal; Farrokh, Ebrahim; Laughton, Chris; Eslambolchi, S. (2026). Advance rate simulation for hard rock TBMs. Retrieved November 24, 2026, from https://doi.org/10.1007%2Fs12205-014-0058-5
- Review, analysis and improving the utilization factor of a PV-grid connected system via HERIC transformerless approach · retrieved 2026-11-18 · rev 1337012568
Cite this reference
MLA "Review, analysis and improving the utilization factor of a PV-grid connected system via HERIC transformerless approach." Zaid, S. 2026-11-18. http://dx.doi.org/10.1016/j.rser.2017.02.025. Accessed 24 November 2026.
Chicago "Review, analysis and improving the utilization factor of a PV-grid connected system via HERIC transformerless approach." Zaid, S. 2026-11-18. http://dx.doi.org/10.1016/j.rser.2017.02.025.
APA Zaid, S. (2026). Review, analysis and improving the utilization factor of a PV-grid connected system via HERIC transformerless approach. Retrieved November 24, 2026, from http://dx.doi.org/10.1016/j.rser.2017.02.025
Cite this article
MLA
"utilization factor." encyclopegia.org, 2026, https://encyclopegia.org/wiki/utilization-factor. Accessed 24 November 2026.
Chicago
"utilization factor." encyclopegia.org. Accessed November 24, 2026. https://encyclopegia.org/wiki/utilization-factor.
APA
encyclopegia.org. (2026). utilization factor. Retrieved November 24, 2026, from https://encyclopegia.org/wiki/utilization-factor
Accessed November 24, 2026 · CC BY-SA 4.0 · citation page · JSON