Vineyard Wind
Vineyard Wind 1 is an offshore wind energy project located about south off the coast of Martha's Vineyard, Massachusetts, United States.[src] Vineyard Wind 1 features 62 fixed-bottom wind turbines, with a combined nameplate capacity of 804MW.[src] At peak production, this provides energy equivalent of powering 400,000 homes.[src] The turbines used are manufactured by GE Offshore Wind, each capable of generating up to 13MW.[src] The $4 billion project was developed by Copenhagen Infrastructure Partners in partnership with Iberdrola and aimed to contribute substantially to Massachusetts' renewable energy targets while reducing carbon emissions.[src] The Massachusetts Department of Public Utilities approved the project in 2019, and construction began in November 2021.[src] Power from the first turbine started flowing into the ISO New England grid in January 2024.[src] The onshore cable landing sites is an onshore substation in Hyannis village, positioned next to the existing Eversource substation.[src] Construction of the wind farm was completed when the final wind turbine blades were installed on March 13, 2026.[src] Construction was paused in late December 2025 due to a Trump administration order to pause all offshore wind leases to review "national security risks".[src] A preliminary court injunction in January 2026 allowed construction to resume while the lawsuit proceeded.[src]
Vineyard Wind 1 is an offshore wind energy project located about south off the coast of Martha's Vineyard, Massachusetts, United States.[src] Vineyard Wind 1 features 62 fixed-bottom wind turbines, with a combined nameplate capacity of 804MW.[src] At peak production, this provides energy equivalent of powering 400,000 homes.[src] The turbines used are manufactured by GE Offshore Wind, each capable of generating up to 13MW.[src] The $4 billion project was developed by Copenhagen Infrastructure Partners in partnership with Iberdrola and aimed to contribute substantially to Massachusetts' renewable energy targets while reducing carbon emissions.[src] The Massachusetts Department of Public Utilities approved the project in 2019, and construction began in November 2021.[src] Power from the first turbine started flowing into the ISO New England grid in January 2024.[src] The onshore cable landing sites is an onshore substation in Hyannis village, positioned next to the existing Eversource substation.[src] Construction of the wind farm was completed when the final wind turbine blades were installed on March 13, 2026.[src] Construction was paused in late December 2025 due to a Trump administration order to pause all offshore wind leases to review "national security risks".[src] A preliminary court injunction in January 2026 allowed construction to resume while the lawsuit proceeded.[src]
22 sentences · 22 cited inline · 0 references stored
References
No reference rows published for this article.
Cite this article
MLA
"Vineyard Wind." encyclopegia.org, 2026, https://encyclopegia.org/wiki/vineyard-wind. Accessed 28 November 2026.
Chicago
"Vineyard Wind." encyclopegia.org. Accessed November 28, 2026. https://encyclopegia.org/wiki/vineyard-wind.
APA
encyclopegia.org. (2026). Vineyard Wind. Retrieved November 28, 2026, from https://encyclopegia.org/wiki/vineyard-wind
Accessed November 28, 2026 · CC BY-SA 4.0 · citation page · JSON