Lesson plan
A9 dualling project
The A9 dualling project is an ongoing infrastructure project in Scotland to upgrade the A9 between Perth and Inverness from a single carriageway to a dual carriageway. A dual carriageway allows drivers to overtake safely, as they do not have to meet oncoming traffic; and the crash barriers on the central reservation greatly reduce the frequency of head-on collisions. As most of the A9 is currently a single carriageway, drivers may have to overtake heavy goods vehicles (HGVs) and other slow-moving vehicles as they are limited to , lower than the speed limit for cars and motorcycles. The A9 has been dubbed Scotland's most dangerous road. In 2022, there were 17 fatalities, its highest level in 20 years before falling to four in 2023. The project was announced in 2011 in response to the safety concerns with overtaking and head-on collisions. Construction started in 2015 starting with a section between Kincraig and Dalraddy (near Aviemore) followed by the Luncarty to Pass of Birnam in 2019. This project was originally due to finish in 2025, but has since been delayed to 2035. , two out of eleven sections have been completed, totalling 11 miles (17 km), leaving 77 miles (124 km) to be upgraded. The sections between Tomatin and Moy, as well as between Tay Crossing and Ballinluig are under construction as of November 2025. Both sections are due to be finished in 2028.
Article summary
The A9 dualling project is an ongoing infrastructure project in Scotland to upgrade the A9 between Perth and Inverness from a single carriageway to a dual carriageway. A dual carriageway allows drivers to overtake safely, as they do not have to meet oncoming traffic; and the crash barriers on the central reservation greatly reduce the frequency of head-on collisions. As most of the A9 is currently a single carriageway, drivers may have to overtake heavy goods vehicles (HGVs) and other slow-moving vehicles as they are limited to , lower than the speed limit for cars and motorcycles. The A9 has been dubbed Scotland's most dangerous road. In 2022, there were 17 fatalities, its highest level in 20 years before falling to four in 2023. The project was announced in 2011 in response to the safety concerns with overtaking and head-on collisions. Construction started in 2015 starting with a section between Kincraig and Dalraddy (near Aviemore) followed by the Luncarty to Pass of Birnam in 2019. This project was originally due to finish in 2025, but has since been delayed to 2035. , two out of eleven sections have been completed, totalling 11 miles (17 km), leaving 77 miles (124 km) to be upgraded. The sections between Tomatin and Moy, as well as between Tay Crossing and Ballinluig are under construction as of November 2025. Both sections are due to be finished in 2028.
Key claims
No claims recorded.
Discussion questions
- Summarise the article in your own words. Which single claim would you verify first, and why?
- Which claim in this article is most likely to be revised as the sources update? How would you check its current status?
- If two sources disagreed about one of these facts, what would you need in order to trust one over the other?
Bibliography
No sources recorded.
Key claims and bibliography are generated from the same tracked claims and sources as the article page.