Nemo Link is a 1,000 MW HVDC submarine power cable between Richborough Energy Park in Kent, the United Kingdom and Zeebrugge, Belgium. The project is a joint venture between British National Grid and Belgian Elia. The 400 kV electrical interconnector is the first between the two countries, with an annual transmission capacity of 8.76 TWh . The link has been fully operational since 31 January 2019, and has transported 29 TWh during its first 5 years; 24.75 TWh to the UK and 4.25 to Belgium with an availability above 99%.

Back to article

Article summary

Nemo Link is a 1,000 MW HVDC submarine power cable between Richborough Energy Park in Kent, the United Kingdom and Zeebrugge, Belgium. The project is a joint venture between British National Grid and Belgian Elia. The 400 kV electrical interconnector is the first between the two countries, with an annual transmission capacity of 8.76 TWh . The link has been fully operational since 31 January 2019, and has transported 29 TWh during its first 5 years; 24.75 TWh to the UK and 4.25 to Belgium with an availability above 99%.

Key claims

No claims recorded.

Discussion questions

  1. Summarise the article in your own words. Which single claim would you verify first, and why?
  2. Which claim in this article is most likely to be revised as the sources update? How would you check its current status?
  3. If two sources disagreed about one of these facts, what would you need in order to trust one over the other?

Bibliography

No sources recorded.

Key claims and bibliography are generated from the same tracked claims and sources as the article page.