A work-breakdown structure (WBS) in project management and systems engineering is a breakdown of a project into smaller components. It is a key project management element that organizes the team's work into manageable sections. The Project Management Body of Knowledge defines the work-breakdown structure as a "hierarchical decomposition of the total scope of work to be carried out by the project team to accomplish the project objectives and create the required deliverables." A WBS provides the necessary framework for detailed cost estimation and control while providing guidance for schedule development and control.

A work-breakdown structure (WBS) in project management and systems engineering is a breakdown of a project into smaller components. It is a key project management element that organizes the team's work into manageable sections. The Project Management Body of Knowledge defines the work-breakdown structure as a "hierarchical decomposition of the total scope of work to be carried out by the project team to accomplish the project objectives and create the required deliverables." A WBS provides the necessary framework for detailed cost estimation and control while providing guidance for schedule development and control. ===Types=== PMI's Practice Standard for Work Breakdown Structures identifies two major types of work breakdown structures. ====Deliverable-oriented WBS==== Deliverable-oriented WBS, also known as Product breakdown structure uses key deliverables to group each work in the project. ====Phase-oriented WBS==== Phase-oriented WBS groups the work under key phases or stages of project lifecycle. The document has been revised several times. As of May 2023, the most recent revision is F, released 13 May 2022. The version history and current revision of the standard are posted on the Defense Logistics Agency (DLA) ASSIST web site.It includes WBS definitions for specific defense materiel commodity systems and addresses WBS elements that are common to all systems. Defense Materiel Item categories from MIL-STD-881F are: Aircraft Systems Electronic/Generic Systems Missile/Ordnance Systems Strategic Missile Systems Sea Systems Space Systems Ground Vehicle Systems Unmanned Maritime Systems Launch Vehicle Systems Information Systems/Defense Business Systems The common elements identified in MIL-STD-881F, Appendix K are: Integration, assembly, test, and checkout; Systems engineering; Program management; System test and evaluation; Data; Peculiar support equipment; Common support equipment; Operational/Site activation; Contractor Logistics Support; Industrial facilities; Initial spares and repair parts. The standard also includes additional common elements unique to Space Systems, Launch Vehicle Systems, and Strategic Missile Systems. In 1987, the Project Management Institute (PMI) documented expanding these techniques across non-defense organizations. The Project Management Body of Knowledge (PMBOK) Guide provides an overview of the WBS concept, while the "Practice Standard for Work Breakdown Structures" is comparable to the DoD standard but is intended for more general application. ==Design principles== ===Plan outcomes, not actions=== If the work breakdown structure designer attempts to capture any action-oriented details in the WBS, the designer will likely include either too many actions or too few actions. Too many actions will exceed 100% of the parent's scope, and too few will fall short of 100% of the parent's scope. The best way to adhere to the 100% rule is to define WBS elements in terms of outcomes or results, not actions. This also ensures that the WBS is not overly prescriptive of methods, allowing for greater ingenuity and creative thinking on the part of the project participants. When a project provides professional services, a common technique is to capture all planned deliverables to create a deliverable-oriented WBS. Work breakdown structures that subdivide work by project phases (e.g. preliminary design phase, critical design phase) must ensure that phases are clearly separated by a deliverable also used in defining entry and exit criteria (e.g., an approved preliminary or critical design review). ====Product breakdown structure (PBS)==== For new product development projects, the most common technique to ensure an outcome-oriented WBS is to use a product breakdown structure (PBS). ====Feature-driven development==== Feature-driven software projects may use a similar technique as the WBS, which is to use a feature breakdown structure. ====Coding scheme==== It is common for work breakdown structure elements to be numbered sequentially to reveal the hierarchical structure. The purpose of the numbering is to provide a consistent approach to identifying and managing the WBS across like systems regardless of vendor or service. For example, 1.1.2 Propulsion (in the example below) identifies this item as a Level 3 WBS element, since there are three numbers separated by two decimal points. A coding scheme also helps WBS elements to be recognized in any written context, such as progress tracking, scheduling, or billing, and allows for mapping to the WBS Dictionary. It is a preferred practice that the Statement of work or other contract descriptive include the same section terms and hierarchical structure as the WBS. A practical example of the WBS coding scheme is 1.0 Aircraft System 1.1 Air Vehicle 1.1.1 Airframe 1.1.1.1 Airframe Integration, Assembly, Test, and Checkout 1.1.1.2 Fuselage 1.1.1.3 Wing 1.1.1.4 Empennage 1.1.1.5 Nacelle 1.1.1.6 Other Airframe Components 1..n (Specify) 1.1.2 Propulsion 1.1.3 Vehicle Subsystems 1.1.4 Avionics 1.2 System Engineering 1.3 Program Management 1.4 System Test and Evaluation 1.5 Training 1.6 Data 1.7 Peculiar Support Equipment 1.8 Common Support Equipment 1.9 Operational/Site Activation 1.10 Industrial Facilities 1.11 Initial Spares and Repair Parts ==References== [http://quicksearch.dla.mil/qsDocDetails.aspx?ident_number=36026 ASSIST entry for MIL-HDBK-881C Defense Acquisition University ACQ101 Summary for Work Breakdown Structures How to Make a Work Breakdown Structure NASA Work Breakdown Structure Handbook, NASA/SP-2010-3404, January 2010

References

  1. A guide to project management body of knowledge (Sixth ed.). Project Management Institute, Inc. 2017. p. 715. ISBN 978-1-62825-184-5 . Wikipedia revision 1361649699, retrieved 2026-11-20 · retrieved 2026-11-19 · rev 1361649699
    Cite this reference

    MLA "A guide to project management body of knowledge (Sixth ed.). Project Management Institute, Inc. 2017. p. 715. ISBN 978-1-62825-184-5 . Wikipedia revision 1361649699, retrieved 2026-11-20." A guide to project management body of knowledge (Sixth ed. 2026-11-19. https://en.wikipedia.org/wiki/ISBN_(identifier). Accessed 25 November 2026.

    Chicago "A guide to project management body of knowledge (Sixth ed.). Project Management Institute, Inc. 2017. p. 715. ISBN 978-1-62825-184-5 . Wikipedia revision 1361649699, retrieved 2026-11-20." A guide to project management body of knowledge (Sixth ed. 2026-11-19. https://en.wikipedia.org/wiki/ISBN_(identifier).

    APA A guide to project management body of knowledge (Sixth ed. (2026). A guide to project management body of knowledge (Sixth ed.). Project Management Institute, Inc. 2017. p. 715. ISBN 978-1-62825-184-5 . Wikipedia revision 1361649699, retrieved 2026-11-20. Retrieved November 25, 2026, from https://en.wikipedia.org/wiki/ISBN_(identifier)

  2. Rita, Mulcahy (2018). PMP Exam prep (Ninth ed.). RMC publications. p. 88. ISBN 978-1-943704-04-0 . Wikipedia revision 1361649699, retrieved 2026-11-20 · retrieved 2026-11-19 · rev 1361649699
    Cite this reference

    MLA "Rita, Mulcahy (2018). PMP Exam prep (Ninth ed.). RMC publications. p. 88. ISBN 978-1-943704-04-0 . Wikipedia revision 1361649699, retrieved 2026-11-20." Rita, Mulcahy (2018). 2026-11-19. https://en.wikipedia.org/wiki/ISBN_(identifier). Accessed 25 November 2026.

    Chicago "Rita, Mulcahy (2018). PMP Exam prep (Ninth ed.). RMC publications. p. 88. ISBN 978-1-943704-04-0 . Wikipedia revision 1361649699, retrieved 2026-11-20." Rita, Mulcahy (2018). 2026-11-19. https://en.wikipedia.org/wiki/ISBN_(identifier).

    APA Rita, Mulcahy (2018). (2026). Rita, Mulcahy (2018). PMP Exam prep (Ninth ed.). RMC publications. p. 88. ISBN 978-1-943704-04-0 . Wikipedia revision 1361649699, retrieved 2026-11-20. Retrieved November 25, 2026, from https://en.wikipedia.org/wiki/ISBN_(identifier)

  3. Community Guide of the PMI-ACP Adaptive Planning · retrieved 2026-11-19 · rev 1361649699
    Cite this reference

    MLA "Community Guide of the PMI-ACP Adaptive Planning." 2026-11-19. https://www.projectmanagement.com/wikis/295452/Progressive-Elaboration. Accessed 25 November 2026.

    Chicago "Community Guide of the PMI-ACP Adaptive Planning." 2026-11-19. https://www.projectmanagement.com/wikis/295452/Progressive-Elaboration.

    APA encyclopegia.org. (2026). Community Guide of the PMI-ACP Adaptive Planning. Retrieved November 25, 2026, from https://www.projectmanagement.com/wikis/295452/Progressive-Elaboration

  4. Earned Value Project Management · retrieved 2026-11-19 · rev 1361649699
    Cite this reference

    MLA "Earned Value Project Management." Fleming, Quentin W. 2026-11-19. http://www.crosstalkonline.org/storage/issue-archives/1998/199807/199807-0-Issue.pdf. Accessed 25 November 2026.

    Chicago "Earned Value Project Management." Fleming, Quentin W. 2026-11-19. http://www.crosstalkonline.org/storage/issue-archives/1998/199807/199807-0-Issue.pdf.

    APA Fleming, Quentin W. (2026). Earned Value Project Management. Retrieved November 25, 2026, from http://www.crosstalkonline.org/storage/issue-archives/1998/199807/199807-0-Issue.pdf

  5. Haugan, Gregory T., Effective Work Breakdown Structures, pp7-8 Wikipedia revision 1361649699, retrieved 2026-11-20 · retrieved 2026-11-19 · rev 1361649699
    Cite this reference

    MLA "Haugan, Gregory T., Effective Work Breakdown Structures, pp7-8 Wikipedia revision 1361649699, retrieved 2026-11-20." Haugan, Gregory T. 2026-11-19. https://en.wikipedia.org/w/index.php?oldid=1361649699. Accessed 25 November 2026.

    Chicago "Haugan, Gregory T., Effective Work Breakdown Structures, pp7-8 Wikipedia revision 1361649699, retrieved 2026-11-20." Haugan, Gregory T. 2026-11-19. https://en.wikipedia.org/w/index.php?oldid=1361649699.

    APA Haugan, Gregory T. (2026). Haugan, Gregory T., Effective Work Breakdown Structures, pp7-8 Wikipedia revision 1361649699, retrieved 2026-11-20. Retrieved November 25, 2026, from https://en.wikipedia.org/w/index.php?oldid=1361649699

  6. DOD and NASA Guide, PERT/COST System Design, June 1962 Wikipedia revision 1361649699, retrieved 2026-11-20 · retrieved 2026-11-19 · rev 1361649699
    Cite this reference

    MLA "DOD and NASA Guide, PERT/COST System Design, June 1962 Wikipedia revision 1361649699, retrieved 2026-11-20." 2026-11-19. https://en.wikipedia.org/w/index.php?oldid=1361649699. Accessed 25 November 2026.

    Chicago "DOD and NASA Guide, PERT/COST System Design, June 1962 Wikipedia revision 1361649699, retrieved 2026-11-20." 2026-11-19. https://en.wikipedia.org/w/index.php?oldid=1361649699.

    APA encyclopegia.org. (2026). DOD and NASA Guide, PERT/COST System Design, June 1962 Wikipedia revision 1361649699, retrieved 2026-11-20. Retrieved November 25, 2026, from https://en.wikipedia.org/w/index.php?oldid=1361649699

  7. Hamilton, R. L., Study of Methods for Evaluation of the PERT/Cost Management System , MITRE Corporation , June 1964 Wikipedia revision 1361649699, retrieved 2026-11-20 · retrieved 2026-11-19 · rev 1361649699
    Cite this reference

    MLA "Hamilton, R. L., Study of Methods for Evaluation of the PERT/Cost Management System , MITRE Corporation , June 1964 Wikipedia revision 1361649699, retrieved 2026-11-20." Hamilton, R. 2026-11-19. https://web.archive.org/web/20110604181820/http://handle.dtic.mil/100.2/AD603425. Accessed 25 November 2026.

    Chicago "Hamilton, R. L., Study of Methods for Evaluation of the PERT/Cost Management System , MITRE Corporation , June 1964 Wikipedia revision 1361649699, retrieved 2026-11-20." Hamilton, R. 2026-11-19. https://web.archive.org/web/20110604181820/http://handle.dtic.mil/100.2/AD603425.

    APA Hamilton, R. (2026). Hamilton, R. L., Study of Methods for Evaluation of the PERT/Cost Management System , MITRE Corporation , June 1964 Wikipedia revision 1361649699, retrieved 2026-11-20. Retrieved November 25, 2026, from https://web.archive.org/web/20110604181820/http://handle.dtic.mil/100.2/AD603425

  8. MIL-STD-881, 1 November 1968 Wikipedia revision 1361649699, retrieved 2026-11-20 · retrieved 2026-11-19 · rev 1361649699
    Cite this reference

    MLA "MIL-STD-881, 1 November 1968 Wikipedia revision 1361649699, retrieved 2026-11-20." 2026-11-19. https://en.wikipedia.org/w/index.php?oldid=1361649699. Accessed 25 November 2026.

    Chicago "MIL-STD-881, 1 November 1968 Wikipedia revision 1361649699, retrieved 2026-11-20." 2026-11-19. https://en.wikipedia.org/w/index.php?oldid=1361649699.

    APA encyclopegia.org. (2026). MIL-STD-881, 1 November 1968 Wikipedia revision 1361649699, retrieved 2026-11-20. Retrieved November 25, 2026, from https://en.wikipedia.org/w/index.php?oldid=1361649699

  9. Haugan, Gregory T., The Work Breakdown Structure in Government Contracting, Management Concepts, 2003 ISBN 978-1567261202 Wikipedia revision 1361649699, retrieved 2026-11-20 · retrieved 2026-11-19 · rev 1361649699
    Cite this reference

    MLA "Haugan, Gregory T., The Work Breakdown Structure in Government Contracting, Management Concepts, 2003 ISBN 978-1567261202 Wikipedia revision 1361649699, retrieved 2026-11-20." Haugan, Gregory T. 2026-11-19. https://en.wikipedia.org/wiki/ISBN_(identifier). Accessed 25 November 2026.

    Chicago "Haugan, Gregory T., The Work Breakdown Structure in Government Contracting, Management Concepts, 2003 ISBN 978-1567261202 Wikipedia revision 1361649699, retrieved 2026-11-20." Haugan, Gregory T. 2026-11-19. https://en.wikipedia.org/wiki/ISBN_(identifier).

    APA Haugan, Gregory T. (2026). Haugan, Gregory T., The Work Breakdown Structure in Government Contracting, Management Concepts, 2003 ISBN 978-1567261202 Wikipedia revision 1361649699, retrieved 2026-11-20. Retrieved November 25, 2026, from https://en.wikipedia.org/wiki/ISBN_(identifier)

  10. Effective Work Breakdown Structures By Gregory T. Haugan, Published by Management Concepts, 2001, ISBN 1567261353 , p.17 Wikipedia revision 1361649699, retrieved 2026-11-20 · retrieved 2026-11-19 · rev 1361649699
    Cite this reference

    MLA "Effective Work Breakdown Structures By Gregory T. Haugan, Published by Management Concepts, 2001, ISBN 1567261353 , p.17 Wikipedia revision 1361649699, retrieved 2026-11-20." Effective Work Breakdown Structures By Gregory T. 2026-11-19. https://en.wikipedia.org/wiki/ISBN_(identifier). Accessed 25 November 2026.

    Chicago "Effective Work Breakdown Structures By Gregory T. Haugan, Published by Management Concepts, 2001, ISBN 1567261353 , p.17 Wikipedia revision 1361649699, retrieved 2026-11-20." Effective Work Breakdown Structures By Gregory T. 2026-11-19. https://en.wikipedia.org/wiki/ISBN_(identifier).

    APA Effective Work Breakdown Structures By Gregory T. (2026). Effective Work Breakdown Structures By Gregory T. Haugan, Published by Management Concepts, 2001, ISBN 1567261353 , p.17 Wikipedia revision 1361649699, retrieved 2026-11-20. Retrieved November 25, 2026, from https://en.wikipedia.org/wiki/ISBN_(identifier)

  11. Glossary of Defense Acquisition Acronyms and Terms: Contract Work Breakdown Structure (CWBS) · retrieved 2026-11-19 · rev 1361649699
    Cite this reference

    MLA "Glossary of Defense Acquisition Acronyms and Terms: Contract Work Breakdown Structure (CWBS)." 2026-11-19. https://web.archive.org/web/20161019141035/https://dap.dau.mil/glossary/pages/1637.aspx. Accessed 25 November 2026.

    Chicago "Glossary of Defense Acquisition Acronyms and Terms: Contract Work Breakdown Structure (CWBS)." 2026-11-19. https://web.archive.org/web/20161019141035/https://dap.dau.mil/glossary/pages/1637.aspx.

    APA encyclopegia.org. (2026). Glossary of Defense Acquisition Acronyms and Terms: Contract Work Breakdown Structure (CWBS). Retrieved November 25, 2026, from https://web.archive.org/web/20161019141035/https://dap.dau.mil/glossary/pages/1637.aspx

  12. Practice Standard for Work Breakdown Structures (Second Edition) , published by the Project Management Institute , ISBN 1933890134 , page 8 Wikipedia revision 1361649699, retrieved 2026-11-20 · retrieved 2026-11-19 · rev 1361649699
    Cite this reference

    MLA "Practice Standard for Work Breakdown Structures (Second Edition) , published by the Project Management Institute , ISBN 1933890134 , page 8 Wikipedia revision 1361649699, retrieved 2026-11-20." Practice Standard for Work Breakdown Structures (Second Edition) , published by the Project Management Institute , ISBN. 2026-11-19. https://en.wikipedia.org/wiki/Project_Management_Institute. Accessed 25 November 2026.

    Chicago "Practice Standard for Work Breakdown Structures (Second Edition) , published by the Project Management Institute , ISBN 1933890134 , page 8 Wikipedia revision 1361649699, retrieved 2026-11-20." Practice Standard for Work Breakdown Structures (Second Edition) , published by the Project Management Institute , ISBN. 2026-11-19. https://en.wikipedia.org/wiki/Project_Management_Institute.

    APA Practice Standard for Work Breakdown Structures (Second Edition) , published by the Project Management Institute , ISBN. (2026). Practice Standard for Work Breakdown Structures (Second Edition) , published by the Project Management Institute , ISBN 1933890134 , page 8 Wikipedia revision 1361649699, retrieved 2026-11-20. Retrieved November 25, 2026, from https://en.wikipedia.org/wiki/Project_Management_Institute

  13. Swiderski, Mark A., PMP workbreakdownstructure.com , PMBOK-Work Breakdown Structures. Accessed 16. June 2013. Wikipedia revision 1361649699, retrieved 2026-11-20 · retrieved 2026-11-19 · rev 1361649699
    Cite this reference

    MLA "Swiderski, Mark A., PMP workbreakdownstructure.com , PMBOK-Work Breakdown Structures. Accessed 16. June 2013. Wikipedia revision 1361649699, retrieved 2026-11-20." Swiderski, Mark A. 2026-11-19. https://www.workbreakdownstructure.com/work-breakdown-structure-according-to-pmbok.php. Accessed 25 November 2026.

    Chicago "Swiderski, Mark A., PMP workbreakdownstructure.com , PMBOK-Work Breakdown Structures. Accessed 16. June 2013. Wikipedia revision 1361649699, retrieved 2026-11-20." Swiderski, Mark A. 2026-11-19. https://www.workbreakdownstructure.com/work-breakdown-structure-according-to-pmbok.php.

    APA Swiderski, Mark A. (2026). Swiderski, Mark A., PMP workbreakdownstructure.com , PMBOK-Work Breakdown Structures. Accessed 16. June 2013. Wikipedia revision 1361649699, retrieved 2026-11-20. Retrieved November 25, 2026, from https://www.workbreakdownstructure.com/work-breakdown-structure-according-to-pmbok.php

  14. MIL-STD-881C, Work Breakdown Structures for Defense Materiel Items, 3 October 2011, ¶4.3 Wikipedia revision 1361649699, retrieved 2026-11-20 · retrieved 2026-11-19 · rev 1361649699
    Cite this reference

    MLA "MIL-STD-881C, Work Breakdown Structures for Defense Materiel Items, 3 October 2011, ¶4.3 Wikipedia revision 1361649699, retrieved 2026-11-20." MIL-STD-881C, Work Breakdown Structures for Defense Materiel Items, 3 October 2011, ¶4. 2026-11-19. https://en.wikipedia.org/w/index.php?oldid=1361649699. Accessed 25 November 2026.

    Chicago "MIL-STD-881C, Work Breakdown Structures for Defense Materiel Items, 3 October 2011, ¶4.3 Wikipedia revision 1361649699, retrieved 2026-11-20." MIL-STD-881C, Work Breakdown Structures for Defense Materiel Items, 3 October 2011, ¶4. 2026-11-19. https://en.wikipedia.org/w/index.php?oldid=1361649699.

    APA MIL-STD-881C, Work Breakdown Structures for Defense Materiel Items, 3 October 2011, ¶4. (2026). MIL-STD-881C, Work Breakdown Structures for Defense Materiel Items, 3 October 2011, ¶4.3 Wikipedia revision 1361649699, retrieved 2026-11-20. Retrieved November 25, 2026, from https://en.wikipedia.org/w/index.php?oldid=1361649699

  15. MIL-STD-881C, Work Breakdown Structures for Defense Materiel Items, 3 October 2011 Appendix A, ¶A.3 Wikipedia revision 1361649699, retrieved 2026-11-20 · retrieved 2026-11-19 · rev 1361649699
    Cite this reference

    MLA "MIL-STD-881C, Work Breakdown Structures for Defense Materiel Items, 3 October 2011 Appendix A, ¶A.3 Wikipedia revision 1361649699, retrieved 2026-11-20." MIL-STD-881C, Work Breakdown Structures for Defense Materiel Items, 3 October 2011 Appendix A, ¶A. 2026-11-19. https://en.wikipedia.org/w/index.php?oldid=1361649699. Accessed 25 November 2026.

    Chicago "MIL-STD-881C, Work Breakdown Structures for Defense Materiel Items, 3 October 2011 Appendix A, ¶A.3 Wikipedia revision 1361649699, retrieved 2026-11-20." MIL-STD-881C, Work Breakdown Structures for Defense Materiel Items, 3 October 2011 Appendix A, ¶A. 2026-11-19. https://en.wikipedia.org/w/index.php?oldid=1361649699.

    APA MIL-STD-881C, Work Breakdown Structures for Defense Materiel Items, 3 October 2011 Appendix A, ¶A. (2026). MIL-STD-881C, Work Breakdown Structures for Defense Materiel Items, 3 October 2011 Appendix A, ¶A.3 Wikipedia revision 1361649699, retrieved 2026-11-20. Retrieved November 25, 2026, from https://en.wikipedia.org/w/index.php?oldid=1361649699

  16. MIL-STD-881C, Work Breakdown Structures for Defense Materiel Items, 3 October 2011, ¶3.1.4 Wikipedia revision 1361649699, retrieved 2026-11-20 · retrieved 2026-11-19 · rev 1361649699
    Cite this reference

    MLA "MIL-STD-881C, Work Breakdown Structures for Defense Materiel Items, 3 October 2011, ¶3.1.4 Wikipedia revision 1361649699, retrieved 2026-11-20." MIL-STD-881C, Work Breakdown Structures for Defense Materiel Items, 3 October 2011, ¶3. 2026-11-19. https://en.wikipedia.org/w/index.php?oldid=1361649699. Accessed 25 November 2026.

    Chicago "MIL-STD-881C, Work Breakdown Structures for Defense Materiel Items, 3 October 2011, ¶3.1.4 Wikipedia revision 1361649699, retrieved 2026-11-20." MIL-STD-881C, Work Breakdown Structures for Defense Materiel Items, 3 October 2011, ¶3. 2026-11-19. https://en.wikipedia.org/w/index.php?oldid=1361649699.

    APA MIL-STD-881C, Work Breakdown Structures for Defense Materiel Items, 3 October 2011, ¶3. (2026). MIL-STD-881C, Work Breakdown Structures for Defense Materiel Items, 3 October 2011, ¶3.1.4 Wikipedia revision 1361649699, retrieved 2026-11-20. Retrieved November 25, 2026, from https://en.wikipedia.org/w/index.php?oldid=1361649699

  17. MIL-STD-881C, Work Breakdown Structures for Defense Materiel Items, 3 October 2011, ¶1.4.1 Wikipedia revision 1361649699, retrieved 2026-11-20 · retrieved 2026-11-19 · rev 1361649699
    Cite this reference

    MLA "MIL-STD-881C, Work Breakdown Structures for Defense Materiel Items, 3 October 2011, ¶1.4.1 Wikipedia revision 1361649699, retrieved 2026-11-20." MIL-STD-881C, Work Breakdown Structures for Defense Materiel Items, 3 October 2011, ¶1. 2026-11-19. https://en.wikipedia.org/w/index.php?oldid=1361649699. Accessed 25 November 2026.

    Chicago "MIL-STD-881C, Work Breakdown Structures for Defense Materiel Items, 3 October 2011, ¶1.4.1 Wikipedia revision 1361649699, retrieved 2026-11-20." MIL-STD-881C, Work Breakdown Structures for Defense Materiel Items, 3 October 2011, ¶1. 2026-11-19. https://en.wikipedia.org/w/index.php?oldid=1361649699.

    APA MIL-STD-881C, Work Breakdown Structures for Defense Materiel Items, 3 October 2011, ¶1. (2026). MIL-STD-881C, Work Breakdown Structures for Defense Materiel Items, 3 October 2011, ¶1.4.1 Wikipedia revision 1361649699, retrieved 2026-11-20. Retrieved November 25, 2026, from https://en.wikipedia.org/w/index.php?oldid=1361649699

  18. MIL-STD-881C, Work Breakdown Structures for Defense Materiel Items, 3 October 2011, ¶2.2.4.2 Wikipedia revision 1361649699, retrieved 2026-11-20 · retrieved 2026-11-19 · rev 1361649699
    Cite this reference

    MLA "MIL-STD-881C, Work Breakdown Structures for Defense Materiel Items, 3 October 2011, ¶2.2.4.2 Wikipedia revision 1361649699, retrieved 2026-11-20." MIL-STD-881C, Work Breakdown Structures for Defense Materiel Items, 3 October 2011, ¶2. 2026-11-19. https://en.wikipedia.org/w/index.php?oldid=1361649699. Accessed 25 November 2026.

    Chicago "MIL-STD-881C, Work Breakdown Structures for Defense Materiel Items, 3 October 2011, ¶2.2.4.2 Wikipedia revision 1361649699, retrieved 2026-11-20." MIL-STD-881C, Work Breakdown Structures for Defense Materiel Items, 3 October 2011, ¶2. 2026-11-19. https://en.wikipedia.org/w/index.php?oldid=1361649699.

    APA MIL-STD-881C, Work Breakdown Structures for Defense Materiel Items, 3 October 2011, ¶2. (2026). MIL-STD-881C, Work Breakdown Structures for Defense Materiel Items, 3 October 2011, ¶2.2.4.2 Wikipedia revision 1361649699, retrieved 2026-11-20. Retrieved November 25, 2026, from https://en.wikipedia.org/w/index.php?oldid=1361649699

  19. MIL-STD-881C, Work Breakdown Structures for Defense Materiel Items, 3 October 2011, ¶Fig.3-6 Wikipedia revision 1361649699, retrieved 2026-11-20 · retrieved 2026-11-19 · rev 1361649699
    Cite this reference

    MLA "MIL-STD-881C, Work Breakdown Structures for Defense Materiel Items, 3 October 2011, ¶Fig.3-6 Wikipedia revision 1361649699, retrieved 2026-11-20." MIL-STD-881C, Work Breakdown Structures for Defense Materiel Items, 3 October 2011, ¶Fig. 2026-11-19. https://en.wikipedia.org/w/index.php?oldid=1361649699. Accessed 25 November 2026.

    Chicago "MIL-STD-881C, Work Breakdown Structures for Defense Materiel Items, 3 October 2011, ¶Fig.3-6 Wikipedia revision 1361649699, retrieved 2026-11-20." MIL-STD-881C, Work Breakdown Structures for Defense Materiel Items, 3 October 2011, ¶Fig. 2026-11-19. https://en.wikipedia.org/w/index.php?oldid=1361649699.

    APA MIL-STD-881C, Work Breakdown Structures for Defense Materiel Items, 3 October 2011, ¶Fig. (2026). MIL-STD-881C, Work Breakdown Structures for Defense Materiel Items, 3 October 2011, ¶Fig.3-6 Wikipedia revision 1361649699, retrieved 2026-11-20. Retrieved November 25, 2026, from https://en.wikipedia.org/w/index.php?oldid=1361649699

  20. MIL-STD-881C, Work Breakdown Structures for Defense Materiel Items, 3 October 2011, ¶Fig.3-1 Wikipedia revision 1361649699, retrieved 2026-11-20 · retrieved 2026-11-19 · rev 1361649699
    Cite this reference

    MLA "MIL-STD-881C, Work Breakdown Structures for Defense Materiel Items, 3 October 2011, ¶Fig.3-1 Wikipedia revision 1361649699, retrieved 2026-11-20." MIL-STD-881C, Work Breakdown Structures for Defense Materiel Items, 3 October 2011, ¶Fig. 2026-11-19. https://en.wikipedia.org/w/index.php?oldid=1361649699. Accessed 25 November 2026.

    Chicago "MIL-STD-881C, Work Breakdown Structures for Defense Materiel Items, 3 October 2011, ¶Fig.3-1 Wikipedia revision 1361649699, retrieved 2026-11-20." MIL-STD-881C, Work Breakdown Structures for Defense Materiel Items, 3 October 2011, ¶Fig. 2026-11-19. https://en.wikipedia.org/w/index.php?oldid=1361649699.

    APA MIL-STD-881C, Work Breakdown Structures for Defense Materiel Items, 3 October 2011, ¶Fig. (2026). MIL-STD-881C, Work Breakdown Structures for Defense Materiel Items, 3 October 2011, ¶Fig.3-1 Wikipedia revision 1361649699, retrieved 2026-11-20. Retrieved November 25, 2026, from https://en.wikipedia.org/w/index.php?oldid=1361649699

  21. MIL-STD-881C, Work Breakdown Structures for Defense Materiel Items, 3 October 2011, ¶Appendix E Wikipedia revision 1361649699, retrieved 2026-11-20 · retrieved 2026-11-19 · rev 1361649699
    Cite this reference

    MLA "MIL-STD-881C, Work Breakdown Structures for Defense Materiel Items, 3 October 2011, ¶Appendix E Wikipedia revision 1361649699, retrieved 2026-11-20." MIL-STD-881C, Work Breakdown Structures for Defense Materiel Items, 3 October 2011, ¶Appendix E Wikipedia revision 13616. 2026-11-19. https://en.wikipedia.org/w/index.php?oldid=1361649699. Accessed 25 November 2026.

    Chicago "MIL-STD-881C, Work Breakdown Structures for Defense Materiel Items, 3 October 2011, ¶Appendix E Wikipedia revision 1361649699, retrieved 2026-11-20." MIL-STD-881C, Work Breakdown Structures for Defense Materiel Items, 3 October 2011, ¶Appendix E Wikipedia revision 13616. 2026-11-19. https://en.wikipedia.org/w/index.php?oldid=1361649699.

    APA MIL-STD-881C, Work Breakdown Structures for Defense Materiel Items, 3 October 2011, ¶Appendix E Wikipedia revision 13616. (2026). MIL-STD-881C, Work Breakdown Structures for Defense Materiel Items, 3 October 2011, ¶Appendix E Wikipedia revision 1361649699, retrieved 2026-11-20. Retrieved November 25, 2026, from https://en.wikipedia.org/w/index.php?oldid=1361649699

  22. Gilmer, Thomas (1982-08-04). Introduction to Naval Architecture . Naval Institute Press. p. 98. ISBN 9780870213182 . Wikipedia revision 1361649699, retrieved 2026-11-20 · retrieved 2026-11-19 · rev 1361649699
    Cite this reference

    MLA "Gilmer, Thomas (1982-08-04). Introduction to Naval Architecture . Naval Institute Press. p. 98. ISBN 9780870213182 . Wikipedia revision 1361649699, retrieved 2026-11-20." Gilmer, Thomas (1982-08-04). 2026-11-19. https://books.google.com/books?id=_lF1DZ1OPJQC&q=%22work+breakdown+structure%22+wbs+navy+ship&pg=PA92. Accessed 25 November 2026.

    Chicago "Gilmer, Thomas (1982-08-04). Introduction to Naval Architecture . Naval Institute Press. p. 98. ISBN 9780870213182 . Wikipedia revision 1361649699, retrieved 2026-11-20." Gilmer, Thomas (1982-08-04). 2026-11-19. https://books.google.com/books?id=_lF1DZ1OPJQC&q=%22work+breakdown+structure%22+wbs+navy+ship&pg=PA92.

    APA Gilmer, Thomas (1982-08-04). (2026). Gilmer, Thomas (1982-08-04). Introduction to Naval Architecture . Naval Institute Press. p. 98. ISBN 9780870213182 . Wikipedia revision 1361649699, retrieved 2026-11-20. Retrieved November 25, 2026, from https://books.google.com/books?id=_lF1DZ1OPJQC&q=%22work+breakdown+structure%22+wbs+navy+ship&pg=PA92

  23. Developing a Work Breakdown Structure · retrieved 2022-06-06 · rev 1361649699
    Cite this reference

    MLA "Developing a Work Breakdown Structure." Cicala, Gus (2020), "Developing a Work Breakdown Structure" , The Project Managers Guide to Microsoft Project 2019 , Ber. 2022-06-06. http://link.springer.com/10.1007/978-1-4842-5635-0_6. Accessed 25 November 2026.

    Chicago "Developing a Work Breakdown Structure." Cicala, Gus (2020), "Developing a Work Breakdown Structure" , The Project Managers Guide to Microsoft Project 2019 , Ber. 2022-06-06. http://link.springer.com/10.1007/978-1-4842-5635-0_6.

    APA Cicala, Gus (2020), "Developing a Work Breakdown Structure" , The Project Managers Guide to Microsoft Project 2019 , Ber. (2022). Developing a Work Breakdown Structure. Retrieved November 25, 2026, from http://link.springer.com/10.1007/978-1-4842-5635-0_6

  24. Electronic Industries Alliance Standard Systems Engineering Capability Model EIA-731.1 Wikipedia revision 1361649699, retrieved 2026-11-20 · retrieved 2026-11-19 · rev 1361649699
    Cite this reference

    MLA "Electronic Industries Alliance Standard Systems Engineering Capability Model EIA-731.1 Wikipedia revision 1361649699, retrieved 2026-11-20." Electronic Industries Alliance Standard Systems Engineering Capability Model EIA-731. 2026-11-19. https://en.wikipedia.org/w/index.php?oldid=1361649699. Accessed 25 November 2026.

    Chicago "Electronic Industries Alliance Standard Systems Engineering Capability Model EIA-731.1 Wikipedia revision 1361649699, retrieved 2026-11-20." Electronic Industries Alliance Standard Systems Engineering Capability Model EIA-731. 2026-11-19. https://en.wikipedia.org/w/index.php?oldid=1361649699.

    APA Electronic Industries Alliance Standard Systems Engineering Capability Model EIA-731. (2026). Electronic Industries Alliance Standard Systems Engineering Capability Model EIA-731.1 Wikipedia revision 1361649699, retrieved 2026-11-20. Retrieved November 25, 2026, from https://en.wikipedia.org/w/index.php?oldid=1361649699

  25. Institute of Electrical and Electronics Engineers Standard for Application and Management of the Systems Engineering Process IEEE Std 1220-2005 Wikipedia revision 1361649699, retrieved 2026-11-20 · retrieved 2026-11-19 · rev 1361649699
    Cite this reference

    MLA "Institute of Electrical and Electronics Engineers Standard for Application and Management of the Systems Engineering Process IEEE Std 1220-2005 Wikipedia revision 1361649699, retrieved 2026-11-20." Institute of Electrical and Electronics Engineers Standard for Application and Management of the Systems Engineering Pro. 2026-11-19. https://en.wikipedia.org/w/index.php?oldid=1361649699. Accessed 25 November 2026.

    Chicago "Institute of Electrical and Electronics Engineers Standard for Application and Management of the Systems Engineering Process IEEE Std 1220-2005 Wikipedia revision 1361649699, retrieved 2026-11-20." Institute of Electrical and Electronics Engineers Standard for Application and Management of the Systems Engineering Pro. 2026-11-19. https://en.wikipedia.org/w/index.php?oldid=1361649699.

    APA Institute of Electrical and Electronics Engineers Standard for Application and Management of the Systems Engineering Pro. (2026). Institute of Electrical and Electronics Engineers Standard for Application and Management of the Systems Engineering Process IEEE Std 1220-2005 Wikipedia revision 1361649699, retrieved 2026-11-20. Retrieved November 25, 2026, from https://en.wikipedia.org/w/index.php?oldid=1361649699

  26. How To Use Work Breakdown Structure As A Project Management Tool · retrieved 2026-11-19 · rev 1361649699
    Cite this reference

    MLA "How To Use Work Breakdown Structure As A Project Management Tool." 2026-11-19. https://www.nasdaq.com/articles/how-to-use-work-breakdown-structure-as-a-project-management-tool. Accessed 25 November 2026.

    Chicago "How To Use Work Breakdown Structure As A Project Management Tool." 2026-11-19. https://www.nasdaq.com/articles/how-to-use-work-breakdown-structure-as-a-project-management-tool.

    APA encyclopegia.org. (2026). How To Use Work Breakdown Structure As A Project Management Tool. Retrieved November 25, 2026, from https://www.nasdaq.com/articles/how-to-use-work-breakdown-structure-as-a-project-management-tool

  27. Booz, Allen & Hamilton Earned Value Management Tutorial Module 2: Work Breakdown Structure , Office of Science, Tools & Resources for Project Management , science.energy.gov. Accessed 27. Dec 2011. Wikipedia revision 1361649699, retrieved 2026-11-20 · retrieved 2026-11-19 · rev 1361649699
    Cite this reference

    MLA "Booz, Allen & Hamilton Earned Value Management Tutorial Module 2: Work Breakdown Structure , Office of Science, Tools & Resources for Project Management , science.energy.gov. Accessed 27. Dec 2011. Wikipedia revision 1361649699, retrieved 2026-11-20." Booz, Allen & Hamilton Earned Value Management Tutorial Module 2: Work Breakdown Structure , Office of Science, Tools &. 2026-11-19. http://science.energy.gov/~/media/opa/powerpoint/Final_Module_2.ppt. Accessed 25 November 2026.

    Chicago "Booz, Allen & Hamilton Earned Value Management Tutorial Module 2: Work Breakdown Structure , Office of Science, Tools & Resources for Project Management , science.energy.gov. Accessed 27. Dec 2011. Wikipedia revision 1361649699, retrieved 2026-11-20." Booz, Allen & Hamilton Earned Value Management Tutorial Module 2: Work Breakdown Structure , Office of Science, Tools &. 2026-11-19. http://science.energy.gov/~/media/opa/powerpoint/Final_Module_2.ppt.

    APA Booz, Allen & Hamilton Earned Value Management Tutorial Module 2: Work Breakdown Structure , Office of Science, Tools &. (2026). Booz, Allen & Hamilton Earned Value Management Tutorial Module 2: Work Breakdown Structure , Office of Science, Tools & Resources for Project Management , science.energy.gov. Accessed 27. Dec 2011. Wikipedia revision 1361649699, retrieved 2026-11-20. Retrieved November 25, 2026, from http://science.energy.gov/~/media/opa/powerpoint/Final_Module_2.ppt

  28. a b c Project Management Institute 2021 , §Glossary Section 3. Definitions. Wikipedia revision 1361649699, retrieved 2026-11-20 · retrieved 2026-11-19 · rev 1361649699
    Cite this reference

    MLA "a b c Project Management Institute 2021 , §Glossary Section 3. Definitions. Wikipedia revision 1361649699, retrieved 2026-11-20." a b c Project Management Institute 2021 , §Glossary Section 3. 2026-11-19. https://en.wikipedia.org/w/index.php?oldid=1361649699. Accessed 25 November 2026.

    Chicago "a b c Project Management Institute 2021 , §Glossary Section 3. Definitions. Wikipedia revision 1361649699, retrieved 2026-11-20." a b c Project Management Institute 2021 , §Glossary Section 3. 2026-11-19. https://en.wikipedia.org/w/index.php?oldid=1361649699.

    APA a b c Project Management Institute 2021 , §Glossary Section 3. (2026). a b c Project Management Institute 2021 , §Glossary Section 3. Definitions. Wikipedia revision 1361649699, retrieved 2026-11-20. Retrieved November 25, 2026, from https://en.wikipedia.org/w/index.php?oldid=1361649699

  29. Kerzner, Harold (2009). Project Management: A Systems Approach to Planning, Scheduling, and Controlling (10th ed.). Wiley. ISBN 978-0-470-27870-3 . Wikipedia revision 1361649699, retrieved 2026-11-20 · retrieved 2026-11-19 · rev 1361649699
    Cite this reference

    MLA "Kerzner, Harold (2009). Project Management: A Systems Approach to Planning, Scheduling, and Controlling (10th ed.). Wiley. ISBN 978-0-470-27870-3 . Wikipedia revision 1361649699, retrieved 2026-11-20." Kerzner, Harold (2009). 2026-11-19. https://en.wikipedia.org/wiki/Harold_Kerzner. Accessed 25 November 2026.

    Chicago "Kerzner, Harold (2009). Project Management: A Systems Approach to Planning, Scheduling, and Controlling (10th ed.). Wiley. ISBN 978-0-470-27870-3 . Wikipedia revision 1361649699, retrieved 2026-11-20." Kerzner, Harold (2009). 2026-11-19. https://en.wikipedia.org/wiki/Harold_Kerzner.

    APA Kerzner, Harold (2009). (2026). Kerzner, Harold (2009). Project Management: A Systems Approach to Planning, Scheduling, and Controlling (10th ed.). Wiley. ISBN 978-0-470-27870-3 . Wikipedia revision 1361649699, retrieved 2026-11-20. Retrieved November 25, 2026, from https://en.wikipedia.org/wiki/Harold_Kerzner

  30. a b c NASA (2001). NASA NPR 9501.2D. May 23, 2001. Wikipedia revision 1361649699, retrieved 2026-11-20 · retrieved 2026-11-19 · rev 1361649699
    Cite this reference

    MLA "a b c NASA (2001). NASA NPR 9501.2D. May 23, 2001. Wikipedia revision 1361649699, retrieved 2026-11-20." a b c NASA (2001). 2026-11-19. https://en.wikipedia.org/w/index.php?oldid=1361649699. Accessed 25 November 2026.

    Chicago "a b c NASA (2001). NASA NPR 9501.2D. May 23, 2001. Wikipedia revision 1361649699, retrieved 2026-11-20." a b c NASA (2001). 2026-11-19. https://en.wikipedia.org/w/index.php?oldid=1361649699.

    APA a b c NASA (2001). (2026). a b c NASA (2001). NASA NPR 9501.2D. May 23, 2001. Wikipedia revision 1361649699, retrieved 2026-11-20. Retrieved November 25, 2026, from https://en.wikipedia.org/w/index.php?oldid=1361649699

  31. Systems Engineering Fundamentals. Archived 2006-02-11 at the Wayback Machine Defense Acquisition University Press, 2001 Wikipedia revision 1361649699, retrieved 2026-11-20 · retrieved 2026-11-19 · rev 1361649699
    Cite this reference

    MLA "Systems Engineering Fundamentals. Archived 2006-02-11 at the Wayback Machine Defense Acquisition University Press, 2001 Wikipedia revision 1361649699, retrieved 2026-11-20." Systems Engineering Fundamentals. 2026-11-19. http://www.dau.mil/pubs/pdf/SEFGuide%2001-01.pdf. Accessed 25 November 2026.

    Chicago "Systems Engineering Fundamentals. Archived 2006-02-11 at the Wayback Machine Defense Acquisition University Press, 2001 Wikipedia revision 1361649699, retrieved 2026-11-20." Systems Engineering Fundamentals. 2026-11-19. http://www.dau.mil/pubs/pdf/SEFGuide%2001-01.pdf.

    APA Systems Engineering Fundamentals. (2026). Systems Engineering Fundamentals. Archived 2006-02-11 at the Wayback Machine Defense Acquisition University Press, 2001 Wikipedia revision 1361649699, retrieved 2026-11-20. Retrieved November 25, 2026, from http://www.dau.mil/pubs/pdf/SEFGuide%2001-01.pdf

Cite this article

MLA

"Work breakdown structure." encyclopegia.org, 2026, https://encyclopegia.org/wiki/work-breakdown-structure. Accessed 25 November 2026.

Chicago

"Work breakdown structure." encyclopegia.org. Accessed November 25, 2026. https://encyclopegia.org/wiki/work-breakdown-structure.

APA

encyclopegia.org. (2026). Work breakdown structure. Retrieved November 25, 2026, from https://encyclopegia.org/wiki/work-breakdown-structure

Accessed November 25, 2026 · CC BY-SA 4.0 · citation page · JSON

Claims

PredicateValueSource
release date2022-05-13Wikipedia

Related articles

tooth supporting structure

stub · references available

work

stub · references available

barrier structure

stub · references available

Hubert Work

stub · references available

Work in progress

stub · references available

The Man Who Could Work Miracles

stub · references available

pawn structure

stub · references available

work school

stub · references available
CC BY-SA 4.0 · share-alike · https://en.wikipedia.org/w/index.php?oldid=1361649699 · 0.5 · snapshot enwiki-001361649699

Cite · JSON · Search

Related services and records

Services

  • Estate — measured countries, lanes and facts
  • Intel — live corroborated events
  • Legal — statutes, cases and citations
  • Encyclopedia — articles with inline sources
  • Space — launches, satellites and orbits
  • Search — federated search and reports
  • Pass — passport account and SSO
  • Corpora — read-only corpus origins
  • e01 — self-hosted corpora and tools

Text and metadata only; each target carries its own sources. Missing data is published as no-data, never estimated.