encyclopegia.org

Cite: Work breakdown structure

MLA

"Work breakdown structure." encyclopegia.org, 2026, https://encyclopegia.org/wiki/work-breakdown-structure. Accessed 25 November 2026.

CHICAGO

"Work breakdown structure." encyclopegia.org. Accessed November 25, 2026. https://encyclopegia.org/wiki/work-breakdown-structure.

APA

encyclopegia.org. (2026). Work breakdown structure. Retrieved November 25, 2026, from https://encyclopegia.org/wiki/work-breakdown-structure

Accessed November 25, 2026 · CC BY-SA 4.0

Reference citations

  1. MLA "A guide to project management body of knowledge (Sixth ed.). Project Management Institute, Inc. 2017. p. 715. ISBN 978-1-62825-184-5 . Wikipedia revision 1361649699, retrieved 2026-11-20." A guide to project management body of knowledge (Sixth ed. 2026-11-19. https://en.wikipedia.org/wiki/ISBN_(identifier). Accessed 25 November 2026.

    CHICAGO "A guide to project management body of knowledge (Sixth ed.). Project Management Institute, Inc. 2017. p. 715. ISBN 978-1-62825-184-5 . Wikipedia revision 1361649699, retrieved 2026-11-20." A guide to project management body of knowledge (Sixth ed. 2026-11-19. https://en.wikipedia.org/wiki/ISBN_(identifier).

    APA A guide to project management body of knowledge (Sixth ed. (2026). A guide to project management body of knowledge (Sixth ed.). Project Management Institute, Inc. 2017. p. 715. ISBN 978-1-62825-184-5 . Wikipedia revision 1361649699, retrieved 2026-11-20. Retrieved November 25, 2026, from https://en.wikipedia.org/wiki/ISBN_(identifier)

  2. MLA "Rita, Mulcahy (2018). PMP Exam prep (Ninth ed.). RMC publications. p. 88. ISBN 978-1-943704-04-0 . Wikipedia revision 1361649699, retrieved 2026-11-20." Rita, Mulcahy (2018). 2026-11-19. https://en.wikipedia.org/wiki/ISBN_(identifier). Accessed 25 November 2026.

    CHICAGO "Rita, Mulcahy (2018). PMP Exam prep (Ninth ed.). RMC publications. p. 88. ISBN 978-1-943704-04-0 . Wikipedia revision 1361649699, retrieved 2026-11-20." Rita, Mulcahy (2018). 2026-11-19. https://en.wikipedia.org/wiki/ISBN_(identifier).

    APA Rita, Mulcahy (2018). (2026). Rita, Mulcahy (2018). PMP Exam prep (Ninth ed.). RMC publications. p. 88. ISBN 978-1-943704-04-0 . Wikipedia revision 1361649699, retrieved 2026-11-20. Retrieved November 25, 2026, from https://en.wikipedia.org/wiki/ISBN_(identifier)

  3. MLA "Community Guide of the PMI-ACP Adaptive Planning." 2026-11-19. https://www.projectmanagement.com/wikis/295452/Progressive-Elaboration. Accessed 25 November 2026.

    CHICAGO "Community Guide of the PMI-ACP Adaptive Planning." 2026-11-19. https://www.projectmanagement.com/wikis/295452/Progressive-Elaboration.

    APA encyclopegia.org. (2026). Community Guide of the PMI-ACP Adaptive Planning. Retrieved November 25, 2026, from https://www.projectmanagement.com/wikis/295452/Progressive-Elaboration

  4. MLA "Earned Value Project Management." Fleming, Quentin W. 2026-11-19. http://www.crosstalkonline.org/storage/issue-archives/1998/199807/199807-0-Issue.pdf. Accessed 25 November 2026.

    CHICAGO "Earned Value Project Management." Fleming, Quentin W. 2026-11-19. http://www.crosstalkonline.org/storage/issue-archives/1998/199807/199807-0-Issue.pdf.

    APA Fleming, Quentin W. (2026). Earned Value Project Management. Retrieved November 25, 2026, from http://www.crosstalkonline.org/storage/issue-archives/1998/199807/199807-0-Issue.pdf

  5. MLA "Haugan, Gregory T., Effective Work Breakdown Structures, pp7-8 Wikipedia revision 1361649699, retrieved 2026-11-20." Haugan, Gregory T. 2026-11-19. https://en.wikipedia.org/w/index.php?oldid=1361649699. Accessed 25 November 2026.

    CHICAGO "Haugan, Gregory T., Effective Work Breakdown Structures, pp7-8 Wikipedia revision 1361649699, retrieved 2026-11-20." Haugan, Gregory T. 2026-11-19. https://en.wikipedia.org/w/index.php?oldid=1361649699.

    APA Haugan, Gregory T. (2026). Haugan, Gregory T., Effective Work Breakdown Structures, pp7-8 Wikipedia revision 1361649699, retrieved 2026-11-20. Retrieved November 25, 2026, from https://en.wikipedia.org/w/index.php?oldid=1361649699

  6. MLA "DOD and NASA Guide, PERT/COST System Design, June 1962 Wikipedia revision 1361649699, retrieved 2026-11-20." 2026-11-19. https://en.wikipedia.org/w/index.php?oldid=1361649699. Accessed 25 November 2026.

    CHICAGO "DOD and NASA Guide, PERT/COST System Design, June 1962 Wikipedia revision 1361649699, retrieved 2026-11-20." 2026-11-19. https://en.wikipedia.org/w/index.php?oldid=1361649699.

    APA encyclopegia.org. (2026). DOD and NASA Guide, PERT/COST System Design, June 1962 Wikipedia revision 1361649699, retrieved 2026-11-20. Retrieved November 25, 2026, from https://en.wikipedia.org/w/index.php?oldid=1361649699

  7. MLA "Hamilton, R. L., Study of Methods for Evaluation of the PERT/Cost Management System , MITRE Corporation , June 1964 Wikipedia revision 1361649699, retrieved 2026-11-20." Hamilton, R. 2026-11-19. https://web.archive.org/web/20110604181820/http://handle.dtic.mil/100.2/AD603425. Accessed 25 November 2026.

    CHICAGO "Hamilton, R. L., Study of Methods for Evaluation of the PERT/Cost Management System , MITRE Corporation , June 1964 Wikipedia revision 1361649699, retrieved 2026-11-20." Hamilton, R. 2026-11-19. https://web.archive.org/web/20110604181820/http://handle.dtic.mil/100.2/AD603425.

    APA Hamilton, R. (2026). Hamilton, R. L., Study of Methods for Evaluation of the PERT/Cost Management System , MITRE Corporation , June 1964 Wikipedia revision 1361649699, retrieved 2026-11-20. Retrieved November 25, 2026, from https://web.archive.org/web/20110604181820/http://handle.dtic.mil/100.2/AD603425

  8. MLA "MIL-STD-881, 1 November 1968 Wikipedia revision 1361649699, retrieved 2026-11-20." 2026-11-19. https://en.wikipedia.org/w/index.php?oldid=1361649699. Accessed 25 November 2026.

    CHICAGO "MIL-STD-881, 1 November 1968 Wikipedia revision 1361649699, retrieved 2026-11-20." 2026-11-19. https://en.wikipedia.org/w/index.php?oldid=1361649699.

    APA encyclopegia.org. (2026). MIL-STD-881, 1 November 1968 Wikipedia revision 1361649699, retrieved 2026-11-20. Retrieved November 25, 2026, from https://en.wikipedia.org/w/index.php?oldid=1361649699

  9. MLA "Haugan, Gregory T., The Work Breakdown Structure in Government Contracting, Management Concepts, 2003 ISBN 978-1567261202 Wikipedia revision 1361649699, retrieved 2026-11-20." Haugan, Gregory T. 2026-11-19. https://en.wikipedia.org/wiki/ISBN_(identifier). Accessed 25 November 2026.

    CHICAGO "Haugan, Gregory T., The Work Breakdown Structure in Government Contracting, Management Concepts, 2003 ISBN 978-1567261202 Wikipedia revision 1361649699, retrieved 2026-11-20." Haugan, Gregory T. 2026-11-19. https://en.wikipedia.org/wiki/ISBN_(identifier).

    APA Haugan, Gregory T. (2026). Haugan, Gregory T., The Work Breakdown Structure in Government Contracting, Management Concepts, 2003 ISBN 978-1567261202 Wikipedia revision 1361649699, retrieved 2026-11-20. Retrieved November 25, 2026, from https://en.wikipedia.org/wiki/ISBN_(identifier)

  10. MLA "Effective Work Breakdown Structures By Gregory T. Haugan, Published by Management Concepts, 2001, ISBN 1567261353 , p.17 Wikipedia revision 1361649699, retrieved 2026-11-20." Effective Work Breakdown Structures By Gregory T. 2026-11-19. https://en.wikipedia.org/wiki/ISBN_(identifier). Accessed 25 November 2026.

    CHICAGO "Effective Work Breakdown Structures By Gregory T. Haugan, Published by Management Concepts, 2001, ISBN 1567261353 , p.17 Wikipedia revision 1361649699, retrieved 2026-11-20." Effective Work Breakdown Structures By Gregory T. 2026-11-19. https://en.wikipedia.org/wiki/ISBN_(identifier).

    APA Effective Work Breakdown Structures By Gregory T. (2026). Effective Work Breakdown Structures By Gregory T. Haugan, Published by Management Concepts, 2001, ISBN 1567261353 , p.17 Wikipedia revision 1361649699, retrieved 2026-11-20. Retrieved November 25, 2026, from https://en.wikipedia.org/wiki/ISBN_(identifier)

  11. MLA "Glossary of Defense Acquisition Acronyms and Terms: Contract Work Breakdown Structure (CWBS)." 2026-11-19. https://web.archive.org/web/20161019141035/https://dap.dau.mil/glossary/pages/1637.aspx. Accessed 25 November 2026.

    CHICAGO "Glossary of Defense Acquisition Acronyms and Terms: Contract Work Breakdown Structure (CWBS)." 2026-11-19. https://web.archive.org/web/20161019141035/https://dap.dau.mil/glossary/pages/1637.aspx.

    APA encyclopegia.org. (2026). Glossary of Defense Acquisition Acronyms and Terms: Contract Work Breakdown Structure (CWBS). Retrieved November 25, 2026, from https://web.archive.org/web/20161019141035/https://dap.dau.mil/glossary/pages/1637.aspx

  12. MLA "Practice Standard for Work Breakdown Structures (Second Edition) , published by the Project Management Institute , ISBN 1933890134 , page 8 Wikipedia revision 1361649699, retrieved 2026-11-20." Practice Standard for Work Breakdown Structures (Second Edition) , published by the Project Management Institute , ISBN. 2026-11-19. https://en.wikipedia.org/wiki/Project_Management_Institute. Accessed 25 November 2026.

    CHICAGO "Practice Standard for Work Breakdown Structures (Second Edition) , published by the Project Management Institute , ISBN 1933890134 , page 8 Wikipedia revision 1361649699, retrieved 2026-11-20." Practice Standard for Work Breakdown Structures (Second Edition) , published by the Project Management Institute , ISBN. 2026-11-19. https://en.wikipedia.org/wiki/Project_Management_Institute.

    APA Practice Standard for Work Breakdown Structures (Second Edition) , published by the Project Management Institute , ISBN. (2026). Practice Standard for Work Breakdown Structures (Second Edition) , published by the Project Management Institute , ISBN 1933890134 , page 8 Wikipedia revision 1361649699, retrieved 2026-11-20. Retrieved November 25, 2026, from https://en.wikipedia.org/wiki/Project_Management_Institute

  13. MLA "Swiderski, Mark A., PMP workbreakdownstructure.com , PMBOK-Work Breakdown Structures. Accessed 16. June 2013. Wikipedia revision 1361649699, retrieved 2026-11-20." Swiderski, Mark A. 2026-11-19. https://www.workbreakdownstructure.com/work-breakdown-structure-according-to-pmbok.php. Accessed 25 November 2026.

    CHICAGO "Swiderski, Mark A., PMP workbreakdownstructure.com , PMBOK-Work Breakdown Structures. Accessed 16. June 2013. Wikipedia revision 1361649699, retrieved 2026-11-20." Swiderski, Mark A. 2026-11-19. https://www.workbreakdownstructure.com/work-breakdown-structure-according-to-pmbok.php.

    APA Swiderski, Mark A. (2026). Swiderski, Mark A., PMP workbreakdownstructure.com , PMBOK-Work Breakdown Structures. Accessed 16. June 2013. Wikipedia revision 1361649699, retrieved 2026-11-20. Retrieved November 25, 2026, from https://www.workbreakdownstructure.com/work-breakdown-structure-according-to-pmbok.php

  14. MLA "MIL-STD-881C, Work Breakdown Structures for Defense Materiel Items, 3 October 2011, ¶4.3 Wikipedia revision 1361649699, retrieved 2026-11-20." MIL-STD-881C, Work Breakdown Structures for Defense Materiel Items, 3 October 2011, ¶4. 2026-11-19. https://en.wikipedia.org/w/index.php?oldid=1361649699. Accessed 25 November 2026.

    CHICAGO "MIL-STD-881C, Work Breakdown Structures for Defense Materiel Items, 3 October 2011, ¶4.3 Wikipedia revision 1361649699, retrieved 2026-11-20." MIL-STD-881C, Work Breakdown Structures for Defense Materiel Items, 3 October 2011, ¶4. 2026-11-19. https://en.wikipedia.org/w/index.php?oldid=1361649699.

    APA MIL-STD-881C, Work Breakdown Structures for Defense Materiel Items, 3 October 2011, ¶4. (2026). MIL-STD-881C, Work Breakdown Structures for Defense Materiel Items, 3 October 2011, ¶4.3 Wikipedia revision 1361649699, retrieved 2026-11-20. Retrieved November 25, 2026, from https://en.wikipedia.org/w/index.php?oldid=1361649699

  15. MLA "MIL-STD-881C, Work Breakdown Structures for Defense Materiel Items, 3 October 2011 Appendix A, ¶A.3 Wikipedia revision 1361649699, retrieved 2026-11-20." MIL-STD-881C, Work Breakdown Structures for Defense Materiel Items, 3 October 2011 Appendix A, ¶A. 2026-11-19. https://en.wikipedia.org/w/index.php?oldid=1361649699. Accessed 25 November 2026.

    CHICAGO "MIL-STD-881C, Work Breakdown Structures for Defense Materiel Items, 3 October 2011 Appendix A, ¶A.3 Wikipedia revision 1361649699, retrieved 2026-11-20." MIL-STD-881C, Work Breakdown Structures for Defense Materiel Items, 3 October 2011 Appendix A, ¶A. 2026-11-19. https://en.wikipedia.org/w/index.php?oldid=1361649699.

    APA MIL-STD-881C, Work Breakdown Structures for Defense Materiel Items, 3 October 2011 Appendix A, ¶A. (2026). MIL-STD-881C, Work Breakdown Structures for Defense Materiel Items, 3 October 2011 Appendix A, ¶A.3 Wikipedia revision 1361649699, retrieved 2026-11-20. Retrieved November 25, 2026, from https://en.wikipedia.org/w/index.php?oldid=1361649699

  16. MLA "MIL-STD-881C, Work Breakdown Structures for Defense Materiel Items, 3 October 2011, ¶3.1.4 Wikipedia revision 1361649699, retrieved 2026-11-20." MIL-STD-881C, Work Breakdown Structures for Defense Materiel Items, 3 October 2011, ¶3. 2026-11-19. https://en.wikipedia.org/w/index.php?oldid=1361649699. Accessed 25 November 2026.

    CHICAGO "MIL-STD-881C, Work Breakdown Structures for Defense Materiel Items, 3 October 2011, ¶3.1.4 Wikipedia revision 1361649699, retrieved 2026-11-20." MIL-STD-881C, Work Breakdown Structures for Defense Materiel Items, 3 October 2011, ¶3. 2026-11-19. https://en.wikipedia.org/w/index.php?oldid=1361649699.

    APA MIL-STD-881C, Work Breakdown Structures for Defense Materiel Items, 3 October 2011, ¶3. (2026). MIL-STD-881C, Work Breakdown Structures for Defense Materiel Items, 3 October 2011, ¶3.1.4 Wikipedia revision 1361649699, retrieved 2026-11-20. Retrieved November 25, 2026, from https://en.wikipedia.org/w/index.php?oldid=1361649699

  17. MLA "MIL-STD-881C, Work Breakdown Structures for Defense Materiel Items, 3 October 2011, ¶1.4.1 Wikipedia revision 1361649699, retrieved 2026-11-20." MIL-STD-881C, Work Breakdown Structures for Defense Materiel Items, 3 October 2011, ¶1. 2026-11-19. https://en.wikipedia.org/w/index.php?oldid=1361649699. Accessed 25 November 2026.

    CHICAGO "MIL-STD-881C, Work Breakdown Structures for Defense Materiel Items, 3 October 2011, ¶1.4.1 Wikipedia revision 1361649699, retrieved 2026-11-20." MIL-STD-881C, Work Breakdown Structures for Defense Materiel Items, 3 October 2011, ¶1. 2026-11-19. https://en.wikipedia.org/w/index.php?oldid=1361649699.

    APA MIL-STD-881C, Work Breakdown Structures for Defense Materiel Items, 3 October 2011, ¶1. (2026). MIL-STD-881C, Work Breakdown Structures for Defense Materiel Items, 3 October 2011, ¶1.4.1 Wikipedia revision 1361649699, retrieved 2026-11-20. Retrieved November 25, 2026, from https://en.wikipedia.org/w/index.php?oldid=1361649699

  18. MLA "MIL-STD-881C, Work Breakdown Structures for Defense Materiel Items, 3 October 2011, ¶2.2.4.2 Wikipedia revision 1361649699, retrieved 2026-11-20." MIL-STD-881C, Work Breakdown Structures for Defense Materiel Items, 3 October 2011, ¶2. 2026-11-19. https://en.wikipedia.org/w/index.php?oldid=1361649699. Accessed 25 November 2026.

    CHICAGO "MIL-STD-881C, Work Breakdown Structures for Defense Materiel Items, 3 October 2011, ¶2.2.4.2 Wikipedia revision 1361649699, retrieved 2026-11-20." MIL-STD-881C, Work Breakdown Structures for Defense Materiel Items, 3 October 2011, ¶2. 2026-11-19. https://en.wikipedia.org/w/index.php?oldid=1361649699.

    APA MIL-STD-881C, Work Breakdown Structures for Defense Materiel Items, 3 October 2011, ¶2. (2026). MIL-STD-881C, Work Breakdown Structures for Defense Materiel Items, 3 October 2011, ¶2.2.4.2 Wikipedia revision 1361649699, retrieved 2026-11-20. Retrieved November 25, 2026, from https://en.wikipedia.org/w/index.php?oldid=1361649699

  19. MLA "MIL-STD-881C, Work Breakdown Structures for Defense Materiel Items, 3 October 2011, ¶Fig.3-6 Wikipedia revision 1361649699, retrieved 2026-11-20." MIL-STD-881C, Work Breakdown Structures for Defense Materiel Items, 3 October 2011, ¶Fig. 2026-11-19. https://en.wikipedia.org/w/index.php?oldid=1361649699. Accessed 25 November 2026.

    CHICAGO "MIL-STD-881C, Work Breakdown Structures for Defense Materiel Items, 3 October 2011, ¶Fig.3-6 Wikipedia revision 1361649699, retrieved 2026-11-20." MIL-STD-881C, Work Breakdown Structures for Defense Materiel Items, 3 October 2011, ¶Fig. 2026-11-19. https://en.wikipedia.org/w/index.php?oldid=1361649699.

    APA MIL-STD-881C, Work Breakdown Structures for Defense Materiel Items, 3 October 2011, ¶Fig. (2026). MIL-STD-881C, Work Breakdown Structures for Defense Materiel Items, 3 October 2011, ¶Fig.3-6 Wikipedia revision 1361649699, retrieved 2026-11-20. Retrieved November 25, 2026, from https://en.wikipedia.org/w/index.php?oldid=1361649699

  20. MLA "MIL-STD-881C, Work Breakdown Structures for Defense Materiel Items, 3 October 2011, ¶Fig.3-1 Wikipedia revision 1361649699, retrieved 2026-11-20." MIL-STD-881C, Work Breakdown Structures for Defense Materiel Items, 3 October 2011, ¶Fig. 2026-11-19. https://en.wikipedia.org/w/index.php?oldid=1361649699. Accessed 25 November 2026.

    CHICAGO "MIL-STD-881C, Work Breakdown Structures for Defense Materiel Items, 3 October 2011, ¶Fig.3-1 Wikipedia revision 1361649699, retrieved 2026-11-20." MIL-STD-881C, Work Breakdown Structures for Defense Materiel Items, 3 October 2011, ¶Fig. 2026-11-19. https://en.wikipedia.org/w/index.php?oldid=1361649699.

    APA MIL-STD-881C, Work Breakdown Structures for Defense Materiel Items, 3 October 2011, ¶Fig. (2026). MIL-STD-881C, Work Breakdown Structures for Defense Materiel Items, 3 October 2011, ¶Fig.3-1 Wikipedia revision 1361649699, retrieved 2026-11-20. Retrieved November 25, 2026, from https://en.wikipedia.org/w/index.php?oldid=1361649699

  21. MLA "MIL-STD-881C, Work Breakdown Structures for Defense Materiel Items, 3 October 2011, ¶Appendix E Wikipedia revision 1361649699, retrieved 2026-11-20." MIL-STD-881C, Work Breakdown Structures for Defense Materiel Items, 3 October 2011, ¶Appendix E Wikipedia revision 13616. 2026-11-19. https://en.wikipedia.org/w/index.php?oldid=1361649699. Accessed 25 November 2026.

    CHICAGO "MIL-STD-881C, Work Breakdown Structures for Defense Materiel Items, 3 October 2011, ¶Appendix E Wikipedia revision 1361649699, retrieved 2026-11-20." MIL-STD-881C, Work Breakdown Structures for Defense Materiel Items, 3 October 2011, ¶Appendix E Wikipedia revision 13616. 2026-11-19. https://en.wikipedia.org/w/index.php?oldid=1361649699.

    APA MIL-STD-881C, Work Breakdown Structures for Defense Materiel Items, 3 October 2011, ¶Appendix E Wikipedia revision 13616. (2026). MIL-STD-881C, Work Breakdown Structures for Defense Materiel Items, 3 October 2011, ¶Appendix E Wikipedia revision 1361649699, retrieved 2026-11-20. Retrieved November 25, 2026, from https://en.wikipedia.org/w/index.php?oldid=1361649699

  22. MLA "Gilmer, Thomas (1982-08-04). Introduction to Naval Architecture . Naval Institute Press. p. 98. ISBN 9780870213182 . Wikipedia revision 1361649699, retrieved 2026-11-20." Gilmer, Thomas (1982-08-04). 2026-11-19. https://books.google.com/books?id=_lF1DZ1OPJQC&q=%22work+breakdown+structure%22+wbs+navy+ship&pg=PA92. Accessed 25 November 2026.

    CHICAGO "Gilmer, Thomas (1982-08-04). Introduction to Naval Architecture . Naval Institute Press. p. 98. ISBN 9780870213182 . Wikipedia revision 1361649699, retrieved 2026-11-20." Gilmer, Thomas (1982-08-04). 2026-11-19. https://books.google.com/books?id=_lF1DZ1OPJQC&q=%22work+breakdown+structure%22+wbs+navy+ship&pg=PA92.

    APA Gilmer, Thomas (1982-08-04). (2026). Gilmer, Thomas (1982-08-04). Introduction to Naval Architecture . Naval Institute Press. p. 98. ISBN 9780870213182 . Wikipedia revision 1361649699, retrieved 2026-11-20. Retrieved November 25, 2026, from https://books.google.com/books?id=_lF1DZ1OPJQC&q=%22work+breakdown+structure%22+wbs+navy+ship&pg=PA92

  23. MLA "Developing a Work Breakdown Structure." Cicala, Gus (2020), "Developing a Work Breakdown Structure" , The Project Managers Guide to Microsoft Project 2019 , Ber. 2022-06-06. http://link.springer.com/10.1007/978-1-4842-5635-0_6. Accessed 25 November 2026.

    CHICAGO "Developing a Work Breakdown Structure." Cicala, Gus (2020), "Developing a Work Breakdown Structure" , The Project Managers Guide to Microsoft Project 2019 , Ber. 2022-06-06. http://link.springer.com/10.1007/978-1-4842-5635-0_6.

    APA Cicala, Gus (2020), "Developing a Work Breakdown Structure" , The Project Managers Guide to Microsoft Project 2019 , Ber. (2022). Developing a Work Breakdown Structure. Retrieved November 25, 2026, from http://link.springer.com/10.1007/978-1-4842-5635-0_6

  24. MLA "Electronic Industries Alliance Standard Systems Engineering Capability Model EIA-731.1 Wikipedia revision 1361649699, retrieved 2026-11-20." Electronic Industries Alliance Standard Systems Engineering Capability Model EIA-731. 2026-11-19. https://en.wikipedia.org/w/index.php?oldid=1361649699. Accessed 25 November 2026.

    CHICAGO "Electronic Industries Alliance Standard Systems Engineering Capability Model EIA-731.1 Wikipedia revision 1361649699, retrieved 2026-11-20." Electronic Industries Alliance Standard Systems Engineering Capability Model EIA-731. 2026-11-19. https://en.wikipedia.org/w/index.php?oldid=1361649699.

    APA Electronic Industries Alliance Standard Systems Engineering Capability Model EIA-731. (2026). Electronic Industries Alliance Standard Systems Engineering Capability Model EIA-731.1 Wikipedia revision 1361649699, retrieved 2026-11-20. Retrieved November 25, 2026, from https://en.wikipedia.org/w/index.php?oldid=1361649699

  25. MLA "Institute of Electrical and Electronics Engineers Standard for Application and Management of the Systems Engineering Process IEEE Std 1220-2005 Wikipedia revision 1361649699, retrieved 2026-11-20." Institute of Electrical and Electronics Engineers Standard for Application and Management of the Systems Engineering Pro. 2026-11-19. https://en.wikipedia.org/w/index.php?oldid=1361649699. Accessed 25 November 2026.

    CHICAGO "Institute of Electrical and Electronics Engineers Standard for Application and Management of the Systems Engineering Process IEEE Std 1220-2005 Wikipedia revision 1361649699, retrieved 2026-11-20." Institute of Electrical and Electronics Engineers Standard for Application and Management of the Systems Engineering Pro. 2026-11-19. https://en.wikipedia.org/w/index.php?oldid=1361649699.

    APA Institute of Electrical and Electronics Engineers Standard for Application and Management of the Systems Engineering Pro. (2026). Institute of Electrical and Electronics Engineers Standard for Application and Management of the Systems Engineering Process IEEE Std 1220-2005 Wikipedia revision 1361649699, retrieved 2026-11-20. Retrieved November 25, 2026, from https://en.wikipedia.org/w/index.php?oldid=1361649699

  26. MLA "How To Use Work Breakdown Structure As A Project Management Tool." 2026-11-19. https://www.nasdaq.com/articles/how-to-use-work-breakdown-structure-as-a-project-management-tool. Accessed 25 November 2026.

    CHICAGO "How To Use Work Breakdown Structure As A Project Management Tool." 2026-11-19. https://www.nasdaq.com/articles/how-to-use-work-breakdown-structure-as-a-project-management-tool.

    APA encyclopegia.org. (2026). How To Use Work Breakdown Structure As A Project Management Tool. Retrieved November 25, 2026, from https://www.nasdaq.com/articles/how-to-use-work-breakdown-structure-as-a-project-management-tool

  27. MLA "Booz, Allen & Hamilton Earned Value Management Tutorial Module 2: Work Breakdown Structure , Office of Science, Tools & Resources for Project Management , science.energy.gov. Accessed 27. Dec 2011. Wikipedia revision 1361649699, retrieved 2026-11-20." Booz, Allen & Hamilton Earned Value Management Tutorial Module 2: Work Breakdown Structure , Office of Science, Tools &. 2026-11-19. http://science.energy.gov/~/media/opa/powerpoint/Final_Module_2.ppt. Accessed 25 November 2026.

    CHICAGO "Booz, Allen & Hamilton Earned Value Management Tutorial Module 2: Work Breakdown Structure , Office of Science, Tools & Resources for Project Management , science.energy.gov. Accessed 27. Dec 2011. Wikipedia revision 1361649699, retrieved 2026-11-20." Booz, Allen & Hamilton Earned Value Management Tutorial Module 2: Work Breakdown Structure , Office of Science, Tools &. 2026-11-19. http://science.energy.gov/~/media/opa/powerpoint/Final_Module_2.ppt.

    APA Booz, Allen & Hamilton Earned Value Management Tutorial Module 2: Work Breakdown Structure , Office of Science, Tools &. (2026). Booz, Allen & Hamilton Earned Value Management Tutorial Module 2: Work Breakdown Structure , Office of Science, Tools & Resources for Project Management , science.energy.gov. Accessed 27. Dec 2011. Wikipedia revision 1361649699, retrieved 2026-11-20. Retrieved November 25, 2026, from http://science.energy.gov/~/media/opa/powerpoint/Final_Module_2.ppt

  28. MLA "a b c Project Management Institute 2021 , §Glossary Section 3. Definitions. Wikipedia revision 1361649699, retrieved 2026-11-20." a b c Project Management Institute 2021 , §Glossary Section 3. 2026-11-19. https://en.wikipedia.org/w/index.php?oldid=1361649699. Accessed 25 November 2026.

    CHICAGO "a b c Project Management Institute 2021 , §Glossary Section 3. Definitions. Wikipedia revision 1361649699, retrieved 2026-11-20." a b c Project Management Institute 2021 , §Glossary Section 3. 2026-11-19. https://en.wikipedia.org/w/index.php?oldid=1361649699.

    APA a b c Project Management Institute 2021 , §Glossary Section 3. (2026). a b c Project Management Institute 2021 , §Glossary Section 3. Definitions. Wikipedia revision 1361649699, retrieved 2026-11-20. Retrieved November 25, 2026, from https://en.wikipedia.org/w/index.php?oldid=1361649699

  29. MLA "Kerzner, Harold (2009). Project Management: A Systems Approach to Planning, Scheduling, and Controlling (10th ed.). Wiley. ISBN 978-0-470-27870-3 . Wikipedia revision 1361649699, retrieved 2026-11-20." Kerzner, Harold (2009). 2026-11-19. https://en.wikipedia.org/wiki/Harold_Kerzner. Accessed 25 November 2026.

    CHICAGO "Kerzner, Harold (2009). Project Management: A Systems Approach to Planning, Scheduling, and Controlling (10th ed.). Wiley. ISBN 978-0-470-27870-3 . Wikipedia revision 1361649699, retrieved 2026-11-20." Kerzner, Harold (2009). 2026-11-19. https://en.wikipedia.org/wiki/Harold_Kerzner.

    APA Kerzner, Harold (2009). (2026). Kerzner, Harold (2009). Project Management: A Systems Approach to Planning, Scheduling, and Controlling (10th ed.). Wiley. ISBN 978-0-470-27870-3 . Wikipedia revision 1361649699, retrieved 2026-11-20. Retrieved November 25, 2026, from https://en.wikipedia.org/wiki/Harold_Kerzner

  30. MLA "a b c NASA (2001). NASA NPR 9501.2D. May 23, 2001. Wikipedia revision 1361649699, retrieved 2026-11-20." a b c NASA (2001). 2026-11-19. https://en.wikipedia.org/w/index.php?oldid=1361649699. Accessed 25 November 2026.

    CHICAGO "a b c NASA (2001). NASA NPR 9501.2D. May 23, 2001. Wikipedia revision 1361649699, retrieved 2026-11-20." a b c NASA (2001). 2026-11-19. https://en.wikipedia.org/w/index.php?oldid=1361649699.

    APA a b c NASA (2001). (2026). a b c NASA (2001). NASA NPR 9501.2D. May 23, 2001. Wikipedia revision 1361649699, retrieved 2026-11-20. Retrieved November 25, 2026, from https://en.wikipedia.org/w/index.php?oldid=1361649699

  31. MLA "Systems Engineering Fundamentals. Archived 2006-02-11 at the Wayback Machine Defense Acquisition University Press, 2001 Wikipedia revision 1361649699, retrieved 2026-11-20." Systems Engineering Fundamentals. 2026-11-19. http://www.dau.mil/pubs/pdf/SEFGuide%2001-01.pdf. Accessed 25 November 2026.

    CHICAGO "Systems Engineering Fundamentals. Archived 2006-02-11 at the Wayback Machine Defense Acquisition University Press, 2001 Wikipedia revision 1361649699, retrieved 2026-11-20." Systems Engineering Fundamentals. 2026-11-19. http://www.dau.mil/pubs/pdf/SEFGuide%2001-01.pdf.

    APA Systems Engineering Fundamentals. (2026). Systems Engineering Fundamentals. Archived 2006-02-11 at the Wayback Machine Defense Acquisition University Press, 2001 Wikipedia revision 1361649699, retrieved 2026-11-20. Retrieved November 25, 2026, from http://www.dau.mil/pubs/pdf/SEFGuide%2001-01.pdf

Back to article · JSON

Related services and records

Services

  • Estate — measured countries, lanes and facts
  • Intel — live corroborated events
  • Legal — statutes, cases and citations
  • Encyclopedia — articles with inline sources
  • Space — launches, satellites and orbits
  • Search — federated search and reports
  • Pass — passport account and SSO
  • Corpora — read-only corpus origins
  • e01 — self-hosted corpora and tools

Text and metadata only; each target carries its own sources. Missing data is published as no-data, never estimated.